← Back
BuildNYC
Over six families without stores
1515 SELWYN AVENUE
BRONX · BIN 2007821
💬 Discuss this project
1928Year Built
6Stories
C1Building Class
R7-1Zoning
42,370 sfGross Floor Area
48Units
LL97 CoveredRent Stabilized140 Active Violations 124 unresolved · 16 paperwork only 11 old, status unconfirmed ▸
Over six families without stores · Owner of record: 34 Lyncrest · 12,616 sf lot · 3.36 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 4Unit 4A6p · 1 filing · 13 docs
Floor 3Unit 3A6p · 1 filing · 13 docs
Floor 2
Floor 1
Cellar7p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
MK Realty Group1003/22/2026
Superior Apartments503/21/2026
34 Lyncrest203/22/2026
NYC Department of Housing Preservation and Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company312/04/2020
Thomas J. Curro Architect208/03/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Enkay Design Consulting403/21/2026
New York & Company303/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Alafogiannis Plumbing & HeatingPlumbing507/08/2026
Amb ContractorsGeneral Contractor103/21/2026
MCP RestorationGeneral Contractor103/21/2026
Shaker ContractorsGeneral Contractor103/21/2026
L J Electrical ServiceElectrical103/22/2026
Ips PlumbingPlumbing110/30/2013
Mark ConstructionGeneral Contractor107/29/2003
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851109/18/2020
Thomas J. Curro Architect718208/03/2020
Building Lifecycle
09/21/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/18/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL, SOUTH WALL. NORTH WALL AND WEST…
HPD violation · closed
05/18/2026
§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT RECEPTACLES ON SOUTH AND EAST WALL IN THE 3rd ROOM…
HPD violation · closed
05/18/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RECEPTACLE COVERS AT SOUTH AND EAST WALL IN THE 3rd ROOM FROM EAST AT SOUTH…
HPD violation · closed
02/13/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR FRAME IN THE ENTRANCE LOCATED AT APT BR, 1st APARTMENT FROM SOUTH AT WEST
HPD violation · closed
220 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedAlafogiannis Plumbing & Heating01/13/2021
DOB NOWPlumbingPermit IssuedAlafogiannis Plumbing & Heating09/03/2020
DOB NOWPlumbingSigned-offAlafogiannis Plumbing & Heating07/01/2020
BISOTISSUEDShaker Contractors01/16/2020
BISOTISSUEDShaker Contractors06/28/2019
BIS—ISSUEDShaker Contractors05/28/2019
BISOTISSUEDAmb Contractors03/30/2017
BISPLISSUEDIps Plumbing10/30/2013
BISOTISSUEDM.C.P. Restoration03/28/2011
BISEQISSUEDMark Construction07/29/2003
4 projects · most recent 07/27/2020
General Wiring
FiledStatusContractorScope
07/27/2020CompleteRND ElectricGeneral Wiring
10/02/2019Permit IssuedL J Electrical ServiceGeneral Wiring
09/20/2019Permit IssuedL J Electrical ServiceGeneral Wiring
09/19/2018Permit IssuedL J Electrical ServiceGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
09/22/2020Energy Code Compliance InspectionsLOUIS ARENAprogress
09/18/2020Maintenance informationLOUIS ARENAenergy_progress
09/18/2020HVAC and service water heating system controls LOUIS ARENAenergy_progress
09/18/2020HVAC and service water heating equipment LOUIS ARENAenergy_progress
09/10/2020Fuel-Oil Storage and Fuel-Oil Piping SystemsLOUIS ARENAspecial
09/10/2020Heating SystemsLOUIS ARENAspecial
08/03/2020Fire-Resistant Penetrations and JointsTHOMAS CURROspecial
08/03/2020Fire-Resistance Rated ConstructionTHOMAS CURROprogress
08/03/2020Energy Code Compliance InspectionsTHOMAS CURROprogress
08/03/2020Maintenance informationTHOMAS CURROenergy_progress
129 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account