← Back
Converted dwellings or rooming house
151 WEST 87 STREET
MANHATTAN · Upper West Side (Central) · BIN 1079525
💬 Discuss this project
1887Year Built
5Stories
C5Building Class
R7-2Zoning
11,940 sfGross Floor Area
21Units
Rent Stabilized5 Open Violations ▸FDNY Report ↗
Converted dwellings or rooming house · Owner of record: 151 WEST 87RD STREET · 3,355 sf lot · 3.56 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Cellar3p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
LEEDS ASSOCIATES807/08/2026
151 WEST 87RD STREET103/22/2026
151- WEST 87 STREET LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NEW AGE ENGINEERING PLLC403/23/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WARD PLUMBING CORPPlumbing307/08/2026
AGGRESSIVE HEATING INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NEW AGE ENGINEERING PLLC7746312/20/2022
Building Lifecycle
All (53)Filed (4)Permit Issued (3)Signed Off (3)Violation (30)Inspection (4)Special Inspection (9)
03/16/2026
Violation issued (HPD, closed)
C
03/16/2026
Violation issued (HPD, closed)
A
03/16/2026
Violation issued (HPD, closed)
C
11/17/2025
Violation issued (HPD, closed)
I
01/06/2024
Violation issued (HPD, closed)
C
07/18/2023
Signed off — Alteration
M08048098-I1
07/18/2023
Signed off — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M08048108-I1
07/18/2023
Signed off — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILER TO EXISTING GAS PIPING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M08048121-I1
06/30/2023
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/24/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/23/2023
Filed — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILER TO EXISTING GAS PIPING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M08048121-P1
03/21/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/21/2023
Special inspection requirement — Tenant Protection Plan Compliance
01/20/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/02/2023
Violation issued (HPD, closed)
C
12/28/2022
Permit issued — Mechanical Systems
M08048108-I1-MS
12/20/2022
Filed — Alteration
INSTALL NEW CHIMNEY LINER AS PER PLANS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M08048108-I1
12/20/2022
Special inspection requirement — Chimneys and vents
Stephen Shishko
12/15/2022
Permit issued — Boiler Equipment
M08048098-I1-BE
12/14/2022
Permit issued — Plumbing
M08048121-I1-PL
12/07/2022
Filed — Alteration
M08048098-I1
12/07/2022
Filed — Alteration
CONNECT REPLACEMENT GAS-FIRED BOILER TO EXISTING GAS PIPING. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
M08048121-I1
12/07/2022
Special inspection requirement — HVAC-R and service water heating equipment
Stephen Shishko
12/07/2022
Special inspection requirement — Maintenance information
Stephen Shishko
12/07/2022
Special inspection requirement — HVAC-R and service water heating system controls
Stephen Shishko
12/01/2022
Special inspection requirement — Mechanical Systems
Stephen Shishko
12/01/2022
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
12/01/2022
Special inspection requirement — Tenant Protection Plan Compliance
Stephen Shishko
12/01/2022
Special inspection requirement — Final
Stephen Shishko
08/21/2021
Violation issued (HPD, closed)
C
08/21/2021
Violation issued (HPD, closed)
C
08/18/2021
Violation issued (HPD, closed)
A
08/18/2021
Violation issued (HPD, closed)
C
08/02/2021
Violation issued (HPD, closed)
A
08/02/2021
Violation issued (HPD, closed)
A
07/30/2021
Violation issued (HPD, closed)
C
06/18/2021
Violation issued (HPD, closed)
C
06/18/2021
Violation issued (HPD, closed)
C
06/18/2021
Violation issued (HPD, closed)
C
06/18/2021
Violation issued (HPD, closed)
C
02/03/2020
Violation issued (HPD, closed)
C
06/08/2018
Violation issued (HPD, open)
A
06/08/2018
Violation issued (HPD, open)
A
06/08/2018
Violation issued (HPD, open)
A
04/18/2018
Violation issued (HPD, closed)
A
04/18/2018
Violation issued (HPD, open)
A
04/18/2018
Violation issued (HPD, open)
A
08/21/2015
Violation issued (HPD, closed)
C
01/31/2007
Violation issued (ECB, closed)
Boilers
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/05/1993
Violation issued (ECB, closed)
Construction
03/18/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offAGGRESSIVE HEATING INC12/28/2022
DOB NOWBoiler EquipmentSigned-offWARD PLUMBING CORP12/15/2022
DOB NOWPlumbingSigned-offWARD PLUMBING CORP12/14/2022
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
06/30/2023Pass-Final Boiler Equipment InspectionPassView ↗
03/24/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/21/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/20/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
03/21/2023Tenant Protection Plan Compliance—special
12/20/2022Chimneys and ventsStephen Shishkospecial
12/07/2022HVAC-R and service water heating equipmentStephen Shishkoenergy_progress
12/07/2022Maintenance informationStephen Shishkoenergy_progress
12/07/2022HVAC-R and service water heating system controlsStephen Shishkoenergy_progress
12/01/2022Mechanical SystemsStephen Shishkospecial
12/01/2022Tenant Protection Plan ComplianceStephen Shishkospecial
12/01/2022Tenant Protection Plan ComplianceStephen Shishkospecial
12/01/2022FinalStephen Shishkoprogress
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
09/01/2026M08048121-I1Request digital key ↗
09/01/2026M08048121-P1Request digital key ↗
09/01/2026M08048098-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Applications & Permits1
▸DOB NOWLPC Approval/Permit1
08/13/2026M08048108-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWSpecial Inspector Seal & Signature4
09/23/2026M08048098-I1Open ↗
08/30/2026M08048108-I1Open ↗
08/30/2026M08048108-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/23/2026M08048098-I1Open ↗
09/23/2026M08048098-I1Open ↗
09/23/2026M08048098-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
09/01/2026M08048121-I1Open ↗
09/01/2026M08048121-P1Open ↗
09/01/2026M08048108-I1Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
09/01/2026M08048121-P1Open ↗
09/01/2026M08048121-I1Open ↗
09/01/2026M08048108-I1Open ↗
Showing 3 of 4 on file for this type
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026M08048098-I1Open ↗