← Back
Two family frame
151 DRIGGS STREET
STATEN ISLAND · Great Kills-Eltingville · BIN 5067627
💬 Discuss this project
2023Year Built
2Stories
B2Building Class
R3AZoning
2,940 sfGross Floor Area
2Units
3 Open Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Two family frame · 5,700 sf lot · 0.52 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
Floor 2Under Construction1p · 1 filing · 20 docs
Floor 1Under Construction2p · 1 filing · 20 docs
CellarUnder Construction1p · 1 filing · 20 docs
Site & exteriorUnder Construction2p · 2 filings · 4 docs
Filed — no permit issued2p · 2 filings · 9 docs
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.803/21/2026
DAWN PONISI103/21/2026
SKYLINE BUILDING CONSULTING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
PREMIER GROUP INCGeneral Contractor507/08/2026
WANKO WINDOWSGeneral Contractor209/30/2026
ALKA CONTRACTING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TAMBORRA ARCHITECTURE5339312/18/2024
Building Lifecycle
All (71)Filed (6)Permit Issued (6)Signed Off (1)Violation (11)Inspection (1)Objection (16)Special Inspection (30)
09/29/2026
Permit issued — Foundation
S00681513-I1-GC
09/28/2026
Permit issued — Construction Fence
S08026115-I1-FN
06/15/2026
Permit issued — Foundation
S00681513-I1-GC
04/19/2026
Objection resolved — Resolved
04/19/2026
Objection resolved — Resolved
04/19/2026
Objection resolved — Resolved
04/19/2026
Objection resolved — Resolved
04/14/2026
Permit issued — Construction Fence
S08026115-I1-FN
02/08/2026
Special inspection requirement — Metering
Nicholas Tamborra
01/13/2026
Violation issued (ECB, open)
Construction
01/13/2026
Violation issued (ECB, open)
Construction
01/12/2026
Special inspection requirement — Fire-Resistance Rated Construction
Nicholas Tamborra
01/12/2026
Special inspection requirement — Interior lighting power
Nicholas Tamborra
01/12/2026
Special inspection requirement — Maintenance information
Nicholas Tamborra
09/09/2025
Objection raised — Structural
09/09/2025
Objection raised — Scope
09/09/2025
Objection raised — Scope
08/19/2025
Filed — New Building
Install new 13' Curb Cut which includes 1'-6" splays both sides on the North Side of Driggs Street 159' East of the Corner of William Avenue and Driggs Street for this Associated New Building Application # S00681513-I1
S00681513-S1
08/19/2025
Special inspection requirement — Sprinkler Systems
Nicholas Tamborra
12/19/2024
Objection raised — Scope
12/18/2024
Filed — Alteration
S01125328-I1
10/10/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicholas Tamborra
10/10/2024
Special inspection requirement — HVAC-R and service water heating equipment
Nicholas Tamborra
10/10/2024
Special inspection requirement — HVAC-R and service water heating system controls
Nicholas Tamborra
10/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tamborra
08/08/2024
Special inspection requirement — Electric vehicle service equipment requirements
Nicholas Tamborra
08/02/2024
Special inspection requirement — Air barrier - visual inspection
Nicholas Tamborra
08/02/2024
Special inspection requirement — Air barrier — testing
Nicholas Tamborra
08/02/2024
Special inspection requirement — Permanent certificate
Nicholas Tamborra
08/02/2024
Special inspection requirement — Fenestration air leakage
Nicholas Tamborra
03/21/2023
Objection raised — Zoning
03/21/2023
Objection resolved — Addressed
03/21/2023
Objection raised — Zoning
03/21/2023
Objection resolved — Addressed
03/21/2023
Objection raised — Admin
03/21/2023
Objection resolved — Addressed
03/21/2023
Objection raised — Zoning
03/21/2023
Objection resolved — Addressed
03/10/2023
Filed — New Building
Install new 13' Curb Cut which includes 1'-6" splays both sides on the North Side of Driggs Street 159' East of the Corner of William Avenue and Driggs Street for this Associated New Building Application # S00681513-I1
S00681513-I1
02/01/2023
Violation issued (ECB, open)
Construction
01/09/2023
Permit issued — Construction Fence
S08026115-I1-FN
11/17/2022
Filed — Alteration
Construct Construction Fence on Property Line for New Building Application #S00681513 as per submitted plans
S08026115-I1
05/16/2022
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Nicholas Tamborra
05/16/2022
Special inspection requirement — Energy Code Compliance Inspections
Nicholas Tamborra
02/15/2022
Special inspection requirement — Protection of exposed foundation insulation
Nicholas Tamborra
02/15/2022
Special inspection requirement — Concrete - Cast-In-Place
Nicholas Tamborra
02/15/2022
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Nicholas Tamborra
02/15/2022
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Nicholas Tamborra
02/15/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicholas Tamborra
02/15/2022
Special inspection requirement — Subgrade Inspections
Nicholas Tamborra
02/15/2022
Special inspection requirement — Wood – Prefabricated I-Joists
Nicholas Tamborra
02/15/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Nicholas Tamborra
02/15/2022
Special inspection requirement — Final
anthony santoro
02/15/2022
Special inspection requirement — Footing and Foundation
Nicholas Tamborra
02/15/2022
Special inspection requirement — Insulation placement and R values
Nicholas Tamborra
02/15/2022
Special inspection requirement — Fenestration and door U-factor and product ratings
Nicholas Tamborra
02/15/2022
Special inspection requirement — Fenestration areas
Nicholas Tamborra
02/15/2022
Special inspection requirement — Lighting in dwelling units
Nicholas Tamborra
01/11/2022
Signed off — Alteration
APPLICATION FILED FOR TEMPORARY CONSTRUCTION FENCE FOR DEMOLITION OF EXISTING HOUSE AND GARAGE
S00584306-I1
01/10/2022
Inspection — Pass-Final Fence Non-Directive 14
Pass
View inspection ↗
Latest 60 of 71 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedWANKO WINDOWS INC09/29/2026
DOB NOWConstruction FencePermit IssuedWANKO WINDOWS INC09/28/2026
DOB NOWFoundationPermit IssuedPREMIER GROUP INC06/15/2026
DOB NOWConstruction FencePermit IssuedPREMIER GROUP INC04/14/2026
DOB NOWConstruction FencePermit IssuedPREMIER GROUP INC01/09/2023
DOB NOWConstruction FenceSigned-offALKA CONTRACTING INC10/18/2021
BIS—ISSUEDALKA CONTRACTING INC11/12/2021
1 project · most recent 08/19/2025
FiledStatusContractorScope
08/19/2025Permit IssuedWANKO WINDOWS INC1 scope_items
1 project · most recent 11/17/2022
Fence
FiledStatusContractorScope
11/17/2022Permit IssuedWANKO WINDOWS INCFence
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
01/10/2022Pass-Final Fence Non-Directive 14PassView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
02/08/2026MeteringNicholas Tamborraenergy_progress
01/12/2026Fire-Resistance Rated ConstructionNicholas Tamborraprogress
01/12/2026Interior lighting powerNicholas Tamborraenergy_progress
01/12/2026Maintenance informationNicholas Tamborraenergy_progress
08/19/2025Sprinkler SystemsNicholas Tamborraspecial
10/10/2024HVAC-R and service water piping design and insulationNicholas Tamborraenergy_progress
10/10/2024HVAC-R and service water heating equipmentNicholas Tamborraenergy_progress
10/10/2024HVAC-R and service water heating system controlsNicholas Tamborraenergy_progress
10/10/2024Fire-Resistant Penetrations and JointsNicholas Tamborraspecial
08/08/2024Electric vehicle service equipment requirementsNicholas Tamborraenergy_progress
08/02/2024Air barrier - visual inspectionNicholas Tamborraenergy_progress
08/02/2024Air barrier — testing Nicholas Tamborraenergy_progress
08/02/2024Permanent certificateNicholas Tamborraenergy_progress
08/02/2024Fenestration air leakageNicholas Tamborraenergy_progress
05/16/2022Wall Panels, Curtain Walls, and VeneersNicholas Tamborraspecial
05/16/2022Energy Code Compliance InspectionsNicholas Tamborraprogress
02/15/2022Protection of exposed foundation insulationNicholas Tamborraenergy_progress
02/15/2022Concrete - Cast-In-PlaceNicholas Tamborraspecial
02/15/2022Excavations - Sheeting, Shoring, and BracingNicholas Tamborraspecial
02/15/2022Exterior Insulation and Finish Systems (EIFS)Nicholas Tamborraspecial
02/15/2022Fire-Resistant Penetrations and JointsNicholas Tamborraspecial
02/15/2022Subgrade InspectionsNicholas Tamborraspecial
02/15/2022Wood – Prefabricated I-JoistsNicholas Tamborraspecial
02/15/2022Subsurface Investigations (Borings/Test Pits)Nicholas Tamborraspecial
02/15/2022Finalanthony santoroprogress
Latest 25 of 31.
▾Documents — 76 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch5
08/25/2026S00584306-I1Request digital key ↗
08/23/2026S08026115-I1Request digital key ↗
08/23/2026S00681513-S1Request digital key ↗
Showing 3 of 5 on file for this type
▸DOB NOWPlans/Sketch - Plumbing1
08/25/2026S00410014-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION2
07/29/2021520453820Open ↗
11/04/2019520394145Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation2
07/28/2025540265746Open ↗
07/28/2025540265746Open ↗
▸BISWORK PERMIT APPLICATION1
11/12/2021520453820Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00681513-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00681513-I1Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature11
09/20/2026S00681513-I1Open ↗
09/20/2026S00681513-I1Open ↗
09/20/2026S00681513-I1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/23/2026S08026115-I1Open ↗
08/23/2026S00681513-S1Open ↗
08/23/2026S00681513-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/20/2026S00681513-I1Open ↗
09/20/2026S00681513-I1Open ↗
09/20/2026S00681513-I1Open ↗
Showing 3 of 5 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
12/20/2024540265746Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
12/20/2024540265746Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
11/04/2019520394145Open ↗
▸Trade Schedules & Equipment5
▸BISWATER CUT-OFF1
11/12/2021520453820Open ↗
▸BISGAS CUT-OFF1
11/12/2021520453820Open ↗
▸BISSEWER CONNECTION: DEP SD1 & SD21
11/12/2021520453820Open ↗
▸BISELECTRIC CUT-OFF1
11/12/2021520453820Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/23/2026S00681513-I1Open ↗
▸Safety & Tenant Protection5
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
11/12/2021520453820Open ↗
11/12/2021520453820Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
07/29/2021520453820Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/23/2026S00681513-I1Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026S00681513-I1Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
07/29/2021520453820Open ↗
11/04/2019520394145Open ↗
▸BISRODENT CONTROL1
11/12/2021520453820Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026S00410014-I1Open ↗
▸Energy Compliance1
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
11/04/2019520394145Open ↗
▸Inspections & Test Reports4
▸BISBPP-9 - Request for Builders Pavement Field Inspection2
07/28/2025540265746Open ↗
12/20/2024540265746Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00681513-I1Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026S00681513-I1Open ↗
▸Approvals, Objections & Sign-offs6
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff2
07/28/2025540265746Open ↗
07/28/2025540265746Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
07/29/2021520453820Open ↗
11/04/2019520394145Open ↗
▸BISHOUSE CONNECTION SIGNOFF1
11/12/2021520453820Open ↗
▸BISLANDMARKS SIGNOFF1
11/12/2021520453820Open ↗
▸Cost, Insurance & Ownership2
▸BISPROJECT-SPECIFIC GL INSURANCE1
11/12/2021520453820Open ↗
▸BISCOST AFFIDAVIT1
11/04/2019520394145Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
07/29/2021520453820Open ↗
11/04/2019520394145Open ↗
▸BISBOROUGH INTAKE FORM2
11/12/2021520453820Open ↗
07/29/2021520453820Open ↗
▸Other Documents7
▸BISLAA - Supporting Documentation3
11/12/2021520453820Open ↗
11/12/2021520453820Open ↗
11/12/2021520453820Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
07/28/2025540265746Open ↗
07/28/2025540265746Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00681513-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/23/2026S00681513-I1Open ↗