← Back
BuildNYC
Predominantly retail with other uses
151 WEST 29TH STREET
MANHATTAN · BIN 1083628
💬 Discuss this project
1890Year Built
5Stories
K4Building Class
M1-9A/R12Zoning
50,900 sfGross Floor Area
32Units
0 Active Violations
Predominantly retail with other uses · Owner of record: 140 AB · 12,220 sf lot · 4.17 FAR built · Flood zone X
Locations of Work
MechanicalGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1Comet Realty2p · 1 filing · 11 docs
Site & exteriorSidewalk fence installation1p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
140 Habern LLC 140 Pin High503/21/2026
Bernstein Real Estate403/21/2026
Comet Realty307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/12/2015$4.0M—Private party → 140 AB LLC$79/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MQ Consulting110/04/2019
William Lenart, Architects110/16/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA Design Group203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Empire 1 ElectricalElectrical703/21/2026
Empire I ElectricalElectrical203/22/2026
D.B.J. ContractingScaffold203/21/2026
Brace Construction LLC **General Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Veltre, P.E459110/04/2019
Building Lifecycle
All (14)Filed (2)Permit Issued (2)Signed Off (2)Violation (2)Special Inspection (6)
01/25/2024
Violation issued (ECB, closed)
Unknown
11/09/2023
Signed off — Alteration
M00050396-I1
11/09/2023
Signed off — Alteration
APPLICATION FILED FOR MECHANICAL WORK ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00209210-I1
08/19/2020
Permit issued — Mechanical Systems
M00209210-I1-MS
10/04/2019
Filed — Alteration
APPLICATION FILED FOR MECHANICAL WORK ON THE 1ST FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
M00209210-I1
08/12/2019
Special inspection requirement — Mechanical Systems
Thomas Veltre
08/12/2019
Special inspection requirement — Final
Thomas Veltre
08/12/2019
Special inspection requirement — Maintenance information
Thomas Veltre
08/12/2019
Special inspection requirement — HVAC and service water heating equipment
Thomas Veltre
08/12/2019
Special inspection requirement — HVAC insulation and sealing
Thomas Veltre
08/12/2019
Special inspection requirement — HVAC and service water heating system controls
Thomas Veltre
10/30/2018
Permit issued — Construction Fence
M00050396-I1-FN
10/16/2018
Filed — Alteration
M00050396-I1
11/17/1994
Violation issued (ECB, closed)
Elevators
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offBrace Construction LLC **08/19/2020
DOB NOWConstruction FenceSigned-offDBJ Contracting10/30/2018
BIS—ISSUEDD.B.J. Contracting03/31/2023
BISPLISSUEDReem Plumbing & Heating03/03/2022
BIS—ISSUEDD.B.J. Contracting12/20/2021
BIS—ISSUEDD.B.J. Contracting10/28/2021
BIS—ISSUEDD.B.J. Contracting10/14/2020
BISOTISSUEDD.B.J. Contracting10/29/2018
BISOTISSUEDD.B.J. Contracting10/29/2018
BISPLISSUEDPremier Flow Plumbing and Heating09/28/2018
BISOTISSUEDD.B.J. Contracting10/27/2017
BISPLISSUEDPremier Flow Plumbing and Heating10/27/2017
BISOTISSUEDD.B.J. Contracting10/27/2017
BISPLISSUEDPremier Flow Plumbing and Heating09/19/2017
BISOTISSUEDD.B.J. Contracting10/27/2016
BISOTISSUEDD.B.J. Contracting10/27/2016
BISOTISSUEDD.B.J. Contracting08/19/2016
BISOTISSUEDD.B.J. Contracting08/19/2016
3 projects · most recent 06/20/2024
General Wiring
FiledStatusContractorScope
06/20/2024CompleteEmpire I ElectricalGeneral Wiring
06/20/2024CompleteEmpire I ElectricalGeneral Wiring
05/21/2019CompleteHigh Beam ElectricGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
08/12/2019Mechanical SystemsThomas Veltrespecial
08/12/2019FinalThomas Veltreprogress
08/12/2019Maintenance informationThomas Veltreenergy_progress
08/12/2019HVAC and service water heating equipment Thomas Veltreenergy_progress
08/12/2019HVAC insulation and sealing Thomas Veltreenergy_progress
08/12/2019HVAC and service water heating system controls Thomas Veltreenergy_progress
▾Documents — 163 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch1
09/06/2026M00050396-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
09/05/2026M00209210-I1Request digital key ↗
▸Applications & Permits40
▸BISPLAN / WORK APPROVAL APPLICATION26
05/13/2025122835423Open ↗
05/02/2025122835423Open ↗
04/29/2025122835423Open ↗
Showing 3 of 26 on file for this type
▸BISWORK PERMIT APPLICATION13
03/04/2022123110524Open ↗
10/14/2020122835423Open ↗
10/29/2018122826549Open ↗
Showing 3 of 13 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
11/01/2023122835423Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISRESTRICTIVE DECLARATION/EASEMENT1
08/07/2024122835423Open ↗
▸BISVERIFY TAX LOT1
03/30/2022122835423Open ↗
▸BISEASEMENT AND RESTRICTIVE DECLARATIONS - SUPPPORTING DOCUMENTATION1
06/23/2020122835423Open ↗
▸BISCO OBJ: VERIFY ADDRESS-TOPO STAMP1
03/30/2022122835423Open ↗
▸Seals & Professional Certifications29
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION16
11/08/2019122826549Open ↗
11/08/2019122826549Open ↗
11/08/2019122826549Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
08/24/2026M00209210-I1Open ↗
08/24/2026M00209210-I1Open ↗
08/24/2026M00209210-I1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/05/2017123110524Open ↗
07/14/2016122826549Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
09/05/2017123110524Open ↗
07/14/2016122826549Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/06/2026M00050396-I1Open ↗
08/13/2026M00209210-I1Open ↗
▸BISProfessional and Owner Certification (POC3)1
07/15/2016122826549Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/24/2026M00209210-I1Open ↗
▸Trade Schedules & Equipment7
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE6
03/17/2020123110524Open ↗
01/30/2020123110524Open ↗
08/23/2019123110524Open ↗
Showing 3 of 6 on file for this type
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
02/13/2023122835423Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes4
05/13/2019123808754Open ↗
09/05/2017123110524Open ↗
11/03/2016122835423Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE CHECKLIST2
10/14/2020122835423Open ↗
11/04/2016122835423Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM2
08/26/2016122826549Open ↗
07/14/2016122826549Open ↗
▸BISSTREET TREE SIGNOFF1
03/30/2022122835423Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
10/15/2020122835423Open ↗
▸DOB NOWTenant Protection Plan1
08/13/2026M00209210-I1Open ↗
▸Environmental & Asbestos4
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
09/05/2017123110524Open ↗
11/04/2016122835423Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
07/14/2016122826549Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026M00209210-I1Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
11/08/2019122826549Open ↗
11/08/2019122826549Open ↗
11/04/2019122826549Open ↗
Showing 3 of 6 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS3
11/08/2019122826549Open ↗
11/04/2019122826549Open ↗
07/11/2019122826549Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
11/22/2023122835423Open ↗
04/13/2022123110524Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
12/14/2023122835423Open ↗
▸Inspections & Test Reports4
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)2
04/13/2022123110524Open ↗
04/13/2022123110524Open ↗
▸BISTECHNICAL REPORT: PILE DRIVING1
11/08/2019122826549Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY1
12/13/2023122835423Open ↗
▸Approvals, Objections & Sign-offs13
▸BISSCHEDULE A - OCCUPANCY / USE7
05/13/2025122835423Open ↗
05/02/2025122835423Open ↗
04/24/2025122835423Open ↗
Showing 3 of 7 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
04/19/2022123110524Open ↗
11/08/2019122826549Open ↗
11/04/2019122826549Open ↗
Showing 3 of 4 on file for this type
▸BISDOCUMENTS FOR EXISTING OCCUPANCY OF THE BUILDING1
08/07/2024122835423Open ↗
▸BISSUPERSEDING LETTER1
03/04/2022123110524Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT10
11/08/2019122826549Open ↗
11/04/2019122826549Open ↗
07/11/2019122826549Open ↗
Showing 3 of 10 on file for this type
▸BISCOST AFFIDAVIT (FINAL): PW32
12/07/2023122835423Open ↗
04/15/2022123110524Open ↗
▸Filing & Intake Forms21
▸BISBOROUGH INTAKE FORM10
02/22/2022123110524Open ↗
01/30/2020123110524Open ↗
11/08/2019122826549Open ↗
Showing 3 of 10 on file for this type
▸BISADDITIONAL INFORMATION6
06/10/2024122835423Open ↗
06/23/2020122835423Open ↗
03/17/2020123110524Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING COVER SHEET5
05/10/2019123808754Open ↗
09/05/2017123110524Open ↗
11/03/2016122835423Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWLoft Board Certificate2
08/13/2026M00050396-I1Open ↗
08/13/2026M00209210-I1Open ↗
▸BISPLOT DIAGRAM1
11/03/2016122835423Open ↗
▸BISTCO - Supporting Documents1
04/22/2025122835423Open ↗