1514 UNIONPORT ROAD · Parkchester · BIN 2096721
💬 Discuss this project
0Year Built
—Stories
R4Building Class
R6Zoning
2,409,161 sfGross Floor Area
3,378Units
Rent Stabilized1,659 Active Violations 1,653 unresolved · 6 paperwork only ▸FISP: SAFEFDNY Report ↗
Condo, residential unit in elevator building · Owner of record: Parkchester South Condominium Associates · 1,399,921 sf lot · 1.72 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRailing Installation3p · 1 filing · 7 docs
Floor 7Unit 7A, Unit 7B, Unit 7C +15p · 1 filing · 10 docs
Floor 6Unit 6E5p · 1 filing · 10 docs
Floor 5
Floor 4
Floor 3
Floor 2Unit 2F5p · 1 filing · 10 docs
Floor 1Building entry ADA ramp and vestibule replacementUnder Construction4p · 1 filing · 10 docs
Site & exteriorBuilding entry ADA ramp and vestibule replacementUnder Construction16p · 3 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Parkchester South Condo2007/08/2026
PPC Property Services203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Connolly Engineering306/26/2026
Rimkus New York109/02/2023
Lighthouse106/07/2018
Dooling & Company Architects105/25/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
AE Design Solution203/21/2026
HH Building Consulting & Architectu203/21/2026
Outsource Consultants303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Two-Tone ContractingGeneral Contractor308/05/2026
Alliance Elevator CompanyElectrical103/21/2026
Vinco BuildersGeneral Contractor104/09/2026
Pratt Construction & RestorationScaffold107/08/2026
Skyline RestorationScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Connolly Engineering, PLL3427306/26/2026
Outsource Special Inspection2827406/26/2026
Rimkus New York8123109/02/2023
Building Lifecycle
All (109)Filed (6)Permit Issued (5)Signed Off (3)Facade (FISP) (12)Violation (60)Objection (8)Special Inspection (15)
08/30/2026
Violation issued (HPD, open)
B
08/30/2026
Violation issued (HPD, open)
A
08/30/2026
Violation issued (HPD, open)
B
08/30/2026
Violation issued (HPD, open)
B
08/30/2026
Violation issued (HPD, open)
A
08/30/2026
Violation issued (HPD, open)
B
08/30/2026
Violation issued (HPD, open)
B
08/30/2026
Violation issued (HPD, open)
A
08/14/2026
Signed off — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE CEILING SLAB AT APT 2F, 6E,7A,7B,7C,7D,7E,7F,7G,7H &7TH FLR. PUBLIC HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCAN
X01154448-I1
08/04/2026
Permit issued — General Construction
X01360091-I1-GC-CX
06/26/2026
Filed — Alteration
Alterations to building entry as per ADA requirement including removal of stairs, installation of ADA ramp. Work to include removal & replacement of building entry vestibule as per plans filed herewith. No change in use, egress or occupancy.
X01360091-P1
06/16/2026
Special inspection requirement — Post-installed Anchors
daniel connolly
06/16/2026
Special inspection requirement — Concrete - Cast-In-Place
daniel connolly
06/16/2026
Special inspection requirement — Final
daniel connolly
06/16/2026
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
05/20/2026
Violation issued (HPD, closed)
C
05/05/2026
Violation issued (HPD, closed)
C
04/10/2026
Violation issued (HPD, closed)
A
04/10/2026
Violation issued (HPD, closed)
A
04/10/2026
Objection raised — Other
04/10/2026
Objection resolved — Resolved
03/27/2026
Filed — Alteration
Alterations to building entry as per ADA requirement including removal of stairs, installation of ADA ramp. Work to include removal & replacement of building entry vestibule as per plans filed herewith. No change in use, egress or occupancy.
X01360091-I1
02/04/2026
Permit issued — Structural
X01154448-I1-GC-CX
11/17/2025
Violation issued (HPD, closed)
I
06/18/2025
Violation issued (HPD, closed)
B
06/18/2025
Violation issued (HPD, closed)
A
04/14/2025
Filed — Alteration
THIS APPLICATION IS BEING FILED FOR STRUCTURAL WORK AT THE SUBJECT PREMISES FOR THE REPAIR OF THE UNDERSIDE INTERIOR OF THE CEILING SLAB AT APT 2F, 6E,7A,7B,7C,7D,7E,7F,7G,7H &7TH FLR. PUBLIC HALLWAY AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCAN
X01154448-I1
01/21/2025
Special inspection requirement — Structural Steel - Welding
daniel connolly
01/21/2025
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
01/21/2025
Special inspection requirement — Post-installed Anchors
daniel connolly
01/21/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
daniel connolly
01/21/2025
Special inspection requirement — Structural Steel - High Strength Bolting
daniel connolly
12/11/2024
Special inspection requirement — Structural Steel - Details
daniel connolly
12/11/2024
Special inspection requirement — Final
daniel connolly
07/25/2024
Signed off — Alteration
RAILING INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00916623-I1
07/24/2024
Cycle 9 facade report signed — SAFE
07/09/2024
Cycle 9 facade inspection completed
02/21/2024
Cycle 9 facade report submitted
11/13/2023
Violation issued (HPD, closed)
A
11/13/2023
Violation issued (HPD, closed)
A
11/13/2023
Violation issued (HPD, closed)
A
11/03/2023
Permit issued — General Construction
X00916623-I1-GC
09/11/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/11/2023
Objection resolved — Addressed
09/06/2023
Objection raised — Scope
09/06/2023
Objection raised — Other
09/06/2023
Objection raised — Other
09/02/2023
Filed — Alteration
RAILING INSTALLATION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
X00916623-I1
08/09/2023
Special inspection requirement — Final
JAMES MONAHAN
08/09/2023
Special inspection requirement — Post-installed Anchors
JAMES MONAHAN
08/09/2023
Special inspection requirement — Masonry
JAMES MONAHAN
08/09/2023
Special inspection requirement — Tenant Protection Plan Compliance
JONAR MADRIAGA
02/28/2023
Violation issued (FDNY_NOV, closed)
04/27/2022
Violation issued (HPD, closed)
C
03/29/2022
Violation issued (HPD, closed)
B
03/29/2022
Violation issued (HPD, closed)
B
03/29/2022
Violation issued (HPD, closed)
A
03/26/2022
Violation issued (HPD, closed)
B
03/26/2022
Violation issued (HPD, closed)
B
Latest 60 of 109 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedTwo-Tone Contracting08/04/2026
DOB NOWStructuralSigned-offVinco Builders02/04/2026
DOB NOWGeneral ConstructionSigned-offTwo-Tone Contracting11/03/2023
DOB NOWSidewalk ShedSigned-offPratt Construction & Res*06/07/2018
DOB NOWSupported ScaffoldPermit IssuedSkyline Restoration05/26/2018
BISOTISSUEDSkyline Restoration07/23/2018
BISOTISSUEDUnited Restoration Services O12/08/2010
BISPLISSUEDNational Mechanical Services Plumbing09/01/2010
BISPLISSUEDNational Mechanical Services Plumbing09/01/2010
BISOTISSUEDHobo Construction Co01/27/2010
BISMHISSUEDNational Mechanical Services09/03/2009
BISPLISSUEDNational Mechanical Services Plumbing08/25/2009
BISOTISSUEDDNA Contracting08/01/2003
BISOTISSUEDP.P.C. Construction07/18/2001
BISOTISSUEDP.P.C. Construction01/25/2001
BISPLISSUEDBlueprint PLG01/24/2001
1 project · most recent 05/29/2018
FiledStatusContractorScope
05/29/2018CompleteSteven Farkas—
2 projects · most recent 06/26/2026
Concrete Steel
FiledStatusContractorScope
06/26/2026Permit IssuedTwo-Tone ContractingConcrete
04/14/2025Signed-offVinco BuildersSteel
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
06/16/2026Post-installed Anchorsdaniel connollyspecial
06/16/2026Concrete - Cast-In-Placedaniel connollyspecial
06/16/2026Finaldaniel connollyprogress
06/16/2026Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
01/21/2025Structural Steel - Weldingdaniel connollyspecial
01/21/2025Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
01/21/2025Post-installed Anchorsdaniel connollyspecial
01/21/2025Structural Stability – Alterations of existing buildingsdaniel connollyspecial
01/21/2025Structural Steel - High Strength Boltingdaniel connollyspecial
12/11/2024Structural Steel - Detailsdaniel connollyspecial
12/11/2024Finaldaniel connollyprogress
08/09/2023FinalJAMES MONAHANprogress
08/09/2023Post-installed AnchorsJAMES MONAHANspecial
08/09/2023MasonryJAMES MONAHANspecial
08/09/2023Tenant Protection Plan ComplianceJONAR MADRIAGAspecial
▾Documents — 109 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026X00037849-I1Request digital key ↗
08/26/2026X00050982-I1Request digital key ↗
08/22/2026X00916623-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION8
07/25/2018220646246Open ↗
12/10/2010220092913Open ↗
12/06/2010220095527Open ↗
Showing 3 of 8 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
03/27/2019220646246Open ↗
05/25/2018220646246Open ↗
12/06/2010220095527Open ↗
Showing 3 of 6 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
10/25/2011220095527Open ↗
▸Seals & Professional Certifications38
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026X01360091-P1Open ↗
09/01/2026X01360091-P1Open ↗
09/01/2026X01360091-P1Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION9
05/15/2019220646246Open ↗
07/25/2018220646246Open ↗
05/25/2018220646246Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026X00037849-I1Open ↗
08/26/2026X00050982-I1Open ↗
08/22/2026X00916623-I1Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
12/06/2010220095527Open ↗
11/19/2010220092913Open ↗
01/29/2010220046420Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
12/06/2010220095527Open ↗
11/19/2010220092913Open ↗
01/29/2010220046420Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026X01360091-P1Open ↗
08/25/2026X00916623-I1Open ↗
08/23/2026X01154448-I1Open ↗
▸Trade Schedules & Equipment6
▸BISSELF-CERT PLUMBING NOTICE5
09/30/2010220024710Open ↗
09/30/2010220024710Open ↗
09/27/2010220024710Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING1
08/25/2009220024710Open ↗
▸Safety & Tenant Protection2
▸BISTenant Protection Plan and Notes2
07/24/2018220646246Open ↗
05/25/2018220646246Open ↗
▸Environmental & Asbestos10
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/26/2026X00037849-I1Open ↗
08/22/2026X00916623-I1Open ↗
08/17/2026X01360091-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
12/06/2010220095527Open ↗
01/29/2010220046420Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
11/19/2010220092913Open ↗
08/25/2009220024710Open ↗
▸BISDEP ASBESTOS PROJECT COMPLETION FORM1
07/24/2018220646246Open ↗
▸Energy Compliance6
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
05/15/2019220646246Open ↗
07/25/2018220646246Open ↗
05/25/2018220646246Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS2
05/15/2019220646246Open ↗
02/12/2013220092913Open ↗
▸Approvals, Objections & Sign-offs11
▸BISADMINISTRATIVE OBJECTIONS4
12/06/2010220095527Open ↗
11/19/2010220092913Open ↗
01/29/2010220046420Open ↗
Showing 3 of 4 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
05/15/2019220646246Open ↗
02/12/2013220092913Open ↗
06/19/2012220092913Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
07/24/2018220646246Open ↗
05/25/2018220646246Open ↗
05/25/2018220646246Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
05/15/2019220646246Open ↗
03/27/2019220646246Open ↗
05/25/2018220646246Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms7
▸BISEFILING COVER SHEET5
05/25/2018220646246Open ↗
12/06/2010220095527Open ↗
11/19/2010220092913Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM1
05/15/2019220646246Open ↗
▸BISADDITIONAL INFORMATION1
05/25/2018220646246Open ↗