← Back
Two stories - detached, small or mid-size
151 STEUBEN STREET
STATEN ISLAND · Rosebank-Shore Acres-Park Hill · BIN 5169282
💬 Discuss this project
2021Year Built
2Stories
A1Building Class
R3AZoning
2,059 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,350 sf lot · 0.61 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 21p · 1 filing · 2 docs
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NCB GROUP LLC703/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LOBUE & VALENZIANO, LLP104/19/2022
A TECH ENGINEERING NYC, PLLC.107/14/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A TECH ENGINEERING NYC203/21/2026
LO BUE VALENZIANO AIA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW YORK STANDARD MECHGeneral Contractor303/22/2026
CROWN PLUMBING INCPlumbing307/08/2026
YU HUA CONSTRUCTION CORPGeneral Contractor203/21/2026
EMANUEL LO BUEElectrical103/21/2026
Building Lifecycle
All (10)Filed (2)Permit Issued (2)Signed Off (2)Inspection (4)
08/14/2023
Signed off — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00529531-I1
04/19/2023
Signed off — Alteration
INSTALLATION OF 9' CURB CUT FOR 151 STEUBEN STREET.
S00689449-I1
12/22/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
08/18/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/17/2022
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/17/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/08/2022
Permit issued — Plumbing
S00529531-I1-PL
07/05/2022
Permit issued — Curb Cut
S00689449-I1-CC
04/19/2022
Filed — Alteration
INSTALLATION OF 9' CURB CUT FOR 151 STEUBEN STREET.
S00689449-I1
07/14/2021
Filed — Alteration
INSTALLATION OF NEW FIRE SPRINKLER SYSTEM WITH VALVES AND METER FOR SAME.
S00529531-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCROWN PLUMBING INC08/08/2022
DOB NOWCurb CutSigned-offYU HUA CONSTRUCTION CORP07/05/2022
BISPLISSUEDNEW YORK STANDARD MECH CORP07/27/2022
BIS—ISSUEDSTRUCTURELINE INC12/01/2021
BIS—ISSUEDSTRUCTURELINE INC09/23/2020
BIS—ISSUEDSTRUCTURELINE INC06/29/2020
BISPLISSUEDNEW YORK STANDARD MECH CORP06/18/2020
BIS—ISSUEDSTRUCTURELINE INC10/21/2019
1 project · most recent 02/07/2020
General Wiring
FiledStatusContractorScope
02/07/2020CompleteINTELOGIC ELECTRIC, INC.General Wiring
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
12/22/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
08/18/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/17/2022Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
08/17/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/25/2026S00529531-I1Request digital key ↗
08/24/2026S00689449-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
06/30/2023520339740Open ↗
06/21/2023520339740Open ↗
11/28/2018520339740Open ↗
▸BISWORK PERMIT APPLICATION3
07/29/2022520339740Open ↗
06/18/2020520339740Open ↗
08/15/2019520339740Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/30/2022520339740Open ↗
▸Zoning, Tax Lot & Property Records7
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
11/28/2018520339740Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
05/16/2023520339740Open ↗
▸BISRESTRICTION: RESTRICTIVE DECLARATION1
11/28/2018520339740Open ↗
▸BISVERIFY TAX LOT1
03/29/2023520339740Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/29/2023520339740Open ↗
▸BISZONING DIAGRAM1
01/09/2019520339740Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/28/2018520339740Open ↗
▸Seals & Professional Certifications8
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION4
08/15/2019520339740Open ↗
11/28/2018520339740Open ↗
11/28/2018520339740Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026S00529531-I1Open ↗
08/13/2026S00689449-I1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/28/2018520339740Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/28/2018520339740Open ↗
▸Trade Schedules & Equipment6
▸BISSEWER CONNECTION: DEP SD1 & SD21
11/28/2018520339740Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
08/28/2023520339740Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
08/28/2023520339740Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
11/28/2018520339740Open ↗
▸BISSPRINKLER (SP) SIGNOFF1
08/30/2023520339740Open ↗
▸BISSCHEDULE B - PLUMBING1
06/21/2023520339740Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREES SITE PLAN1
07/10/2023520339740Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
08/15/2019520339740Open ↗
▸BISSTREET TREE CHECKLIST1
11/28/2018520339740Open ↗
▸BISSTREET TREE SIGNOFF1
03/29/2023520339740Open ↗
▸Energy Compliance16
▸BISINSULATION PLACEMENT & R VALUES3
08/28/2023520339740Open ↗
08/28/2023520339740Open ↗
08/28/2023520339740Open ↗
▸BISFENESTRATION AIR LEAKAGE2
08/28/2023520339740Open ↗
08/28/2023520339740Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS2
08/15/2019520339740Open ↗
11/28/2018520339740Open ↗
▸BISFENESTRATION AREAS2
08/28/2023520339740Open ↗
08/28/2023520339740Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
08/28/2023520339740Open ↗
▸BISINTERIOR LIGHTING POWER1
08/28/2023520339740Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
08/28/2023520339740Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
08/28/2023520339740Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
08/28/2023520339740Open ↗
▸BIS* HVAC INSULATION AND SEALING1
08/28/2023520339740Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
08/28/2023520339740Open ↗
▸Inspections & Test Reports12
▸BISFIRE-RESISTIVE RATED CONSTRUCTION3
08/28/2023520339740Open ↗
08/28/2023520339740Open ↗
08/28/2023520339740Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
08/28/2023520339740Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
08/28/2023520339740Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
08/28/2023520339740Open ↗
▸BISBORINGS / TEST PITS (TR-4) 27-7201
11/28/2018520339740Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
08/28/2023520339740Open ↗
▸BISSOIL PERC. TEST-PVT ON-SITE STORM WATER DRAINAGE DISPOSAL SYS & DET. FACL.1
08/28/2023520339740Open ↗
▸BISSOIL PERCOLATE TEST-DRY WELL RS16-P1131
11/28/2018520339740Open ↗
▸BISFRAME (2008)/STRUCTURAL WOOD FRAME (2014) INSPECTION1
08/28/2023520339740Open ↗
▸BISDEMOLITION (DM) JOB SIGNOFF1
05/16/2023520339740Open ↗
▸Approvals, Objections & Sign-offs5
▸BISSCHEDULE A - OCCUPANCY / USE2
06/21/2023520339740Open ↗
11/28/2018520339740Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
11/28/2018520339740Open ↗
▸BISNYS DEC FRESHWATER WETLANDS APPROVAL1
01/10/2019520339740Open ↗
▸BISCURB CUT (CC) SIGNOFF1
05/16/2023520339740Open ↗
▸Filing & Intake Forms3
▸BISADDITIONAL INFORMATION1
06/30/2023520339740Open ↗
▸BISBOROUGH INTAKE FORM1
07/28/2022520339740Open ↗
▸BISEFILING COVER SHEET1
11/28/2018520339740Open ↗
▸Other Documents5
▸BISSHUTOFF DAMPERS1
08/28/2023520339740Open ↗
▸BISMAINTENANCE INFORMATION1
08/28/2023520339740Open ↗
▸BISPERMANENT CERTIFICATE1
08/28/2023520339740Open ↗
▸BISPLOT DIAGRAM1
11/28/2018520339740Open ↗
▸BISPVT ON-SITE STORM WATER DISPOSAL SYSTEMS & DETENTION FACL., INSTALLATION1
08/28/2023520339740Open ↗