0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneralOther
Roof1 filing
Floor 61 filing
Floor 5
Floor 4
Floor 3
Floor 2
Floor 11 filing
Site & exterior4 filings
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNERS REP1407/08/2026
ONE FIVE FIVE LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES1203/21/2026
AE DESIGN SOLUTION1603/21/2026
EXPEDITING 4 U603/21/2026
ZV Drafting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TCHORS LLCGeneral Contractor1307/08/2026
CORE SCAFFOLD SYSTEMS INC.General Contractor507/08/2026
KAO HWA LEE ARCHITECTSGeneral Contractor403/22/2026
PRIME PIPING & HEATING INFire Protection307/08/2026
DENALI ELECTRIC CORP 004505General Contractor203/22/2026
PRIME PIPING & HEATING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
REGIONAL TESTING CORP.3941603/05/2026
Building Lifecycle
All (167)Filed (27)Permit Issued (19)Signed Off (16)Violation (12)Inspection (22)Objection (38)Special Inspection (30)Tax Incentive (3)
07/08/2026
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00965124-I1
03/26/2026
Objection raised — Other
03/16/2026
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00965124-S3
03/12/2026
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00965124-S2
03/05/2026
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00965124-A2
03/04/2026
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
03/04/2026
Special inspection requirement — Fenestration air leakage
Paul Raymond
03/04/2026
Special inspection requirement — Lighting in dwelling units
Paul Raymond
03/04/2026
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
03/04/2026
Special inspection requirement — Insulation placement and R values
Paul Raymond
03/04/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
03/04/2026
Special inspection requirement — Fenestration areas
Paul Raymond
03/04/2026
Special inspection requirement — Interior lighting power
Paul Raymond
03/04/2026
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
03/04/2026
Special inspection requirement — Lighting controls
Paul Raymond
03/04/2026
Special inspection requirement — Exterior lighting power
Paul Raymond
03/04/2026
Special inspection requirement — Vestibules
Paul Raymond
03/04/2026
Special inspection requirement — Electrical motors and elevators
Paul Raymond
03/04/2026
Special inspection requirement — Metering
Paul Raymond
03/04/2026
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Paul Raymond
03/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
03/04/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
03/04/2026
Special inspection requirement — Maintenance information
Paul Raymond
03/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
03/04/2026
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
12/31/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00965124-A4
12/09/2025
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00965124-S6
12/04/2025
Violation issued (ECB, closed)
Construction
07/31/2025
Inspection — No Access-Final PL - Up to 3 Requested Floors
No Access
View inspection ↗
07/25/2025
Objection raised — Other
07/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/18/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/30/2025
Filed — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00965124-P9
06/06/2025
Special inspection requirement — Fenestration air leakage
Paul Raymond
06/06/2025
Special inspection requirement — Fenestration areas
Paul Raymond
06/06/2025
Special inspection requirement — Metering
Paul Raymond
06/06/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
06/06/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
06/06/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
06/06/2025
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
06/06/2025
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Paul Raymond
06/06/2025
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
Paul Raymond
06/06/2025
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
04/21/2025
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00965124-S4
04/03/2025
Signed off — Alteration
PROPOSED CONSTRUCTION FENCE
B00971204-I1
03/28/2025
Permit issued — Mechanical Systems
B00965124-S4-MS
03/17/2025
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00965124-S5
03/10/2025
Signed off — New Building
SUBSEQUENT PLUMBING APPLICATION FILED HEREWITH.
B00965124-S7
03/06/2025
Objection resolved — Addressed
03/05/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/04/2025
Objection raised — Fire_Protection
02/27/2025
Signed off — Alteration
CURB CUT APPLICATION FILED IN CONJUNCTION WITH NEW BUILDING JOB #B00965124.
B01081170-I1
02/27/2025
Inspection — Certified StandPipe-Fire Pump (SD)-Fire Pump Test
Certified
View inspection ↗
02/26/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
02/21/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
02/21/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/21/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
02/19/2025
Permit issued — General Construction
B00965124-I1-GC
Latest 60 of 167 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offTCHORS LLC03/28/2025
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC02/19/2025
DOB NOWCurb CutSigned-offTCHORS LLC02/03/2025
DOB NOWFoundationSigned-offTCHORS LLC12/24/2024
DOB NOWPlumbingSigned-offPRIME PIPING & HEATING IN08/15/2024
DOB NOWGeneral ConstructionPermit IssuedTCHORS LLC08/12/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC08/09/2024
DOB NOWFoundationSigned-offTCHORS LLC07/15/2024
DOB NOWStructuralSigned-offTCHORS LLC07/12/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC06/11/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC05/29/2024
DOB NOWSupport of ExcavationSigned-offTCHORS LLC05/28/2024
DOB NOWProtection and Mechanical MethodsSigned-offCORE SCAFFOLD SYSTEMS INC05/17/2024
DOB NOWSupported ScaffoldSigned-offCORE SCAFFOLD SYSTEMS INC05/16/2024
DOB NOWStandpipeSigned-offA M B MECHANICAL INC05/15/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC05/13/2024
DOB NOWSidewalk ShedSigned-offCORE SCAFFOLD SYSTEMS INC05/10/2024
DOB NOWSupport of ExcavationSigned-offTCHORS LLC04/03/2024
DOB NOWConstruction FenceSigned-offTCHORS LLC04/01/2024
BIS—ISSUEDOLIWA CONSTRUCTION INC06/22/2016
BISEQISSUEDOLIWA CONSTRUCTION INC06/17/2016
1 project · most recent 03/05/2026
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
03/05/2026Signed-offTCHORS LLCAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin MXZ-SM36NAM 47,000 BTU · Condensing Unit ×57
MXZ-SM48NAM 48,000 BTU · Vrf Outdoor ×34
PUZ-A18NKA7 15,000 BTU · Condensing Unit ×6
-- 57,500 BTU · Condensing Unit ×4
Heating
Daikin MXZ-SM36NAM 48,500 BTU · Condensing Unit ×40
MXZ-SM48NAM 54,000 BTU · Vrf Outdoor ×34
PUZ-A24NHA7- 24,000 BTU · Condensing Unit ×17
-- 57,000 BTU · Condensing Unit ×10
Ventilation
Greenheck CUE-100HP-VG 625 CFM · Kitchen Exhaust ×8
CUE-080-VG 225 CFM · Kitchen Exhaust ×6
AX-54-190-0620 8,000 CFM · Exhaust Fan ×2
CUE-100HP 350 CFM · Exhaust Fan ×1
G-240-VG 6,000 CFM · Exhaust Fan ×1
Nutone -- 100 CFM · Exhaust Fan ×3
Panasonic FV-10NLF1 100 CFM · Exhaust Fan ×1
1 project · most recent 03/05/2026
Sprinkler System
FiledStatusContractorScope
03/05/2026Signed-offPRIME PIPING & HEATING INSprinkler System
1 project · most recent 03/05/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
03/05/2026Signed-offPRIME PIPING & HEATING INGas, Storm, Water/Sanitary
4 projects · most recent 09/06/2024
FiledStatusContractorScope
09/06/2024CompleteDENALI ELECTRIC CORP—
08/05/2024CompleteSOLAS ELECTRICAL CORP—
05/22/2024CompleteSOLAS ELECTRICAL CORP—
01/28/2024CompleteHIVOLTS ELECTRICAL INC1 meters, 1 new_meters
1 project · most recent 03/05/2026
Concrete Masonry
FiledStatusContractorScope
03/05/2026Signed-offTCHORS LLCConcrete, Masonry
1 project · most recent 03/05/2026
Support of Excavation
FiledStatusContractorScope
03/05/2026Signed-offTCHORS LLCSupport of Excavation
▾Field Inspections (DOB CAP) — 22
DateTypeResultReport
07/31/2025No Access-Final PL - Up to 3 Requested FloorsNo AccessView ↗
07/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
07/18/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/05/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
02/27/2025Certified StandPipe-Fire Pump (SD)-Fire Pump TestCertifiedView ↗
02/26/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
02/21/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
02/21/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/21/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
02/19/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/19/2025Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
02/18/2025Pass-Final CND-Occupancy InspectionPassView ↗
12/09/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (100 Foot Increments)CertifiedView ↗
11/01/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/09/2024Pass-Final PL - More than 10 Requested FloorsPassView ↗
10/07/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
09/26/2024Certified StandPipe - SD - Alarm Sys 64/09 - FinishCertifiedView ↗
09/26/2024Certified StandPipe - SD - Hydrostatic 63/09 Test (Initial 75 Feet)CertifiedView ↗
08/23/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/23/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
03/04/2026Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
03/04/2026Lighting in dwelling unitsPaul Raymondenergy_progress
03/04/2026Interior lighting powerPaul Raymondenergy_progress
03/04/2026Maintenance informationPaul Raymondenergy_progress
03/04/2026Exterior lighting powerPaul Raymondenergy_progress
03/04/2026Air barrier - visual inspectionPaul Raymondenergy_progress
03/04/2026Air barrier continuity plan testingPaul Raymondenergy_progress
03/04/2026VestibulesPaul Raymondenergy_progress
03/04/2026Electrical motors and elevatorsPaul Raymondenergy_progress
03/04/2026Insulation placement and R valuesPaul Raymondenergy_progress
03/04/2026MeteringPaul Raymondenergy_progress
03/04/2026Fenestration areasPaul Raymondenergy_progress
03/04/2026Protection of exposed foundation insulationPaul Raymondenergy_progress
03/04/2026Fenestration air leakagePaul Raymondenergy_progress
03/04/2026Fire-Resistance Rated ConstructionPaul Raymondprogress
03/04/2026Energy Code Compliance InspectionsPaul Raymondprogress
03/04/2026Fire-Resistant Penetrations and JointsPaul Raymondspecial
03/04/2026Exterior Insulation and Finish Systems (EIFS)Paul Raymondspecial
03/04/2026Alternative Materials - OTCR Buildings Bulletin NumberPaul Raymondspecial
03/04/2026Lighting controlsPaul Raymondenergy_progress
06/06/2025Lighting in dwelling unitsPaul Raymondenergy_progress
06/06/2025Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
06/06/2025Maintenance informationPaul Raymondenergy_progress
06/06/2025Interior lighting powerPaul Raymondenergy_progress
06/06/2025Air barrier - visual inspectionPaul Raymondenergy_progress
Latest 25 of 150.
▾Documents — 330 on file (BIS + DOB NOW)
▸Plans & Drawings26
▸DOB NOWPlans/Sketch26
08/26/2026B00971204-I1Request digital key ↗
08/25/2026B01045767-I1Request digital key ↗
08/25/2026B01045767-P1Request digital key ↗
Showing 3 of 26 on file for this type
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION7
12/18/2024340914121Open ↗
05/06/2016321164342Open ↗
01/13/2016340343694Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
06/22/2016321164342Open ↗
06/17/2016321164342Open ↗
06/17/2016321164342Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHPD - Permit Notice5
08/23/2026B00965124-I1Open ↗
Showing 1 of 5 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation2
01/14/2025340914121Open ↗
12/18/2024340914121Open ↗
▸Zoning, Tax Lot & Property Records22
▸DOB NOWRestrictive Declaration/Easement 112
08/23/2026B00965124-S3Open ↗
Showing 1 of 12 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/23/2026B00965124-A2Open ↗
08/23/2026B00965124-I1Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications191
▸DOB NOWProgress Inspector Seal & Signature92
08/22/2026B00965124-I1Open ↗
08/22/2026B00965124-I1Open ↗
08/22/2026B00965124-I1Open ↗
Showing 3 of 92 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature66
08/22/2026B00965124-S6Open ↗
08/22/2026B00965124-I1Open ↗
08/22/2026B00965124-P5Open ↗
Showing 3 of 66 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature26
08/25/2026B01045767-I1Open ↗
08/25/2026B01048678-I1Open ↗
08/25/2026B01051190-I1Open ↗
Showing 3 of 26 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/18/2024340914121Open ↗
01/13/2016340343694Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
08/22/2016321164342Open ↗
06/22/2016321164342Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
01/13/2016340343694Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
12/18/2024340914121Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
01/13/2016340343694Open ↗
▸Trade Schedules & Equipment8
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSEWER CUT-OFF1
06/22/2016321164342Open ↗
▸BISELECTRIC CUT-OFF1
06/22/2016321164342Open ↗
▸BISGAS CUT-OFF1
06/22/2016321164342Open ↗
▸DOB NOWStandpipe Alarms Drawings1
08/23/2026B00965124-I1—
▸Safety & Tenant Protection13
▸DOB NOWStreet Tree Checklist4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
01/14/2025340914121Open ↗
▸BISBPP: STREET TREES SITE PLAN1
01/14/2025340914121Open ↗
▸BISSTREET TREE CHECKLIST1
12/18/2024340914121Open ↗
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE1
06/22/2016321164342Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
06/22/2016321164342Open ↗
▸BISSRO MD ANTI-HARASSMENT CHECKLIST1
06/22/2016321164342Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWStreet Tree Sign Off1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/22/2016321164342Open ↗
▸BISRODENT CONTROL1
06/22/2016321164342Open ↗
▸Energy Compliance1
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
01/13/2016340343694Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram3
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 3 on file for this type
▸Approvals, Objections & Sign-offs5
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/27/2016321164342Open ↗
06/27/2016321164342Open ↗
▸BISTAP LETTER - DOM SVC : DEP-DOM1
06/22/2016321164342Open ↗
▸BISLANDMARKS APPROVAL1
06/22/2016321164342Open ↗
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
05/15/2025340914121Open ↗
▸Cost, Insurance & Ownership3
▸BISAcord 25 (Acord Certificate of Liability Insurance)2
06/22/2016321164342Open ↗
06/22/2016321164342Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
06/22/2016321164342Open ↗
▸Filing & Intake Forms8
▸BISADDITIONAL INFORMATION3
01/14/2025340914121Open ↗
01/14/2025340914121Open ↗
02/24/2017321164342Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/18/2024340914121Open ↗
01/13/2016340343694Open ↗
▸BISEFILING COVER SHEET2
07/22/2015321164342Open ↗
07/22/2015321164342Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
12/18/2024340914121Open ↗
▸Other Documents25
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWSite Survey: Initial4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 4 on file for this type
▸DOB NOWHPD - Completion Notice4
08/23/2026B00965124-I1Open ↗
Showing 1 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
01/14/2025340914121Open ↗
01/14/2025340914121Open ↗
▸DOB NOWAdjoining Owners Notification2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸DOB NOWFinal Survey2
08/23/2026B00965124-I1Open ↗
Showing 1 of 2 on file for this type
▸BISCOMMUNITY BOARD NOTIFICATION1
06/22/2016321164342Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
06/22/2016321164342Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type