← Back
BuildNYC
Two stories - detached, small or mid-size
1515 NEW YORK AVENUE
BROOKLYN · BIN 3114075
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R6Zoning
1,625 sfGross Floor Area
1Units
3 Active Violations 0 unresolved · 3 paperwork only ▸FDNY Report ↗
Two stories - detached, small or mid-size · Owner of record: BS 1515 NY Ave · 4,000 sf lot · 0.41 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofUnder Construction16p · 1 filing · 20 docs
BulkheadUnder Construction3p · 1 filing · 20 docs
Floor 6Unit 6A, Unit 6B, Unit 6CUnder Construction16p · 1 filing · 20 docs
Floor 5Under Construction52p · 1 filing · 20 docs
Floor 4Under Construction50p · 1 filing · 20 docs
Floor 3Unit 3A, Unit 3B, Unit 3C +1Under Construction53p · 1 filing · 20 docs
Floor 2Unit 2A, Unit 2B, Unit 2C +1Under Construction16p · 1 filing · 20 docs
Floor 1Unit 1A, Unit 1B, Unit 1C +1Under Construction53p · 1 filing · 20 docs
CellarUnder Construction15p · 1 filing · 20 docs
Site & exteriorHeavy duty sidewalk shed installationUnder Construction42p · 7 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Black Steel Developers2410/30/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/04/2025$1.2M—Private party → BS 1515 NY AVE LLC$738/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Ashraf311/20/2026
Always Fast Services310/27/2026
Structural Engineering Technologies402/11/2026
Vasilios Artemiou PE212/10/2025
Lester Katz, Ncarb109/10/2025
Mje Professional Services108/11/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Expediter Group1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MJH ConstructionGeneral Contractor710/30/2026
MNK EnterprisesScaffold411/13/2026
J & G Construction ServicesScaffold208/14/2026
MJH ConstructionScaffold107/17/2026
MJH Constructionspecialty_contractor110/27/2026
B&B Mechanical Plumbing & HeatingPlumbing107/31/2026
Forsure Electric NYElectrical103/22/2026
Target Piping NYFire Protection107/31/2026
Ace Maintenance USAGeneral Contractor107/08/2026
Ace Maintenance USAScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616102/11/2026
Building Consulting Engineering1034601/27/2026
Building Lifecycle
12/01/2026
485-x construction completed
11/20/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01448060-P1
11/13/2026
Permit renewed — Sidewalk Shed
Renewed with changes
B01447402-I1-SH
11/11/2026
Permit expired, never signed off — Sidewalk Shed
The city's record still shows this permit as issued, with no sign-off on its filing
B01422997-I1-SH
10/29/2026
Permit renewed — General Construction
Renewed without changes
B01280057-I1-GC
96 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises11/13/2026
DOB NOWGeneral ConstructionPermit IssuedMJH Construction10/29/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedMNK Enterprises10/27/2026
DOB NOWMechanical SystemsPermit IssuedMJH Construction10/26/2026
DOB NOWGeneral ConstructionPermit IssuedMJH Construction10/19/2026
DOB NOWStructuralPermit IssuedMJH Construction10/16/2026
DOB NOWSidewalk ShedPermit IssuedMNK Enterprises08/25/2026
DOB NOWSupported ScaffoldPermit IssuedMNK Enterprises08/21/2026
DOB NOWEarth WorkPermit IssuedMJH Construction08/14/2026
DOB NOWSidewalk ShedPermit IssuedJ & G Construction Services08/13/2026
DOB NOWSupported ScaffoldPermit IssuedJ & G Construction Services08/07/2026
DOB NOWSprinklersPermit IssuedTarget Piping NY07/30/2026
DOB NOWPlumbingPermit IssuedB&B Mechanical Plumbing & Heating07/30/2026
DOB NOWStructuralPermit IssuedMJH Construction07/20/2026
DOB NOWFoundationPermit IssuedMJH Construction07/17/2026
DOB NOWSupport of ExcavationPermit IssuedMJH Construction07/16/2026
DOB NOWConstruction FencePermit IssuedMJH Construction07/16/2026
DOB NOWFull DemolitionSigned-offAce Maintenance USA09/09/2025
DOB NOWConstruction FencePermit IssuedAce Maintenance USA08/11/2025
1 project · most recent 02/11/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
02/11/2026Permit IssuedMJH ConstructionHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 02/11/2026
Sprinkler System
FiledStatusContractorScope
02/11/2026Permit IssuedTarget Piping NYSprinkler System
1 project · most recent 02/11/2026
Storm Water/Sanitary
FiledStatusContractorScope
02/11/2026Permit IssuedTarget Piping NYStorm, Water/Sanitary
4 projects · most recent 08/24/2026
General Wiring
FiledStatusContractorScope
08/24/2026Permit IssuedRichard Neu—
08/11/2026Permit IssuedPower Direct ElectricGeneral Wiring
06/26/2026Permit IssuedRichard Neu—
12/16/2025Permit IssuedForsure Electric NYGeneral Wiring
1 project · most recent 02/11/2026
Concrete
FiledStatusContractorScope
02/11/2026Permit IssuedMJH ConstructionConcrete
3 projects · most recent 08/13/2026
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
08/13/2026Permit IssuedJ & G Construction ServicesSidewalk Shed
08/07/2026Permit IssuedJ & G Construction ServicesScaffold
08/11/2025Permit IssuedMJH ConstructionFence
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
08/06/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/06/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 56
DateRequirementInspectorRole
02/05/2026Excavations - Sheeting, Shoring, and BracingSHAHRIAR QUAYYUMspecial
02/05/2026Subsurface Investigations (Borings/Test Pits)—special
02/05/2026Subsurface Conditions – Fill Placement & In-Place DensitySHAHRIAR QUAYYUMspecial
02/05/2026Subgrade InspectionsSHAHRIAR QUAYYUMspecial
02/05/2026Structural Steel - WeldingSHAHRIAR QUAYYUMspecial
02/05/2026Structural Steel - DetailsSHAHRIAR QUAYYUMspecial
02/05/2026Post-installed AnchorsSHAHRIAR QUAYYUMspecial
02/05/2026Concrete - Cast-In-PlaceSHAHRIAR QUAYYUMspecial
01/26/2026Construction Operations Influencing Adjacent StructuresTONY ONYEAGOROspecial
01/23/2026Subgrade InspectionsTONY ONYEAGOROspecial
01/23/2026Post-installed AnchorsTONY ONYEAGOROspecial
01/23/2026Concrete - Cast-In-PlaceTONY ONYEAGOROspecial
01/23/2026Subsurface Conditions – Fill Placement & In-Place DensityTONY ONYEAGOROspecial
01/23/2026Post-installed AnchorsTONY ONYEAGOROspecial
01/23/2026Concrete - Cast-In-PlaceTONY ONYEAGOROspecial
01/23/2026Subsurface Investigations (Borings/Test Pits)GEORGE CAMBOURAKISspecial
12/23/2025Post-installed AnchorsTONY ONYEAGOROspecial
12/23/2025Fire-Resistant Penetrations and JointsTONY ONYEAGOROspecial
12/23/2025Energy Code Compliance InspectionsTONY ONYEAGOROprogress
12/18/2025Fire-Resistant Penetrations and JointsTONY ONYEAGOROspecial
12/18/2025Post-installed AnchorsTONY ONYEAGOROspecial
12/18/2025Energy Code Compliance InspectionsTONY ONYEAGOROprogress
12/08/2025Duct leakage testing, insulation and designSHAHRIAR QUAYYUMenergy_progress
12/08/2025HVAC-R and service water heating equipmentTONY ONYEAGOROenergy_progress
12/08/2025HVAC-R and service water piping design and insulationTONY ONYEAGOROenergy_progress
Latest 25 of 56.
70 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account