← Back
Two family brick
151 CHAUNCEY STREET
BROOKLYN · BIN 3047825
💬 Discuss this project
1886Year Built
2Stories
B1Building Class
R6BZoning
2,496 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family brick · Owner of record: BH 151 CHAUNCEY LLC · 2,000 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Roof2p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 11p · 1 filing · 20 docs
Cellar6p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
10/31/2025$2.1M—BH 151 CHAUNCEY LLC → Private party$841/sf building
08/30/2024$925K—— → —$371/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP409/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical103/22/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371209/22/2025
NIC DESIGN INC9758203/21/2025
Building Lifecycle
All (27)Filed (4)Permit Issued (3)Signed Off (2)Violation (3)Inspection (5)Special Inspection (10)
09/26/2025
Signed off — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01119575-I1
09/22/2025
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01119575-P2
09/03/2025
Signed off — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01119575-S1
05/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/11/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
04/03/2025
Permit issued — Plumbing
B01119575-S1-PL
04/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
04/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
04/02/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
04/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
04/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
04/01/2025
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01119575-P1
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
03/31/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
03/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
03/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
03/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
03/21/2025
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01119575-S1
03/20/2025
Permit issued — Mechanical Systems
B01119575-I1-GC-CX
03/12/2025
Permit issued — General Construction
B01119575-I1-GC-CX
03/10/2025
Filed — Alteration
INSTALL NEW ELE. H.W.H., BATHROOM AND KITCHEN FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01119575-I1
07/17/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
07/17/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/22/2005
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC04/03/2025
DOB NOWMechanical SystemsSigned-offCUBE BUILDERS GROUP NY03/20/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY03/12/2025
1 project · most recent 10/16/2024
General Wiring
FiledStatusContractorScope
10/16/2024CompleteJOSEPH WEINSTEIN ELECTRICGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
05/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/11/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/11/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/02/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
04/02/2025Fire-Resistant Penetrations and JointsEric Sunspecial
04/02/2025Energy Code Compliance InspectionsEric Sunprogress
04/02/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
04/02/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
03/31/2025Fire-Resistant Penetrations and JointsEric Sunspecial
03/31/2025Energy Code Compliance InspectionsEric Sunprogress
03/31/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
03/31/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
03/31/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/22/2026B01119575-I1Request digital key ↗
08/22/2026B01119575-P1Request digital key ↗
08/22/2026B01119575-S1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits4
▸DOB NOWLPC Approval/Permit4
08/13/2026B01119575-P1Open ↗
08/13/2026B01119575-S1Open ↗
08/13/2026B01119575-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/22/2026B01119575-S1Open ↗
08/22/2026B01119575-I1Open ↗
08/22/2026B01119575-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
08/25/2026B01119575-S1Open ↗
08/25/2026B01119575-S1Open ↗
08/22/2026B01119575-P1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026B01119575-S1Open ↗
08/22/2026B01119575-P1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/22/2026B01119575-P1Open ↗
08/22/2026B01119575-S1Open ↗
08/22/2026B01119575-I1Open ↗
Showing 3 of 4 on file for this type