Five to six families
151 STATE STREET
BROOKLYN · BIN 3002665
💬 Discuss this project
1879Year Built
4Stories
C2Building Class
R6Zoning
4,100 sfGross Floor Area
5Units
Rent Stabilized3 Open Violations ▸
Five to six families · Owner of record: 151 STATE LLC · 2,168 sf lot · 1.89 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Roof112p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 10 docs
Floor 4108p · 2 filings · 20 docs
Floor 3102p · 1 filing · 20 docs
Floor 2108p · 2 filings · 20 docs
Floor 1100p · 1 filing · 20 docs
Cellar116p · 1 filing · 20 docs
Basement104p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
151 STATE LLC103/22/2026
TCS CONSTRUC DEVELOP303/22/2026
BROOKLYN103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/12/2024$4.9M—— → —$1,195/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
OPERA STUDIO ARCHITECTURE, LLC605/19/2026
MCHENERY TESTING LAB103/19/2026
THOMAS BARRY ARCHITECT503/17/2026
MJE PROFESSIONAL SERVICES108/12/2025
ALPHA ENGINEERING703/21/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
OPERA STUDIO ARCHITECTURE LLC1203/21/2026
BMG GROUP USA603/21/2026
SNR EXPEDITING DESIGN203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TCS CONSTRUCTION CORPGeneral Contractor1507/08/2026
TCS CONSTRUC DEVELOP LLCGeneral Contractor707/08/2026
EMPIRE CITY CONSTRUCTIONGeneral Contractor504/09/2026
RITE WAY HEATING CORPPlumbing207/08/2026
FRIED ELECTRIC CO.Electrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP56161205/19/2026
OPERA STUDIO ARCHITECTURE59701005/19/2026
Building Lifecycle
All (158)Filed (20)Permit Issued (17)Signed Off (10)Violation (17)Inspection (6)Objection (58)Special Inspection (30)
07/06/2026
Signed off — Alteration CO
Structural work in conjunction with renovation of four family dwelling
B01072216-I1
06/08/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
06/08/2026
Special inspection requirement — Exterior lighting power
Thomas Barry
06/08/2026
Special inspection requirement — Air barrier - visual inspection
Thomas Barry
06/08/2026
Special inspection requirement — Fire-Resistance Rated Construction
Thomas Barry
06/08/2026
Special inspection requirement — Lighting in dwelling units
Thomas Barry
06/08/2026
Special inspection requirement — Metering
Thomas Barry
06/08/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Thomas Barry
06/08/2026
Special inspection requirement — Lighting controls
Thomas Barry
06/08/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
06/08/2026
Special inspection requirement — Fenestration areas
Thomas Barry
06/08/2026
Special inspection requirement — Insulation placement and R values
Thomas Barry
06/08/2026
Special inspection requirement — Interior lighting power
Thomas Barry
06/08/2026
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
06/08/2026
Special inspection requirement — Fenestration air leakage
Thomas Barry
06/08/2026
Special inspection requirement — Maintenance information
Thomas Barry
05/28/2026
Signed off — Alteration CO
Structural work in conjunction with renovation of four family dwelling
B01072216-S4
05/26/2026
Signed off — Alteration CO
Structural work in conjunction with renovation of four family dwelling
B01072216-S7
05/26/2026
Signed off — Alteration
Structural joist work in conjunction with alteration application
B01098532-S1
05/19/2026
Filed — Alteration CO
Structural work in conjunction with renovation of four family dwelling
B01072216-A1
05/18/2026
Special inspection requirement — Insulation placement and R values
Thomas Barry
05/18/2026
Special inspection requirement — Fenestration air leakage
Thomas Barry
05/18/2026
Special inspection requirement — Metering
Thomas Barry
05/18/2026
Special inspection requirement — Lighting in dwelling units
Thomas Barry
05/18/2026
Special inspection requirement — Interior lighting power
Thomas Barry
05/18/2026
Special inspection requirement — Air barrier - visual inspection
Thomas Barry
05/18/2026
Special inspection requirement — Energy Code Compliance Inspections
Thomas Barry
05/18/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
05/18/2026
Special inspection requirement — Fire-Resistance Rated Construction
Thomas Barry
05/18/2026
Special inspection requirement — Fenestration areas
Thomas Barry
05/18/2026
Special inspection requirement — Maintenance information
Thomas Barry
05/18/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Thomas Barry
05/18/2026
Special inspection requirement — Lighting controls
Thomas Barry
05/18/2026
Special inspection requirement — Exterior lighting power
Thomas Barry
05/18/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Thomas Barry
05/08/2026
Signed off — Alteration CO
Structural work in conjunction with renovation of four family dwelling
B01072216-S3
05/06/2026
Violation issued (HPD, open)
A
05/04/2026
Signed off — Alteration CO
Structural work in conjunction with renovation of four family dwelling
B01072216-S2
05/04/2026
Signed off — Alteration CO
Structural work in conjunction with renovation of four family dwelling
B01072216-S5
05/01/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/30/2026
Permit issued — Plumbing
B01072216-S4-PL
04/30/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/22/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
04/13/2026
Signed off — Alteration
B01269802-I1
04/13/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01374851-I1
03/20/2026
Permit issued — Supported Scaffold
B01374851-I1-SF
03/19/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01374851-I1
03/17/2026
Filed — Alteration CO
Structural work in conjunction with renovation of four family dwelling
B01072216-P9
01/20/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/02/2025
Permit issued — General Construction
B01072216-I1-GC
11/20/2025
Signed off — Alteration
Install new Rear Yard construction fence
B01180182-I1
11/18/2025
Violation issued (HPD, open)
I
09/11/2025
Permit issued — Sidewalk Shed
B01269802-I1-SH
08/12/2025
Filed — Alteration
B01269802-I1
08/12/2025
Permit issued — Sidewalk Shed
B01269802-I1-SH
06/28/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/11/2025
Violation issued (HPD, open)
A
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
06/04/2025
Objection resolved — Addressed
Latest 60 of 158 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offRITE WAY HEATING CORP04/30/2026
DOB NOWSupported ScaffoldSigned-offEMPIRE CITY CONSTRUCTION03/20/2026
DOB NOWGeneral ConstructionPermit IssuedTCS CONSTRUC DEVELOP LLC12/02/2025
DOB NOWSidewalk ShedPermit IssuedEMPIRE CITY CONSTRUCTION09/11/2025
DOB NOWSidewalk ShedSigned-offEMPIRE CITY CONSTRUCTION08/12/2025
DOB NOWStructuralSigned-offTCS CONSTRUCTION CORP04/11/2025
DOB NOWSupport of ExcavationSigned-offTCS CONSTRUCTION CORP04/11/2025
DOB NOWFoundationSigned-offTCS CONSTRUCTION CORP04/11/2025
DOB NOWGeneral ConstructionPermit IssuedTCS CONSTRUC DEVELOP LLC04/07/2025
DOB NOWConstruction FenceSigned-offTCS CONSTRUCTION CORP02/18/2025
DOB NOWFoundationSigned-offTCS CONSTRUCTION CORP02/14/2025
DOB NOWSupport of ExcavationSigned-offTCS CONSTRUCTION CORP02/05/2025
DOB NOWGeneral ConstructionPermit IssuedTCS CONSTRUC DEVELOP LLC01/31/2025
DOB NOWMechanical SystemsSigned-offTCS CONSTRUCTION CORP01/29/2025
DOB NOWStructuralSigned-offTCS CONSTRUCTION CORP01/29/2025
DOB NOWPlumbingSigned-offLS PLUMBING CORP01/06/2025
DOB NOWStructuralSigned-offTCS CONSTRUCTION CORP12/30/2024
BISPLISSUEDCATMAN PLUMBING INC04/28/2016
BISMHISSUEDJEFFREY MCMAHON DESIGN &04/19/2016
BISOTISSUEDJEFFREY MCMAHON DESIGN &04/13/2016
BISOTISSUEDJEFFREY MCMAHON DESIGN &03/30/2016
1 project · most recent 05/19/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
05/19/2026Permit IssuedTCS CONSTRUC DEVELOP LLCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM36NAM2-U1 36,000 BTU · Condensing Unit ×4
MXZ-SM48NAM2-U1 48,000 BTU · Condensing Unit ×1
Mitsubishi 24,000 BTU · Fan Coil Indoor ×7
MITSUBISHI MXZ-SM36NAM2-U1 36,000 BTU · Condensing Unit ×3
Serial Number 18,000 BTU · Fan Coil Indoor ×3
MITSUBISHI - MXZ-SM36NAM2-U1 48,000 BTU · Vrf Outdoor ×1
MITSUBISHI- MXZ-SM36NAMH2-U1 36,000 BTU · Condensing Unit ×1
Ventilation
Renewaire HE10RT 500 CFM · Erv ×1
Greenheck ERV-10-20L-VG 500 CFM · Erv ×1
1 project · most recent 05/19/2026
Storm Water/Sanitary
FiledStatusContractorScope
05/19/2026Signed-offRITE WAY HEATING CORPStorm, Water/Sanitary
2 projects · most recent 11/21/2025
General Wiring
FiledStatusContractorScope
11/21/2025CompleteFRIED ELECTRIC CO.General Wiring
08/12/2025CompleteRICHARD NEU—
2 projects · most recent 05/19/2026
Steel Wood
FiledStatusContractorScope
05/19/2026Signed-offRITE WAY HEATING CORPSteel, Wood
12/04/2024Signed-offTCS CONSTRUCTION CORPSteel, Wood
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
05/01/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/30/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/22/2026Pass-Final CND-Occupancy InspectionPassView ↗
01/20/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
06/28/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/21/2025Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 110
DateRequirementInspectorRole
06/08/2026Fenestration air leakageThomas Barryenergy_progress
06/08/2026Air barrier - visual inspectionThomas Barryenergy_progress
06/08/2026Insulation placement and R valuesThomas Barryenergy_progress
06/08/2026Interior lighting powerThomas Barryenergy_progress
06/08/2026Fenestration areasThomas Barryenergy_progress
06/08/2026Fenestration and door U-factor and product ratingsThomas Barryenergy_progress
06/08/2026Lighting in dwelling unitsThomas Barryenergy_progress
06/08/2026Exterior lighting powerThomas Barryenergy_progress
06/08/2026Lighting controlsThomas Barryenergy_progress
06/08/2026MeteringThomas Barryenergy_progress
06/08/2026Maintenance informationThomas Barryenergy_progress
06/08/2026Energy Code Compliance InspectionsThomas Barryprogress
06/08/2026Fire-Resistance Rated ConstructionThomas Barryprogress
06/08/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
06/08/2026Fire-Resistant Penetrations and JointsThomas Barryspecial
05/18/2026Fenestration air leakageThomas Barryenergy_progress
05/18/2026Interior lighting powerThomas Barryenergy_progress
05/18/2026Lighting in dwelling unitsThomas Barryenergy_progress
05/18/2026Maintenance informationThomas Barryenergy_progress
05/18/2026Fenestration areasThomas Barryenergy_progress
05/18/2026Exterior lighting powerThomas Barryenergy_progress
05/18/2026Lighting controlsThomas Barryenergy_progress
05/18/2026Fire-Resistance Rated ConstructionThomas Barryprogress
05/18/2026Energy Code Compliance InspectionsThomas Barryprogress
05/18/2026Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 110.
▾Documents — 167 on file (BIS + DOB NOW)
▸Plans & Drawings20
▸DOB NOWPlans/Sketch20
08/23/2026B01098532-S1Request digital key ↗
08/23/2026B01098532-I1Request digital key ↗
08/22/2026B01180182-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸Applications & Permits22
▸DOB NOWLPC Approval/Permit17
08/17/2026B01072216-A1Open ↗
08/17/2026B01072216-P9Open ↗
08/13/2026B01072216-P5Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION4
04/29/2016321247548Open ↗
04/20/2016321247548Open ↗
04/14/2016321247548Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION1
01/21/2016321247548Open ↗
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram4
08/17/2026B01072216-A1Open ↗
08/13/2026B01072216-P7Open ↗
08/13/2026B01072216-P2Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications65
▸DOB NOWProgress Inspector Seal & Signature24
09/26/2026B01072216-P2Open ↗
09/26/2026B01072216-P2Open ↗
09/26/2026B01072216-P2Open ↗
Showing 3 of 24 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature20
08/23/2026B01098532-I1Open ↗
08/23/2026B01098532-S1Open ↗
08/21/2026B01269802-I1Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/26/2026B01072216-P2Open ↗
09/26/2026B01072216-P2Open ↗
09/02/2026B01072216-P1Open ↗
Showing 3 of 19 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
04/06/2016321247548Open ↗
01/21/2016321247548Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
01/21/2016321247548Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist4
08/17/2026B01072216-A1Open ↗
08/13/2026B01072216-P7Open ↗
08/13/2026B01072216-P2Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST1
01/21/2016321247548Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/23/2026B01098532-I1Open ↗
08/23/2026B01098532-S1Open ↗
08/17/2026B01072216-A1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
01/21/2016321247548Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/13/2026B01072216-S4Open ↗
▸Energy Compliance2
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
04/06/2016321247548Open ↗
01/21/2016321247548Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026B01072216-S7Open ↗
08/13/2026B01072216-P3Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026B01072216-S7Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
01/22/2016321247548Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
01/21/2016321247548Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
01/21/2016321247548Open ↗
▸Other Documents23
▸DOB NOWPlot Diagram8
08/17/2026B01072216-A1Open ↗
08/13/2026B01072216-P7Open ↗
08/13/2026B01072216-P4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSite Survey: Initial4
08/17/2026B01072216-A1Open ↗
08/13/2026B01072216-I1Open ↗
08/13/2026B01072216-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/17/2026B01072216-A1Open ↗
08/13/2026B01072216-I1Open ↗
08/13/2026B01072216-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProperty Ownership Certification4
08/17/2026B01072216-A1Open ↗
08/13/2026B01072216-I1Open ↗
08/13/2026B01072216-P7Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWFinal Survey1
08/17/2026B01072216-I1Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
08/13/2026B01072216-S5Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B01072216-S2Open ↗