| Owner | Filings | Most Recent |
|---|---|---|
| 151 WEST 30TH STREET | 69 | 03/22/2026 |
| CDS DESIGN AND CONSULTING | 3 | 03/22/2026 |
| 151 W 30 ST | 1 | 03/22/2026 |
| 151 WEST 30 STREET | 9 | 03/22/2026 |
| 151 W 30TH ST ASSOC | 1 | 03/22/2026 |
| JEFFREY D SMITH/OWNER AGE | 1 | 03/22/2026 |
| 151 WEST 30 ASSOCIATES | 1 | 03/22/2026 |
| 151 WEST 30 ST ASSOCI | 1 | 03/22/2026 |
| DAKOTA REALTY | 3 | 03/22/2026 |
| LAKE REALTY | 19 | 03/21/2026 |
| Firm | Filings | Most Recent |
|---|---|---|
| BHK ENGINEERING | 2 | 08/20/2026 |
| MURDOCK SOLON ARCHITECTS | 3 | 06/15/2026 |
| MEHANDES ENGINEERING | 5 | 12/04/2025 |
| KIMOY STUDIOS ARCHITECTURE DPC | 10 | 08/01/2024 |
| JACK GREEN ASSOCIATES | 3 | 08/16/2023 |
| JONG HAE CHANG ARCHITECT | 1 | 08/07/2023 |
| 2LS CONSULTING ENGINEERING, DPC | 4 | 09/25/2020 |
| Representative | Filings | Most Recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 8 | 03/21/2026 |
| BSD CONSULTING | 6 | 03/21/2026 |
| NYCCODE | 20 | 03/21/2026 |
| GREEN LIGHT EXPEDITING LLC | 8 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| CDS DESIGN AND CONSULTING | General Contractor | 12 | 07/08/2026 |
| METFLOW FIRE CONTROL LLC | Fire Protection | 4 | 09/09/2026 |
| BARRY KAPLOWITZ | Electrical | 3 | 03/21/2026 |
| MARLEX MANAGEMENT INC | General Contractor | 3 | 07/08/2026 |
| KAPLOWITZ BARRY | Electrical | 3 | 03/21/2026 |
| ACCARDI, JAMES | Electrical | 2 | 03/21/2026 |
| LAMBERT, RYAN | Electrical | 2 | 03/21/2026 |
| FINIX U.S.A. CONSTRUCTION | General Contractor | 2 | 03/21/2026 |
| STAT COOLING INC | General Contractor | 2 | 04/09/2026 |
| CREATIVE PLUMBING IN | Plumbing | 2 | 07/08/2026 |
| L&J PLG & HTG CO OF NY IN | Plumbing | 2 | 07/08/2026 |
| POWER PLUMBING & HEATING | Plumbing | 1 | 07/08/2026 |
| JOSEPH MOSKOWITZ | Electrical | 1 | 03/21/2026 |
| PRESTIGIOUS MAINTENANCE I | General Contractor | 1 | 07/08/2026 |
| SANCHEZ ALBERTO | Electrical | 1 | 03/21/2026 |
| AVON PLBG & HTG INC | Fire Protection | 1 | 07/08/2026 |
| RELLA ELECTRIC LLC | Electrical | 1 | 03/22/2026 |
| JOSHUA NIEVES | Electrical | 1 | 03/21/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| BHK ENGINEERING, D.P.C. | 9589 | 2 | 08/20/2026 |
| ALNOUR CONSULTING ENGINEE | 607 | 7 | 12/04/2025 |
| O'ROURKE ENGINEERING, LLC | 5873 | 7 | 08/01/2024 |
| ALAN MARGOLIN & ASSOC | 423 | 4 | 12/04/2023 |
| JACK GREEN ASSOCIATES | 422 | 1 | 08/16/2023 |
| M C STRUCTURAL ENGINEERIN | 4890 | 1 | 10/17/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Standpipe | Permit Issued | METFLOW FIRE CONTROL LLC | 09/08/2026 |
| DOB NOW | Plumbing | Permit Issued | CREATIVE PLUMBING IN | 06/18/2026 |
| DOB NOW | General Construction | Permit Issued | MARLEX MANAGEMENT INC | 04/14/2026 |
| DOB NOW | Structural | Permit Issued | MARLEX MANAGEMENT INC | 03/18/2026 |
| DOB NOW | Mechanical Systems | Permit Issued | STAT COOLING INC | 11/12/2025 |
| DOB NOW | Sprinklers | Permit Issued | METFLOW FIRE CONTROL LLC | 10/24/2025 |
| DOB NOW | General Construction | Permit Issued | MARLEX MANAGEMENT INC | 10/24/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | PRESTIGIOUS MAINTENANCE I | 08/19/2025 |
| DOB NOW | Mechanical Systems | Signed-off | STAT COOLING INC | 02/27/2025 |
| DOB NOW | Suspended Scaffold | Permit Issued | M.G.R. RESTORATION INC | 12/04/2024 |
| DOB NOW | General Construction | Signed-off | CDS DESIGN AND CONSULTING | 05/14/2024 |
| DOB NOW | Mechanical Systems | Signed-off | CDS DESIGN AND CONSULTING | 12/14/2023 |
| DOB NOW | Plumbing | Signed-off | METFLOW FIRE CONTROL LLC | 10/12/2023 |
| DOB NOW | Construction Fence | Signed-off | CDS DESIGN AND CONSULTING | 08/29/2023 |
| DOB NOW | Plumbing | Signed-off | AVON PLBG & HTG INC | 07/06/2023 |
| DOB NOW | Plumbing | Signed-off | AB PLUMBING INC | 06/02/2023 |
| DOB NOW | General Construction | Signed-off | CDS DESIGN AND CONSULTING | 03/22/2023 |
| DOB NOW | Sprinklers | Signed-off | POWER PLUMBING & HEATING | 01/05/2023 |
| DOB NOW | Mechanical Systems | Signed-off | CDS DESIGN AND CONSULTING | 12/08/2022 |
| DOB NOW | Structural | Signed-off | CDS DESIGN AND CONSULTING | 12/08/2022 |
| DOB NOW | Sprinklers | Signed-off | METFLOW FIRE CONTROL LLC | 11/02/2020 |
| DOB NOW | Mechanical Systems | Signed-off | ANSANO CONSTRUCTION CORP | 10/02/2020 |
| DOB NOW | Plumbing | Signed-off | L&J PLG & HTG CO OF NY IN | 08/24/2020 |
| DOB NOW | Plumbing | Signed-off | L&J PLG & HTG CO OF NY IN | 06/22/2020 |
| BIS | OT | ISSUED | SUPREME CONSTRUCTION OF N | 06/16/2022 |
| BIS | OT | ISSUED | FINIX U.S.A. CONSTRUCTION | 08/03/2020 |
| BIS | — | ISSUED | FINIX U.S.A. CONSTRUCTION | 01/30/2020 |
| BIS | MH | ISSUED | TANNEN CONTRACTING CO INC | 04/19/2019 |
| BIS | OT | ISSUED | CONTINENTAL WINDOW CLEANI | 12/16/2016 |
| BIS | EQ | ISSUED | SILVERCUP SCAFFOLDING 1 L | 07/20/2016 |
| BIS | OT | ISSUED | VANTAGE ASSOCIATES INC | 03/07/2014 |
| BIS | PL | ISSUED | ORBIT PLBG & HTG INC | 02/04/2014 |
| BIS | MH | ISSUED | RED OAK RENOVATIONS CORP | 01/22/2014 |
| BIS | OT | ISSUED | RED OAK RENOVATIONS CORP | 01/21/2014 |
| BIS | OT | ISSUED | VANTAGE ASSOCIATES INC | 11/13/2013 |
| BIS | MH | ISSUED | SUPERIOR AIR COND & HEAT | 10/07/2013 |
| BIS | FS | ISSUED | DOUGLAS SIMMONS | 09/24/2013 |
| BIS | OT | ISSUED | INTEGRITY CONTRACTING INC | 09/05/2013 |
| BIS | OT | ISSUED | INTEGRITY CONTRACTING INC | 09/05/2013 |
| BIS | PL | ISSUED | UNITED ONE MECHANICAL INC | 08/22/2013 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 09/16/2025 | Permit Issued | STAT COOLING INC | Air Conditioning Systems, Heating Systems, Others, Ventilation Systems | Cooling Mitsubishi Electric PEFY -P36NMAU-E4 36,000 BTU · Vrf Indoor ×1 PEFY-P30NMAU-E4 30,000 BTU · Vrf Indoor ×1 PEFY-P36NMAU-E4 36,000 BTU · Vrf Indoor ×1 PEFY-P48NMAU-E4 48,000 BTU · Vrf Indoor ×1 PLFY-P18NFMU-E 18,000 BTU · Vrf Indoor ×1 PURY-EP240TSNU-A 120,000 BTU · Vrf Outdoor ×1 PVFY-P24NAMU-E1 24,000 BTU · Vrf Indoor ×1 Heating Mitsubishi Electric PVFY-P24NAMU-E1 27,000 BTU · Vrf Indoor ×2 PEFY -P36NMAU-E4 40,000 BTU · Vrf Indoor ×1 PEFY-P30NMAU-E4 34,000 BTU · Vrf Indoor ×1 PEFY-P36NMAU-E4 40,000 BTU · Vrf Indoor ×1 PEFY-P48NMAU-E4 54,000 BTU · Vrf Indoor ×1 PLFY-P18NFMU-E 20,000 BTU · Vrf Indoor ×1 PURY-EP240TSNU-A 135,000 CFM · Vrf Outdoor ×1 Ventilation Greenheck EAD-635-24X24 1,500 CFM · Exhaust Fan ×1 ECD-601-40X24 1,250 CFM · Exhaust Fan ×1 EDC-601-40X24 1,350 CFM · Exhaust Fan ×1 Renewaire HE-2XJINH-S35UU-UN2 1,350 CFM · Erv ×1 Seaira Global WATCHDOG NXT85C 185 CFM ×1 Other Mitsubishi Electric CMB-P108NU-JA1 1 CFM · Controls ×1 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | Permit Issued | METFLOW FIRE CONTROL LLC | 1 outlets |
| 09/16/2025 | Permit Issued | METFLOW FIRE CONTROL LLC | Sprinkler System |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | Permit Issued | METFLOW MECHANICAL LLC | Water/Sanitary |
| 09/16/2025 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 12/09/2025 | Complete | RELLA ELECTRIC LLC | General Wiring |
| 10/29/2025 | Complete | CYM ELECTRICAL CONTRACTOR | General Wiring |
| 05/19/2023 | Complete | Y.S ELECTRIC | General Wiring, Lighting |
| 12/04/2020 | Complete | ADMIRAL ELECTRIC LLC | General Wiring |
| 03/17/2019 | Complete | ADMIRAL ELECTRIC LLC | General Wiring |
| 05/13/2018 | Permit Issued | BINDER ELT'L SERVICE CORP | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 08/20/2026 | Permit Issued | METFLOW FIRE CONTROL LLC | Steel, Masonry |
| Date | Type | Result | Report |
|---|---|---|---|
| 04/15/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 04/08/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/25/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/09/2026 | Certified Storm Drainage-ST-Fixtures-Finish | Certified | View ↗ |
| 03/06/2026 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 02/20/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/18/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/18/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/31/2025 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 10/31/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 10/31/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/14/2024 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 06/12/2024 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 05/16/2024 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 05/15/2024 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 05/09/2024 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 10/18/2023 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 10/16/2023 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 10/16/2023 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 10/16/2023 | Certified Water and Sanitary-WS-Fixtures-Finish | Certified | View ↗ |
| 10/12/2023 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 07/07/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 06/06/2023 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 03/30/2023 | Pass-Final PL - Underground | Pass | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 08/21/2026 | Structural Steel - Welding | William DeGraaff | special |
| 08/21/2026 | Post-installed Anchors | William DeGraaff | special |
| 08/21/2026 | Structural Stability – Alterations of existing buildings | William DeGraaff | special |
| 08/21/2026 | Masonry | William DeGraaff | special |
| 08/21/2026 | Final | William DeGraaff | progress |
| 08/21/2026 | Structural Steel - High Strength Bolting | William DeGraaff | special |
| 08/21/2026 | Structural Steel - Details | William DeGraaff | special |
| 08/21/2026 | Structural Cold-Formed Steel | William DeGraaff | special |
| 08/04/2026 | Structural Stability – Alterations of existing buildings | William DeGraaff | special |
| 08/04/2026 | Structural Steel - Details | William DeGraaff | special |
| 08/04/2026 | Structural Steel - High Strength Bolting | William DeGraaff | special |
| 08/04/2026 | Structural Steel - Welding | William DeGraaff | special |
| 08/04/2026 | Final | William DeGraaff | progress |
| 08/04/2026 | Masonry | William DeGraaff | special |
| 08/04/2026 | Post-installed Anchors | William DeGraaff | special |
| 08/04/2026 | Structural Cold-Formed Steel | William DeGraaff | special |
| 07/21/2026 | Structural Stability – Alterations of existing buildings | — | special |
| 03/10/2026 | Fire-Resistant Penetrations and Joints | Nouredine Benabdelhak | special |
| 09/25/2025 | Final | Nouredine Benabdelhak | progress |
| 09/09/2025 | HVAC-R and service water heating equipment | Nouredine Benabdelhak | energy_progress |
| 09/09/2025 | Energy Code Compliance Inspections | Nouredine Benabdelhak | progress |
| 09/09/2025 | Heating Systems | Nouredine Benabdelhak | special |
| 09/09/2025 | Duct leakage testing, insulation and design | Nouredine Benabdelhak | energy_progress |
| 09/09/2025 | HVAC-R and service water heating system controls | Nouredine Benabdelhak | energy_progress |
| 09/09/2025 | HVAC-R and service water piping design and insulation | Nouredine Benabdelhak | energy_progress |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Chai Lifeline | Office | Floor 7 | Project M08006314 Project M08006953 |
| I Pho U Restaurant | Restaurant / Food Service | Cellar, Ground | Project M00780168 |