Office with commercial, 7-19 stories
151 WEST 19 STREET
MANHATTAN · Chelsea-Hudson Yards · BIN 1014726
💬 Discuss this project
1912Year Built
12Stories
O6Building Class
C6-3AZoning
48,784 sfGross Floor Area
14Units
LL97 Covered0 Open ViolationsFISP: SAFE
Office with commercial, 7-19 stories · Owner of record: DEZER PROPERTIES 151 · 4,146 sf lot · 11.77 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Roof1p · 1 filing · 14 docs
Floor 106p · 1 filing · 8 docs
Floor 9
Floor 8
Floor 7
Floor 6
Floor 56p · 1 filing · 8 docs
Floor 4
Floor 36p · 1 filing · 8 docs
Floor 2
Floor 1
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DEZER PROPERTIES3507/08/2026
DEZER PROPERTIES 1511403/22/2026
OWNER OF 151 WEST 19 ST103/22/2026
DOZER PROPERTIES INC203/22/2026
DEZER PROPERTIES 133LP203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PCS ENGINEERING112/10/2024
DOUGLAS KOCHER, RA111/13/2024
ENTHINK ENGINEERS LLC209/09/2023
ROCK ARCH ENG CORP207/31/2023
KLEINMANN ARCHITECTS105/23/2022
ADG ARCHITECTURE AND DESIGN PC404/18/2022
DANIEL O'CONNOR ARCHITECTS111/19/2021
GREEN DESIGN105/06/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CONVERSANO ASSOCIATES, INC.803/21/2026
SEAY-YARBROUGH203/21/2026
RIGGING CONSULTANTS203/21/2026
CSR EXPEDITERS203/21/2026
CODE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor907/08/2026
B & A RESTORATION CONTRAGeneral Contractor407/08/2026
EVEREST SCAFFOLDING INCGeneral Contractor203/21/2026
CONSTRUCTION EXPERT INCGeneral Contractor203/21/2026
HOME IMPRO SERVS GRP INCGeneral Contractor107/08/2026
RUMIA CONTRACTING CORPGeneral Contractor107/08/2026
ABBRACCIAMENTO, JOHNElectrical103/21/2026
P.S.I. MECHANICALPlumbing107/08/2026
SCHONDORF MICHAELElectrical103/21/2026
THOMPSON, NElectrical103/21/2026
A & K CREATIVE CONSTRUCT*General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PCS ENGINEERING3745112/10/2024
ROCK ARCH ENG CORP1760207/31/2023
ROCK ARCH ENG CORP7831207/31/2023
DANIEL O'CONNOR ARCHITECT1730111/19/2021
ADG ACHITECTURE AND DESIG3044203/02/2021
Building Lifecycle
All (154)Filed (13)Permit Issued (15)Signed Off (8)Facade (FISP) (26)Violation (60)Objection (18)Special Inspection (14)
08/28/2025
Signed off — Alteration
M01136640-I1
07/09/2025
Cycle 10 facade report submitted
06/17/2025
Cycle 10 facade inspection completed
06/17/2025
Cycle 10 facade report signed — SAFE
04/14/2025
Signed off — Alteration
Facade repair including brick replacement, lintel replacement, terra cotta and decorative stone replacement and corner replacement as per plans filed. No change in use egress or occupancy.
M00622934-I1
02/12/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. LIVE LOAD 300 PSF
M00516627-I1
01/31/2025
Cycle 9 facade report signed — SAFE
01/28/2025
Signed off — Alteration
M01132302-I1
01/05/2025
Cycle 9 facade report submitted
01/05/2025
Cycle 9 facade inspection completed
12/31/2024
Cycle 9 facade report submitted
12/23/2024
Cycle 9 facade inspection completed
12/11/2024
Permit issued — Suspended Scaffold
M01136640-I1-SC
12/10/2024
Filed — Alteration
M01136640-I1
12/10/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
Michael Walsh
12/10/2024
Special inspection requirement — Post-installed Anchors
Michael Walsh
11/29/2024
Permit issued — General Construction
M01132302-I1-GC
11/13/2024
Filed — Alteration
M01132302-I1
08/27/2024
Permit issued — Sidewalk Shed
M00516627-I1-SH
03/26/2024
Permit issued — General Construction
M00622934-I1-GC
01/22/2024
Signed off — Alteration
M00842279-I1
12/29/2023
Cycle 9 facade report submitted
12/29/2023
Cycle 9 facade report signed — UNSAFE
12/11/2023
Cycle 9 facade inspection completed
09/09/2023
Filed — Alteration
M00842279-P1
09/01/2023
Permit issued — Sidewalk Shed
M00516627-I1-SH
07/31/2023
Filed — Alteration
Facade repair including brick replacement, lintel replacement, terra cotta and decorative stone replacement and corner replacement as per plans filed. No change in use egress or occupancy.
M00622934-P1
07/11/2023
Special inspection requirement — Final
Muhammad Muhaysin
07/11/2023
Special inspection requirement — Masonry
Muhammad Muhaysin
07/11/2023
Special inspection requirement — Post-installed Anchors
BRIAN O'CONNOR
07/11/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
Muhammad Muhaysin
04/07/2023
Permit issued — General Construction
M00622934-I1-GC
03/13/2023
Filed — Alteration
M00842279-I1
03/13/2023
Permit issued — Supported Scaffold
M00842279-I1-SF
01/09/2023
Violation issued (ECB, closed)
Construction
11/01/2022
Signed off — Alteration
M00717479-I1
09/09/2022
Permit issued — Sidewalk Shed
M00516627-I1-SH
08/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/21/2022
Permit issued — General Construction
M00622934-I1-GC
05/26/2022
Permit issued — General Construction
M00717479-I1-GC
05/23/2022
Filed — Alteration
M00717479-I1
05/04/2022
Filed — Alteration
Facade repair including brick replacement, lintel replacement, terra cotta and decorative stone replacement and corner replacement as per plans filed. No change in use egress or occupancy.
M00622934-I1
04/29/2022
Cycle 9 facade report signed — UNSAFE
04/28/2022
Cycle 9 facade report submitted
04/21/2022
Signed off — Alteration
Propose interior renovation at 003 floor. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under application.
M00649634-I1
04/19/2022
Cycle 9 facade inspection completed
04/18/2022
Filed — Alteration
Propose interior renovation at 003 floor. Removal and installation of non load bearing partitions and related finishes all as per plans herewith filed. No change in use, egress or occupancy filed under application.
M00649634-P1
04/18/2022
Special inspection requirement — Final
Christopher Carrano
04/12/2022
Special inspection requirement — Final
Joseph Kleinmann
04/07/2022
Special inspection requirement — Final
Christopher Carrano
02/25/2022
Signed off — Alteration
HEREBY FILING INTERIOR RENOVATION OF EXISTING OFFICE SPACE. WORK INCLUDES NEW NON LOAD BEARING PARTITIONS, MILLWORK & FINISHES. NO CHANGE TO USE EGRESS OR OCCUPANCY.
M00622853-I1
02/15/2022
Permit issued — General Construction
M00649634-I1-GC
02/01/2022
Objection raised — Fire_Protection
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Fire_Protection
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Inspections
02/01/2022
Objection resolved — Addressed
02/01/2022
Objection raised — Fire_Protection
02/01/2022
Objection resolved — Addressed
Latest 60 of 154 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSuspended ScaffoldPermit IssuedM & L SIGNS, INC12/11/2024
DOB NOWGeneral ConstructionSigned-offRUMIA CONTRACTING CORP11/29/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC08/27/2024
DOB NOWGeneral ConstructionSigned-offB & A RESTORATION CONTRA03/26/2024
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/01/2023
DOB NOWGeneral ConstructionSigned-offB & A RESTORATION CONTRA04/07/2023
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC03/13/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/09/2022
DOB NOWGeneral ConstructionSigned-offB & A RESTORATION CONTRA06/21/2022
DOB NOWGeneral ConstructionSigned-offCONSTRUCTION EXPERT INC05/26/2022
DOB NOWGeneral ConstructionSigned-offA & K CREATIVE CONSTRUCT*02/15/2022
DOB NOWGeneral ConstructionSigned-offHOME IMPRO SERVS GRP11/23/2021
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC09/20/2021
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC05/10/2021
DOB NOWPlumbingPermit IssuedP.S.I. MECHANICAL03/30/2021
BIS—ISSUEDRUMIA CONTRACTING CORP03/29/2021
BISOTISSUEDRUMIA CONTRACTING CORP10/01/2020
BISOTISSUEDGALICIA CONTRACTING & REST.01/05/2016
BISEQISSUEDSPRING SCAFFOLDING LLC10/22/2015
BISEQISSUEDOUTDOOR INSTALLATIONS LLC10/07/2010
BISEQISSUEDOUTDOOR INSTALL04/20/2005
BISEQISSUEDSPRING SCAFFOLDING10/13/2004
BISPLISSUEDA REAL GOOD PLUMBER INC02/01/2002
BISMHISSUEDBEST VALUE11/21/2001
BISPLISSUEDN.K.PLMB & HTNG CORP06/03/1999
BISMHISSUEDJOHN PRICEBUSTERS CONST.05/05/1999
BISOTISSUEDNY INTERIORS CONSTRUCTION04/05/1995
BISPLISSUEDH. UIBERALL INC.01/20/1995
1 project · most recent 03/02/2021
Water/Sanitary
FiledStatusContractorScope
03/02/2021Permit IssuedP.S.I. MECHANICALWater/Sanitary
4 projects · most recent 02/20/2022
General Wiring
FiledStatusContractorScope
02/20/2022CompleteLENS ELECTRIC, INCGeneral Wiring
11/15/2021CompleteCRESCO ELECTRICAL CORPGeneral Wiring
07/19/2021CompleteCRESCO ELECTRICAL CORPGeneral Wiring
05/21/2021CompleteBOROWIDE ELECT'L CONTR'S—
1 project · most recent 07/31/2023
Steel
FiledStatusContractorScope
07/31/2023Signed-offB & A RESTORATION CONTRASteel
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
12/10/2024Alternative Materials - OTCR Buildings Bulletin NumberMichael Walshspecial
12/10/2024Post-installed AnchorsMichael Walshspecial
07/11/2023FinalMuhammad Muhaysinprogress
07/11/2023MasonryMuhammad Muhaysinspecial
07/11/2023Post-installed AnchorsBRIAN O'CONNORspecial
07/11/2023Structural Stability – Alterations of existing buildingsMuhammad Muhaysinspecial
04/18/2022FinalChristopher Carranoprogress
04/12/2022FinalJoseph Kleinmannprogress
04/07/2022FinalChristopher Carranoprogress
11/19/2021Interior lighting powerDaniel O'Connorenergy_progress
11/04/2021Fire-Resistant Penetrations and JointsDaniel O'Connorspecial
11/01/2021FinalDaniel O'Connorprogress
03/25/2021Fire-Resistant Penetrations and JointsChristopher Carranospecial
02/08/2021Fire-Resistant Penetrations and JointsChristopher Carranospecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
DeNigrisRetailFloor 1, Mezzanine
Project M00717479 Alteration · LOC Issued · 05/23/2022
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 143 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch12
09/03/2026M00516627-I1Request digital key ↗
09/03/2026M00622853-I1Request digital key ↗
09/02/2026M00649634-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
09/04/2026M00336003-P1Request digital key ↗
08/14/2026M00336003-I1Request digital key ↗
▸Applications & Permits19
▸BISPLAN / WORK APPROVAL APPLICATION15
05/05/2022123868243Open ↗
07/09/2021123868243Open ↗
03/11/2021123868243Open ↗
Showing 3 of 15 on file for this type
▸BISWORK PERMIT APPLICATION4
03/29/2021123786411Open ↗
10/01/2020123868243Open ↗
02/18/2016122532330Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature14
09/04/2026M00336003-I1Open ↗
09/03/2026M00622853-I1Open ↗
08/29/2026M00842279-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/02/2026M00336003-P1Open ↗
09/01/2026M00622934-P1Open ↗
09/01/2026M00622934-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION8
10/17/2019123786411Open ↗
07/27/2016122532330Open ↗
01/20/2016122532330Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00622934-P1Open ↗
08/31/2026M00649634-P1Open ↗
08/27/2026M00622853-I1Open ↗
Showing 3 of 6 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
10/21/2015140418867Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
10/21/2015140418867Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/14/2010120494410Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
10/21/2015140418867Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/14/2010120494410Open ↗
▸Safety & Tenant Protection4
▸BISSTREET TREE CHECKLIST2
08/14/2020123786411Open ↗
10/17/2019123786411Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/29/2021123786411Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
01/20/2016122532330Open ↗
▸Environmental & Asbestos15
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/03/2026M00622853-I1Open ↗
08/14/2026M00336003-I1Open ↗
08/13/2026M00622934-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/24/2020123868243Open ↗
01/20/2016122532330Open ↗
03/06/2012120909437Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
08/13/2020123786411Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
10/14/2010120494410Open ↗
▸Energy Compliance11
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
03/29/2021123786411Open ↗
07/02/2020123786411Open ↗
04/24/2020123868243Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
10/17/2019123786411Open ↗
07/27/2016122532330Open ↗
10/03/2015122532330Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
10/21/2015140418867Open ↗
▸BISTR8: Energy Code Progress Inspections1
03/06/2012120909437Open ↗
▸BISLIGHTING CONTROLS1
03/03/2021123868243Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/27/2016122532330Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
09/03/2026M00622853-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
03/29/2021123786411Open ↗
07/02/2020123786411Open ↗
05/20/2020123868243Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
10/01/2020123868243Open ↗
▸Approvals, Objections & Sign-offs10
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
12/13/2016140418867Open ↗
12/07/2016140418867Open ↗
07/27/2016122532330Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE2
08/07/2020123786411Open ↗
10/17/2019123786411Open ↗
▸BISADMINISTRATIVE OBJECTIONS2
11/30/2011120909437Open ↗
10/14/2010120494410Open ↗
▸BISFINAL1
10/01/2020123868243Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
07/21/2021123868243Open ↗
04/24/2020123868243Open ↗
10/17/2019123786411Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION5
05/04/2022123868243Open ↗
07/21/2021123868243Open ↗
03/03/2021123868243Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
05/01/2020123868243Open ↗
10/17/2019123786411Open ↗
10/03/2015122532330Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET1
10/21/2015140418867Open ↗
▸Other Documents6
▸BISSupporting Document: Fee Deferment2
07/06/2016122532330Open ↗
07/06/2016122532330Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
12/13/2016140418867Open ↗
12/07/2016140418867Open ↗
▸BISPLOT DIAGRAM1
10/17/2019123786411Open ↗
▸DOB NOWIRA Certification1
08/13/2026M01136640-I1Open ↗