← Back
BROOKLYN
1514 60 STREET
BROOKLYN · BIN 3430558
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Roof1 filing · 20 docs
Floor 7Under Construction2 filings · 20 docs
Floor 6Under Construction2 filings · 20 docs
Floor 51 filing · 20 docs
Floor 41 filing · 20 docs
Floor 3Under Construction2 filings · 20 docs
Floor 21 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1 filing · 20 docs
1 job · most recent 12/18/2024
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/18/2024Signed-offROYAL HOME IMPROVEMENTS IHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric PEFY-P96NMHSU-E 8 tons · Vrf Indoor ×34
PEFY-P72NMHSU-E 6 tons · Vrf Indoor ×24
PUHY - P288TSNU-A 288,000 BTU · Vrf Outdoor ×6
PUHY - P384TSNU-A 384,000 BTU · Vrf Outdoor ×6
SLZ-KF18NA 18 BTU · Vrf Indoor ×4
SUZ - KA18NA2 18,000 BTU · Condensing Unit ×4
PKA-A18LA 18,000 BTU · Split System ×2
PUHY - P432TSNU-A 432,000 BTU · Vrf Outdoor ×2
PUZ - A18NKA7 18,000 BTU · Condensing Unit ×2
Ventilation
Mitsubishi Electric LGH-F940RVX2-E 900 CFM · Erv ×14
LGH-F1200RVX2-E 1,200 CFM · Erv ×2
Greenheck G-240-VG 7,500 CFM · Exhaust Fan ×2
USF-08 500 CFM · Exhaust Fan ×2
1 job · most recent 12/18/2024
Sprinkler System
FiledStatusContractorScope
12/18/2024Signed-offSAFETY FIRE SPRINKLER CORSprinkler System
2 jobs · most recent 07/31/2025
Water/Sanitary Storm
FiledStatusContractorScope
07/31/2025Permit IssuedB&B MECH PLBG & HTG LLCWater/Sanitary
12/18/2024Signed-offB&B MECH PLBG & HTG LLCStorm, Water/Sanitary
1 job · most recent 06/05/2026
General Wiring
FiledStatusContractorScope
06/05/2026Permit IssuedCHARLES M. DWYER ELECTLGeneral Wiring
1 job · most recent 12/18/2024
Steel Concrete
FiledStatusContractorScope
12/18/2024Signed-offROYAL HOME IMPROVEMENTS ISteel, Concrete
Building Lifecycle
All (185)Filed (22)Permit Issued (15)Signed Off (10)Inspection (28)Objection (80)Special Inspection (30)
08/21/2026
Permit issued — Plumbing
B01244489-S1-PL
08/20/2026
Signed off — Alteration
Interior partition plan
B01244489-I1
05/14/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/13/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/03/2026
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/26/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
01/21/2026
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
12/15/2025
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
11/06/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/25/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
08/15/2025
Permit issued — Plumbing
B01244489-S1-PL
08/12/2025
Permit issued — General Construction
B01244489-I1-GC
08/07/2025
Objection resolved — Addressed
08/07/2025
Objection resolved — Addressed
08/06/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/05/2025
Objection resolved — Addressed
08/04/2025
Objection raised — Scope
08/04/2025
Objection raised — Admin
07/31/2025
Filed — Alteration
Interior partition plan
B01244489-S1
07/31/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
07/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
07/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
07/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
07/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
07/30/2025
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/29/2025
Objection resolved — Addressed
07/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/02/2025
Objection resolved — Addressed
06/30/2025
Objection raised — Zoning
06/30/2025
Objection raised — Fire_Protection
06/30/2025
Objection raised — Fire_Protection
06/30/2025
Objection raised — Scope
06/30/2025
Objection raised — Cost
06/30/2025
Objection raised — Scope
06/30/2025
Objection raised — Electrical
06/30/2025
Objection raised — Admin
06/30/2025
Objection raised — Scope
06/30/2025
Objection raised — Fire_Protection
06/30/2025
Objection raised — Fire_Protection
06/30/2025
Objection raised — Fire_Protection
06/30/2025
Objection raised — Fire_Protection
06/30/2025
Objection raised — Fire_Protection
06/30/2025
Objection raised — Fire_Protection
06/30/2025
Objection raised — Fire_Protection
06/30/2025
Objection raised — Fire_Protection
Latest 60 of 185 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1530 60TH MEMBER108/22/2026
▾Design Consultants (Architect / Engineer of Record)
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
B&B MECH PLBG & HTG LLCPlumbing108/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616107/31/2025
BGM ENGINEERING, LLC15141712/18/2024
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedB&B MECH PLBG & HTG LLC08/21/2026
DOB NOWPlumbingPermit IssuedTARGET PIPING NY LLC08/15/2025
DOB NOWGeneral ConstructionSigned-offROYAL HOME IMPROVEMENTS I08/12/2025
DOB NOWMechanical SystemsSigned-offROYAL HOME IMPROVEMENTS I10/10/2024
DOB NOWCurb CutSigned-offROYAL HOME IMPROVEMENTS I09/25/2024
DOB NOWCurb CutSigned-offROYAL HOME IMPROVEMENTS I09/25/2024
DOB NOWStructuralSigned-offROYAL HOME IMPROVEMENTS I08/16/2024
DOB NOWPlumbingSigned-offTARGET PIPING NY LLC01/08/2024
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP01/05/2024
DOB NOWStandpipeSigned-offSAFETY FIRE SPRINKLER CORP01/04/2024
DOB NOWGeneral ConstructionPermit IssuedROYAL HOME IMPROVEMENTS I12/22/2023
DOB NOWFoundationSigned-offROYAL HOME IMPROVEMENTS I07/28/2023
DOB NOWStructuralSigned-offROYAL HOME IMPROVEMENTS I07/26/2023
DOB NOWGeneral ConstructionPermit IssuedROYAL HOME IMPROVEMENTS I07/25/2023
DOB NOWSupport of ExcavationSigned-offROYAL HOME IMPROVEMENTS I06/06/2023
▾Field Inspections (DOB CAP) — 28
DateTypeResultReport
05/14/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/13/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/03/2026Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/26/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
01/21/2026Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/15/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
11/06/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/10/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/25/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
03/03/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2025Fail-Final CND-Occupancy InspectionFailView ↗
12/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/06/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
12/06/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/06/2024Pass-Final PL - UndergroundPassView ↗
12/04/2024Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
12/04/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
12/02/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
11/26/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
11/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/13/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
11/06/2024Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/23/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
Latest 25 of 28.
▾Special Inspection Requirements (DOB NOW) — 120
DateRequirementInspectorRole
07/31/2025Maintenance informationFAHAD FATEHenergy_progress
07/31/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
07/31/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
07/31/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
07/30/2025Energy Code Compliance InspectionsFAHAD FATEHprogress
07/30/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/20/2025FinalFAHAD FATEHprogress
12/31/2024VestibulesRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Electrical motors and elevatorsRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Interior lighting powerRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Maintenance informationRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024MeteringRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Fenestration areasRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Insulation placement and R valuesRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Exterior lighting powerRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Fenestration and door U-factor and product ratingsRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Air barrier - visual inspectionRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Air barrier — testing RAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Fenestration air leakageRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Fire-Resistance Rated ConstructionRAUL VELASQUEZ MARTINEZprogress
12/31/2024Lighting controlsRAUL VELASQUEZ MARTINEZenergy_progress
12/31/2024Energy Code Compliance InspectionsRAUL VELASQUEZ MARTINEZprogress
12/31/2024Exterior Insulation and Finish Systems (EIFS)RAUL VELASQUEZ MARTINEZspecial
12/31/2024Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
12/04/2024HVAC-R and service water piping design and insulationRAUL VELASQUEZ MARTINEZenergy_progress
Latest 25 of 120.
▾Documents — 133 on file (BIS + DOB NOW)
▸Plans & Drawings23
▸DOB NOWPlans/Sketch23
08/25/2026B00489174-A4Request digital key ↗
08/25/2026B00489174-S1Request digital key ↗
08/25/2026B00489174-S2Request digital key ↗
Showing 3 of 23 on file for this type
▸Zoning, Tax Lot & Property Records11
▸DOB NOWZoning Exhibit form (1-5)5
08/25/2026B00489174-P1Open ↗
08/15/2026B00489174-P3Open ↗
08/14/2026B00489174-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZD1: DOB Zoning Diagram5
08/25/2026B00489174-P4Open ↗
08/25/2026B00489174-P1Open ↗
08/14/2026B00489174-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00489174-I1Open ↗
▸Seals & Professional Certifications52
▸DOB NOWProgress Inspector Seal & Signature20
09/19/2026B00489174-P7Open ↗
09/19/2026B00489174-P7Open ↗
09/12/2026B00489174-S7Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/25/2026B00489174-S1Open ↗
08/25/2026B00489174-S2Open ↗
08/25/2026B00489174-S8Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature15
09/29/2026B00489174-P2Open ↗
09/19/2026B00489174-P7Open ↗
09/12/2026B00489174-S7Open ↗
Showing 3 of 15 on file for this type
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/25/2026B00489174-P1Open ↗
08/15/2026B00489174-P3Open ↗
08/14/2026B00489174-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/14/2026B00489174-I1—
▸Safety & Tenant Protection8
▸DOB NOWStreet Tree Checklist5
08/25/2026B00489174-P1Open ↗
08/15/2026B00489174-P3Open ↗
08/14/2026B00489174-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00489174-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00489174-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00489174-I1Open ↗
▸Environmental & Asbestos19
▸DOB NOWOER: Notice to Proceed13
08/25/2026B00489174-S8Open ↗
08/25/2026B00489174-S3Open ↗
08/25/2026B00489174-P1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/14/2026B00489174-I1Open ↗
08/13/2026B00489174-A5Open ↗
08/13/2026B00489174-S7Open ↗
Showing 3 of 6 on file for this type
▸Energy Compliance4
▸DOB NOWPreliminary Commissioning Report Certification3
08/13/2026B00489174-S3Open ↗
08/13/2026B00489174-S2Open ↗
08/13/2026B00489174-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00489174-I1Open ↗
▸Cost, Insurance & Ownership2
▸DOB NOWCertificate of Insurance1
08/13/2026B00489174-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00489174-I1Open ↗
▸Other Documents8
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/15/2026B00489174-P3Open ↗
08/14/2026B00489174-I1Open ↗
08/13/2026B00489174-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial1
08/25/2026B00489174-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00489174-S6Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00489174-I1Open ↗