← Back
BuildNYC
Elevator apt, semi-fireproof without stores
1510 OCEAN PARKWAY
BROOKLYN · BIN 3174946
💬 Discuss this project
1927Year Built
6Stories
D1Building Class
R6AZoning
96,000 sfGross Floor Area
113Units
LL97 CoveredRent Stabilized17 Active Violations 6 likely answered 1 old, status unconfirmed ▸FISP: SAFEFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: Kinway · 25,000 sf lot · 3.84 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 1JASCO, INC sidewalk shed installation4p · 1 filing · 13 docs
CellarBoiler replacement16p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Kinway1003/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company212/23/2021
Enthink Engineers410/15/2021
New Age110/01/2021
Rise Architecture NJ305/26/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company403/21/2026
Jack Jaffa & Associates603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JascoScaffold407/08/2026
Advanced Plumbing MechanicalPlumbing207/08/2026
County Electrical Contractor IElectrical103/22/2026
M Squared ContractorsGeneral Contractor103/21/2026
Spring EnterprisGeneral Contractor103/21/2026
UK 2 ConstructionGeneral Contractor103/21/2026
Buildrite ContractingGeneral Contractor208/04/2021
Butch Ball ConstructionGeneral Contractor105/03/2000
RpeGeneral Contractor109/21/2012
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851212/23/2021
New Age Engineering7746110/01/2021
AR-Tech Engineering6659305/26/2021
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
06/03/2026
Boiler inspection report filed
Initial · no defects · Accepted
04/24/2026
Elevator Category 1 inspection report filed
04/17/2026
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN…
HPD violation · closed
04/17/2026
§ 27-2005 hmc: post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that…
HPD violation · closed
245 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offG. Bauer11/22/2021
DOB NOWBoiler EquipmentSigned-offAbilene10/07/2021
DOB NOWSidewalk ShedSigned-offJasco07/01/2021
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical05/12/2021
DOB NOWPlumbingSigned-offAdvanced Plumbing Mechanical11/04/2020
DOB NOWSidewalk ShedSigned-offJasco07/24/2020
BISOTISSUEDBuildrite Contracting08/04/2021
BISOTISSUEDBuildrite Contracting06/18/2021
BISOTISSUEDUK 2 Construction03/17/2021
BISOTISSUEDUK 2 Construction12/04/2020
BISOTISSUEDM Squared Contractors03/03/2020
BISOTISSUEDRpe09/21/2012
BISEQISSUEDSpring Enterpris10/31/2000
BISOTISSUEDButch Ball Construction05/03/2000
BISEQISSUEDSpring Enterpris02/17/2000
BISBLISSUEDAbilene12/27/1991
4 projects · most recent 10/14/2021
Boiler Controls General Wiring
FiledStatusContractorScope
10/14/2021Permit IssuedCounty Electrical Contractor IBoiler Controls
09/07/2021Permit IssuedAbilene Electric—
08/21/2020CompleteAll City ElectricalGeneral Wiring
08/14/2020CompleteRichard Neu—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
02/10/2022Pass-Final Boiler Equipment InspectionPassView ↗
12/27/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
12/23/2021Maintenance informationLOUIS ARENAenergy_progress
12/23/2021Heating SystemsLOUIS ARENAspecial
12/23/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
12/23/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
10/19/2021FinalSunil Saigalprogress
05/27/2021Fire-Resistant Penetrations and JointsALBERTO ROMANspecial
05/27/2021Fire-Resistance Rated ConstructionALBERTO ROMANprogress
05/27/2021Energy Code Compliance InspectionsALBERTO ROMANprogress
96 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account