← Back
BuildNYC
Walk-up cooperative
1516 BEDFORD AVENUE
BROOKLYN · BIN 3032181
💬 Discuss this project
1931Year Built
4Stories
C6Building Class
R6AZoning
8,932 sfGross Floor Area
16Units
Rent Stabilized16 Active Violations ▸FDNY Report ↗
Walk-up cooperative · Owner of record: 1516 Bedford Apts · 3,177 sf lot · 2.81 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 4Interior renovation of existing apartments2p · 2 filings · 17 docs
Floor 3Interior renovation of existing apartments6p · 3 filings · 20 docs
Floor 2Interior renovation of existing apartments6p · 3 filings · 20 docs
Floor 1Unit 1A, Unit 1B6p · 3 filings · 20 docs
Cellar1p · 1 filing · 14 docs
Basement1p · 2 filings · 20 docs
Sub-Basement3p · 1 filing · 17 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC Department of Housing Preservation and Development303/21/2026
1516 Bedford Apts103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/22/2023$5.5M—1516 BEDFORD AVENUE, LLC → 1516 BEDFORD APTS LLC$618/sf building
11/12/2020$790K—Private party → 1516 BEDFORD AVENUE, LLC$88/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Versatile Engineering803/30/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Stonecore103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Village P & H NYPlumbing407/08/2026
Nationwide MechanicalPlumbing203/21/2026
BHB ConstructionGeneral Contractor103/21/2026
Volt 360 ElectricElectrical103/21/2026
Padma ContractingGeneral Contractor103/21/2026
Global General ConstructionGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BGM Engineering1514703/30/2022
Building Lifecycle
09/23/2026
Boiler inspection report filed
Initial · no defects · Accepted
05/01/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
02/16/2026
§27-2104(b) hmc post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the…
HPD violation · closed
12/07/2025
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM WEST AT NORTH
HPD violation · closed
12/07/2025
§ 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1D, 1st STORY, 1st APARTMENT FROM…
HPD violation · closed
242 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentPermit IssuedVillage P & H NY01/28/2022
DOB NOWPlumbingSigned-offVillage P & H NY01/25/2022
DOB NOWBoiler EquipmentSigned-offVillage P & H NY01/25/2022
DOB NOWGeneral ConstructionSigned-offGlobal General Construction07/14/2021
BISOTISSUEDPadma Contracting08/24/2015
BISOTISSUEDPadma Contracting08/24/2015
BISPLISSUEDNationwide Mechanical04/13/2015
BISOTISSUEDPadma Contracting08/22/2014
BISOTISSUEDPadma Contracting08/22/2014
BISPLISSUEDNationwide Mechanical04/11/2014
BISEQISSUEDB H & B Construction03/07/2014
BISOTISSUEDPadma Contracting03/07/2014
BISOTISSUEDPadma Contracting11/22/2013
BISEQISSUEDB H & B Construction11/12/2013
BISBLISSUEDPacific Energy01/31/2008
1 project · most recent 03/30/2022
Gas
FiledStatusContractorScope
03/30/2022Signed-offVillage P & H NYGas
4 projects · most recent 09/13/2022
General Wiring
FiledStatusContractorScope
09/13/2022CompleteVolt 360 ElectricGeneral Wiring
06/23/2021Permit IssuedSega ElectricGeneral Wiring
06/18/2021Permit IssuedSega ElectricGeneral Wiring
03/25/2021Permit IssuedSega ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
08/29/2022Pass-Final General Construction Non-Directive 14PassView ↗
04/07/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/04/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/28/2022Pass-Final Boiler Equipment InspectionPassView ↗
03/09/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/31/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
04/06/2022Maintenance informationJOSEPH BADINTERenergy_progress
04/06/2022Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
04/06/2022Heating SystemsRAUL VELASQUEZ MARTINEZspecial
04/01/2022Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
03/22/2022Maintenance informationJOSEPH BADINTERenergy_progress
03/22/2022Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
03/22/2022Heating SystemsRAUL VELASQUEZ MARTINEZspecial
03/11/2022Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
12/30/2021Heating SystemsRAUL VELASQUEZ MARTINEZspecial
12/30/2021Fire-Resistant Penetrations and JointsRAUL VELASQUEZ MARTINEZspecial
96 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account