← Back
Large suburban residence
151 NICOLOSI DRIVE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5128238
💬 Discuss this project
1997Year Built
2Stories
A3Building Class
R3-2Zoning
8,380 sfGross Floor Area
1Units
5 Open Violations ▸FDNY Report ↗
Large suburban residence · Owner of record: NY SPECIALITY INFUSION SERVICES, LLC · 21,065 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 13p · 1 filing · 20 docs
Site & exterior2p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEVEN R. SAVINO ARCHITECT PC501/09/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHMOND PLBG & HEATINGPlumbing307/08/2026
Building Lifecycle
All (45)Filed (5)Permit Issued (3)Signed Off (3)Violation (9)Inspection (5)Special Inspection (20)
05/18/2023
Signed off — Alteration
CAP AND REMOVE 2-FURNACE & 2-HOT WATER HEATERS ON THE FIRST FLOOR, , INSTALL 2-POOL HEATERS IN THE OSP, INSTALL 4-BOILERS, 1- STOVE AND 1-FIREPLACE ON THE FIRST FLOOR
S00533232-S2
05/18/2023
Signed off — Alteration
CAP AND REMOVE 2-FURNACE & 2-HOT WATER HEATERS ON THE FIRST FLOOR, , INSTALL 2-POOL HEATERS IN THE OSP, INSTALL 4-BOILERS, 1- STOVE AND 1-FIREPLACE ON THE FIRST FLOOR
S00533232-S1
05/18/2023
Signed off — Alteration
CAP AND REMOVE 2-FURNACE & 2-HOT WATER HEATERS ON THE FIRST FLOOR, , INSTALL 2-POOL HEATERS IN THE OSP, INSTALL 4-BOILERS, 1- STOVE AND 1-FIREPLACE ON THE FIRST FLOOR
S00533232-I1
01/19/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/17/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
01/10/2023
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
01/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
01/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
01/09/2023
Filed — Alteration
CAP AND REMOVE 2-FURNACE & 2-HOT WATER HEATERS ON THE FIRST FLOOR, , INSTALL 2-POOL HEATERS IN THE OSP, INSTALL 4-BOILERS, 1- STOVE AND 1-FIREPLACE ON THE FIRST FLOOR
S00533232-P2
11/02/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
11/02/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
11/02/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
11/02/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
10/26/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/25/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/18/2022
Permit issued — Plumbing
S00533232-S2-PL
10/13/2022
Filed — Alteration
CAP AND REMOVE 2-FURNACE & 2-HOT WATER HEATERS ON THE FIRST FLOOR, , INSTALL 2-POOL HEATERS IN THE OSP, INSTALL 4-BOILERS, 1- STOVE AND 1-FIREPLACE ON THE FIRST FLOOR
S00533232-P1
10/13/2022
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
10/13/2022
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
10/13/2022
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
10/13/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
10/06/2022
Filed — Alteration
CAP AND REMOVE 2-FURNACE & 2-HOT WATER HEATERS ON THE FIRST FLOOR, , INSTALL 2-POOL HEATERS IN THE OSP, INSTALL 4-BOILERS, 1- STOVE AND 1-FIREPLACE ON THE FIRST FLOOR
S00533232-S2
08/30/2022
Permit issued — Plumbing
S00533232-S1-PL
12/27/2021
Filed — Alteration
CAP AND REMOVE 2-FURNACE & 2-HOT WATER HEATERS ON THE FIRST FLOOR, , INSTALL 2-POOL HEATERS IN THE OSP, INSTALL 4-BOILERS, 1- STOVE AND 1-FIREPLACE ON THE FIRST FLOOR
S00533232-S1
12/26/2021
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
12/26/2021
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
12/26/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
12/26/2021
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
11/12/2021
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
09/25/2021
Permit issued — Plumbing
S00533232-I1-PL
07/08/2021
Filed — Alteration
CAP AND REMOVE 2-FURNACE & 2-HOT WATER HEATERS ON THE FIRST FLOOR, , INSTALL 2-POOL HEATERS IN THE OSP, INSTALL 4-BOILERS, 1- STOVE AND 1-FIREPLACE ON THE FIRST FLOOR
S00533232-I1
06/09/2021
Special inspection requirement — Energy Code Compliance Inspections
Steven Savino
06/09/2021
Special inspection requirement — HVAC-R and service water heating equipment
Steven Savino
06/09/2021
Special inspection requirement — HVAC-R and service water heating system controls
Steven Savino
06/09/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
Steven Savino
05/20/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/05/2019
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/15/2017
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
12/01/2016
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
06/10/2015
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/01/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/13/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/12/2010
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/20/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRICHMOND PLBG & HEATING10/18/2022
DOB NOWPlumbingSigned-offRICHMOND PLBG & HEATING08/30/2022
DOB NOWPlumbingSigned-offRICHMOND PLBG & HEATING09/25/2021
BISPLISSUEDCAPITAL CONTR P&H CORP11/14/1997
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/17/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/26/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/25/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/12/2021Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
01/10/2023HVAC-R and service water heating system controlsSteven Savinoenergy_progress
01/10/2023Energy Code Compliance InspectionsSteven Savinoprogress
01/10/2023HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
01/10/2023HVAC-R and service water heating equipmentSteven Savinoenergy_progress
11/02/2022HVAC-R and service water heating equipmentSteven Savinoenergy_progress
11/02/2022HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
11/02/2022HVAC-R and service water heating system controlsSteven Savinoenergy_progress
11/02/2022Energy Code Compliance InspectionsSteven Savinoprogress
10/13/2022Energy Code Compliance InspectionsSteven Savinoprogress
10/13/2022HVAC-R and service water heating system controlsSteven Savinoenergy_progress
10/13/2022HVAC-R and service water heating equipmentSteven Savinoenergy_progress
10/13/2022HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
12/26/2021Energy Code Compliance InspectionsSteven Savinoprogress
12/26/2021HVAC-R and service water heating system controlsSteven Savinoenergy_progress
12/26/2021HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
12/26/2021HVAC-R and service water heating equipmentSteven Savinoenergy_progress
06/09/2021Energy Code Compliance InspectionsSteven Savinoprogress
06/09/2021HVAC-R and service water heating equipmentSteven Savinoenergy_progress
06/09/2021HVAC-R and service water heating system controlsSteven Savinoenergy_progress
06/09/2021HVAC-R and service water piping design and insulationSteven Savinoenergy_progress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00533232-S2Request digital key ↗
08/23/2026S00533232-S1Request digital key ↗
08/23/2026S00533232-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications15
▸DOB NOWProgress Inspector Seal & Signature10
08/28/2026S00533232-S1Open ↗
08/28/2026S00533232-S1Open ↗
08/27/2026S00533232-S2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00533232-I1Open ↗
08/23/2026S00533232-S2Open ↗
08/23/2026S00533232-P1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026S00533232-I1Open ↗
08/13/2026S00533232-S1Open ↗