ECB06/17/2011WORK W/O A PERMIT. NOTED: AT TIME OF INSPECTION WORK BEING DONE AT DETACHED 2 CAR GARAGE,REAR YARD,RIGHT SIDE OF PROPERTY. ON LEFT SIDE OF GARAGE INSTALLATION OF CERAMIC TILE FLOOR,NEW PLUMBING WORK FOR INSTALLNothing owed — awaiting certificate of correction
Two family converted from one family · 6,710 sf lot · 0.4 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.