← Back
Multi-story retail building (2+)
1510 HYLAN BOULEVARD
STATEN ISLAND · BIN 5091222
💬 Discuss this project
1987Year Built
2Stories
K2Building Class
R3XZoning
17,416 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Multi-story retail building (2+) · Owner of record: AJA LAND ENTERPRISES CORP · 29,000 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalLandscapeGeneral
Roof11p · 3 filings · 5 docs
Floor 26p · 4 filings · 10 docs
Floor 1
1 job · most recent 06/23/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
06/23/2026——Heating and Air Conditioning Systems
Heat / Cool
Arcoaire RGV120HE2A0AAA 10 tons · Rooftop Unit ×2
2 jobs · most recent 02/23/2024
General Wiring
FiledStatusContractorScope
02/23/2024CompleteNEWBRIDGE ELECTL CONTNG—
11/06/2023CompleteMASSARO ELECTRIC CORP.General Wiring
Building Lifecycle
All (86)Filed (11)Permit Issued (11)Signed Off (10)Violation (26)Inspection (6)Objection (6)Special Inspection (16)
07/29/2026
Objection resolved — Addressed
07/29/2026
Objection resolved — Open
07/21/2026
Objection resolved — Addressed
07/02/2026
Objection raised — Scope
07/02/2026
Objection raised — Zoning
07/02/2026
Objection raised — Fire_Protection
06/23/2026
Filed — Alteration
direct replacement of two (2) roof top units onto existing roof curb
S01408786-I1
05/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JOSEPH YOUNG
05/28/2026
Special inspection requirement — Mechanical Systems
JOSEPH YOUNG
05/28/2026
Special inspection requirement — Final
JOSEPH YOUNG
05/28/2026
Special inspection requirement — Energy Code Compliance Inspections
JOSEPH YOUNG
05/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
JOSEPH YOUNG
05/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
JOSEPH YOUNG
09/13/2024
Signed off — Alteration
S00787695-I1
09/04/2024
Signed off — Alteration
S00934361-I1
08/30/2024
Signed off — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S00934366-I1
08/30/2024
Signed off — Alteration
S00846769-I1
08/30/2024
Signed off — Alteration
S00846732-I1
08/30/2024
Signed off — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 2ND FLOOR AND ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S00846751-I1
08/08/2024
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/31/2024
Signed off — Alteration
APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S00842424-I1
07/05/2024
Permit issued — Antenna
S00787695-I1-AN
06/25/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/13/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/31/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/12/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/08/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
02/02/2024
Permit issued — Plumbing
S00934366-I1-PL
12/21/2023
Permit issued — Mechanical Systems
S00846751-I1-MS
12/04/2023
Permit issued — Sprinklers
S00846769-I1-EW-SP
11/30/2023
Filed — Alteration
APPLICATION FILED FOR MECHANICAL MODIFICATIONS/ADDITIONS ON THE 2ND FLOOR AND ROOF AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S00846751-I1
11/29/2023
Filed — Alteration
APPLICATION FILED FOR PLUMBING MODIFICATIONS/ADDITIONS ON THE 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S00934366-I1
11/29/2023
Filed — Alteration
S00846769-I1
11/27/2023
Permit issued — Foundation
S00846732-I1-GC-CX
11/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Dave Wall
11/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
Dave Wall
11/25/2023
Special inspection requirement — Maintenance information
Dave Wall
11/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
Dave Wall
11/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Dave Wall
11/20/2023
Permit issued — General Construction
S00934361-I1-GC
11/15/2023
Filed — Alteration
S00846732-I1
11/13/2023
Filed — Alteration
S00934361-I1
10/17/2023
Permit issued — General Construction
S00842424-I1-GC
10/10/2023
Signed off — Alteration
S00900039-I1
10/05/2023
Filed — Alteration
APPLICATION FILED FOR INTERIOR REMOVAL OF NON-LOAD BEARING PARTITIONS, CEILINGS, AND FINISHES ON THE 1ST AND 2ND FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
S00842424-I1
09/29/2023
Permit issued — Mechanical Systems
S00900039-I1-MS
08/09/2023
Filed — Alteration
S00900039-I1
03/29/2023
Permit issued — Antenna
S00787695-I1-AN
03/10/2023
Special inspection requirement — Final
William Ryan
03/09/2023
Filed — Alteration
S00787695-I1
11/10/2021
Signed off — Alteration
DIRECT REPLACEMENT OF (1) 3-TON ROOFTOP HVAC SINGLE PACKAGE UNIT ONTO EXISTING ROOF CURB.
S00607420-I1
10/19/2021
Permit issued — Mechanical Systems
S00607420-I1-MS
10/12/2021
Filed — Alteration
DIRECT REPLACEMENT OF (1) 3-TON ROOFTOP HVAC SINGLE PACKAGE UNIT ONTO EXISTING ROOF CURB.
S00607420-I1
10/06/2021
Special inspection requirement — Mechanical Systems
anthony santoro
10/06/2021
Special inspection requirement — Final
anthony santoro
10/06/2021
Special inspection requirement — Maintenance information
anthony santoro
10/06/2021
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
07/08/2021
Signed off — Alteration
Installation of new VERIZON telecommunications site. Installation of 9 antennas (3 sectors), 2 GPS units, 12 small cell units, & 1 equipment cabinet on the roof. Related conduits on 1st floor. All work in conformance with TPPN 5/98. No change in use, egress, or occupancy.
S00135456-I1
12/12/2019
Permit issued — Antenna
S00135456-I1-AN
10/15/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
Latest 60 of 86 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FOREST PLAZA909/13/2026
220 72 STREET REALTY CORP.503/22/2026
AA DEVELOPMENT103/22/2026
AJA ENTERPRISES103/22/2026
OWNER OF ADDRESS 1510103/22/2026
OWNER OF 1510 HYLAN BLVD103/22/2026
1510 HYLAN BLVD103/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
EA DESIGN GROUP1203/21/2026
A TECH ENGINEERING NYC403/21/2026
CONSTRUCTION PERMIT SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
COW BAY SPRINKLER CORPGeneral Contractor307/08/2026
STONEWOLF CONTRACTING INCGeneral Contractor303/21/2026
MVS HEATING & AIR CONDITGeneral Contractor303/21/2026
ODYSSIA GLOBAL COMM. CORPGeneral Contractor207/08/2026
RICHMOND PLBG & HEATINGPlumbing107/08/2026
EC ELECTRICAL CONTRACTORGeneral Contractor107/08/2026
PANACEA CONTRACTING CORPGeneral Contractor107/08/2026
FIVE BOROUGH NYC LLCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METROSPEC SIA6420106/23/2026
TWIG SPECIAL INSPECTIONS885311/30/2023
METRIC CONSULTING AND INS1803111/15/2023
A TECH ENGINEERING NYC, P6738208/09/2023
TECTONIC ENGINEERING CONS106303/09/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP07/05/2024
DOB NOWPlumbingSigned-offRICHMOND PLBG & HEATING02/02/2024
DOB NOWMechanical SystemsSigned-offSTONEWOLF CONTRACTING INC12/21/2023
DOB NOWSprinklersSigned-offFIVE BOROUGH NYC LLC12/04/2023
DOB NOWFoundationSigned-offCOW BAY SPRINKLER CORP11/27/2023
DOB NOWGeneral ConstructionSigned-offCOW BAY SPRINKLER CORP11/20/2023
DOB NOWGeneral ConstructionSigned-offCOW BAY SPRINKLER CORP10/17/2023
DOB NOWMechanical SystemsSigned-offPANACEA CONTRACTING CORP09/29/2023
DOB NOWAntennaSigned-offODYSSIA GLOBAL COMM. CORP03/29/2023
DOB NOWMechanical SystemsSigned-offMVS HEATING & AIR CONDIT10/19/2021
DOB NOWAntennaSigned-offEC ELECTRICAL CONTRACTOR12/12/2019
BISOTISSUEDEC ELECTRICAL CONTRACTOR11/27/2019
BISMHISSUEDMVS HEATING & AIR CONDIT11/20/2018
BISMHISSUEDPETER STEVEN QUNCI & ASSOC INC05/10/2005
BISSPISSUEDONOFRIO LODUCA PLBG CORP.05/03/2005
BISPLISSUEDONOFRIO LODUCA PLBG CORP12/22/2004
BISPLRE-ISSUEDONOFRIO LODUCA PLBG CORP12/01/2004
BIS—ISSUEDA.A. DEVELOPMENT CO INC08/12/2004
BISOTISSUEDA.A. DEVELOPMENT CO., INC07/06/2004
BISPLISSUEDONOFRIO LODUCA PLBG CORP11/14/2002
BIS—ISSUEDA.A. DEVELOPMENT CO INC10/10/2002
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/08/2024Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/25/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
06/13/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/31/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/12/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
02/08/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
05/28/2026HVAC-R and service water piping design and insulationJOSEPH YOUNGenergy_progress
05/28/2026Mechanical SystemsJOSEPH YOUNGspecial
05/28/2026FinalJOSEPH YOUNGprogress
05/28/2026Energy Code Compliance InspectionsJOSEPH YOUNGprogress
05/28/2026HVAC-R and service water heating equipmentJOSEPH YOUNGenergy_progress
05/28/2026HVAC-R and service water heating system controlsJOSEPH YOUNGenergy_progress
11/25/2023Energy Code Compliance InspectionsDave Wallprogress
11/25/2023HVAC-R and service water heating system controlsDave Wallenergy_progress
11/25/2023Maintenance informationDave Wallenergy_progress
11/25/2023HVAC-R and service water heating equipmentDave Wallenergy_progress
11/25/2023HVAC-R and service water piping design and insulationDave Wallenergy_progress
03/10/2023FinalWilliam Ryanprogress
10/06/2021Mechanical Systemsanthony santorospecial
10/06/2021Finalanthony santoroprogress
10/06/2021Maintenance informationanthony santoroenergy_progress
10/06/2021HVAC-R and service water heating equipmentanthony santoroenergy_progress
▾Documents — 75 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch9
08/25/2026S00607420-I1Request digital key ↗
08/23/2026S00787695-I1Request digital key ↗
08/22/2026S00900039-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸DOB NOWPlans/Sketch - Antenna1
08/26/2026S00135456-I1Request digital key ↗
▸Applications & Permits5
▸BISPLAN / WORK APPROVAL APPLICATION3
11/06/2019520394234Open ↗
04/22/2019520364980Open ↗
11/20/2018520364980Open ↗
▸BISWORK PERMIT APPLICATION2
11/29/2019520394234Open ↗
11/20/2018520364980Open ↗
▸Seals & Professional Certifications27
▸DOB NOWDPL-1: Design Professional Seal & Signature10
08/26/2026S00135456-I1Open ↗
08/25/2026S00607420-I1Open ↗
08/23/2026S00787695-I1Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/29/2026S00934366-I1Open ↗
08/29/2026S00934366-I1Open ↗
08/29/2026S00934366-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
03/26/2020520394234Open ↗
11/06/2019520394234Open ↗
04/26/2019520364980Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT1
11/20/2018520364980Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
11/20/2018520364980Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/28/2026S00607420-I1Open ↗
▸Trade Schedules & Equipment2
▸BISFA - FDNY APPROVAL : FD-FAA1
11/22/2019520394234Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
04/26/2019520364980Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/26/2026S00135456-I1Open ↗
08/23/2026S00787695-I1Open ↗
08/22/2026S00842424-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
11/06/2019520394234Open ↗
▸Energy Compliance7
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/26/2020520394234Open ↗
11/06/2019520394234Open ↗
12/17/2018520364980Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
03/26/2020520394234Open ↗
12/17/2018520364980Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026S00607420-I1Open ↗
▸Approvals, Objections & Sign-offs3
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
03/26/2020520394234Open ↗
04/26/2019520364980Open ↗
12/17/2018520364980Open ↗
▸Cost, Insurance & Ownership4
▸BISCOST AFFIDAVIT4
03/26/2020520394234Open ↗
11/06/2019520394234Open ↗
12/17/2018520364980Open ↗
Showing 3 of 4 on file for this type
▸Filing & Intake Forms8
▸BISBOROUGH INTAKE FORM4
03/26/2020520394234Open ↗
04/26/2019520364980Open ↗
04/19/2019520364980Open ↗
Showing 3 of 4 on file for this type
▸BISEFILING COVER SHEET2
11/06/2019520394234Open ↗
11/20/2018520364980Open ↗
▸BISADDITIONAL INFORMATION2
04/19/2019520364980Open ↗
04/19/2019520364980Open ↗
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
04/26/2019520364980Open ↗