← Back
Four families
1516 GREENE AVENUE
BROOKLYN · Bushwick (West) · BIN 3075534
💬 Discuss this project
1931Year Built
3Stories
C3Building Class
R6Zoning
4,200 sfGross Floor Area
4Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Four families · 3,267 sf lot · 1.29 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
PenthouseUnder Construction42p · 1 filing · 20 docs
Floor 4Under Construction40p · 1 filing · 20 docs
Floor 3Under Construction42p · 1 filing · 20 docs
Floor 2Under Construction42p · 1 filing · 20 docs
Floor 1Under Construction41p · 1 filing · 20 docs
CellarUnder Construction41p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
429 E 121309/13/2026
TITAN SERVICES USA509/13/2026
267 KOSCIUSZKO507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/02/2025$2.0M—Private party → 1516 GREENE LLC$470/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FL&M ENGINEERING DESIGN &INSPECTION208/21/2026
KUSHNER STUDIOS204/22/2026
HANSEN ENGINEERING, PC604/20/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
KUSHNER STUDIOS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CONSTRUCTION XPERT INCGeneral Contractor407/08/2026
TITAN SERVICES USA INCGeneral Contractor408/25/2026
VILLAGE P & H NY INCFire Protection107/08/2026
VILLAGE P & H NY INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHUN ENGINEERING CONSULTA9605804/22/2026
Building Lifecycle
All (117)Filed (10)Permit Issued (10)Violation (16)Inspection (3)Objection (48)Special Inspection (30)
08/24/2026
Permit issued — Sidewalk Shed
B01442651-I1-SH
08/24/2026
Permit issued — Supported Scaffold
B01442651-I1-SF
08/24/2026
Permit issued — Supported Scaffold
B01092146-S5-SH
08/24/2026
Permit issued — Supported Scaffold
B01092146-S5-SF
08/21/2026
Filed — Alteration
INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01442651-I1
08/11/2026
Filed — Alteration CO
INSTALLATION OF NEW SPLIT HVAC SYSTEMS & BATHROOM EXHAUSTS AS SHOWN ON THE DRAWINGS FILED HEREIN.
B01092146-S5
08/04/2026
Violation issued (ECB, open)
Construction
08/04/2026
Violation issued (ECB, open)
Unknown
08/04/2026
Violation issued (ECB, open)
Construction
08/04/2026
Violation issued (ECB, open)
Construction
06/16/2026
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
06/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
06/11/2026
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
05/01/2026
Permit issued — Mechanical Systems
B01092146-S2-MS
04/30/2026
Permit issued — Sprinklers
B01092146-S4-EW-SP
04/23/2026
Special inspection requirement — Mastic and Intumescent Fire-resistant Coatings
04/23/2026
Special inspection requirement — Lighting in dwelling units
JAMES CHUN
04/23/2026
Special inspection requirement — Air barrier - visual inspection
JAMES CHUN
04/23/2026
Special inspection requirement — Fenestration areas
JAMES CHUN
04/23/2026
Special inspection requirement — Insulation placement and R values
JAMES CHUN
04/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
JAMES CHUN
04/23/2026
Special inspection requirement — Fenestration air leakage
JAMES CHUN
04/23/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
04/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
JAMES CHUN
04/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
JAMES CHUN
04/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
04/22/2026
Filed — Alteration CO
INSTALLATION OF NEW SPLIT HVAC SYSTEMS & BATHROOM EXHAUSTS AS SHOWN ON THE DRAWINGS FILED HEREIN.
B01092146-P1
04/20/2026
Filed — Alteration CO
INSTALLATION OF NEW SPLIT HVAC SYSTEMS & BATHROOM EXHAUSTS AS SHOWN ON THE DRAWINGS FILED HEREIN.
B01092146-P3
04/20/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
04/20/2026
Special inspection requirement — Maintenance information
JAMES CHUN
04/20/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES CHUN
04/20/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES CHUN
04/20/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES CHUN
04/20/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
04/20/2026
Special inspection requirement — Final
Cloud Lee
04/20/2026
Special inspection requirement — Mechanical Systems
JAMES CHUN
04/17/2026
Permit issued — General Construction
B01092146-I1-GC
04/16/2026
Permit issued — Plumbing
B01092146-S1-PL
04/15/2026
Filed — Alteration CO
INSTALLATION OF NEW SPLIT HVAC SYSTEMS & BATHROOM EXHAUSTS AS SHOWN ON THE DRAWINGS FILED HEREIN.
B01092146-S4
04/15/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
04/15/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
04/15/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES CHUN
04/15/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES CHUN
04/15/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
JAMES CHUN
04/15/2026
Special inspection requirement — Maintenance information
JAMES CHUN
04/14/2026
Filed — Alteration CO
INSTALLATION OF NEW SPLIT HVAC SYSTEMS & BATHROOM EXHAUSTS AS SHOWN ON THE DRAWINGS FILED HEREIN.
B01092146-P2
04/14/2026
Objection raised — Cost
04/14/2026
Objection resolved — Addressed
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
JAMES CHUN
04/14/2026
Special inspection requirement — Energy Code Compliance Inspections
JAMES CHUN
04/14/2026
Special inspection requirement — HVAC-R and service water heating equipment
JAMES CHUN
04/14/2026
Special inspection requirement — HVAC-R and service water heating system controls
JAMES CHUN
04/14/2026
Special inspection requirement — Maintenance information
JAMES CHUN
04/01/2026
Permit issued — Structural
B01092146-S3-ST
03/20/2026
Objection resolved — Addressed
03/19/2026
Objection resolved — Addressed
03/13/2026
Permit issued — General Construction
B01092146-I1-GC
03/12/2026
Filed — Alteration CO
INSTALLATION OF NEW SPLIT HVAC SYSTEMS & BATHROOM EXHAUSTS AS SHOWN ON THE DRAWINGS FILED HEREIN.
B01092146-S3
03/12/2026
Objection raised — Energy
03/09/2026
Filed — Alteration CO
INSTALLATION OF NEW SPLIT HVAC SYSTEMS & BATHROOM EXHAUSTS AS SHOWN ON THE DRAWINGS FILED HEREIN.
B01092146-S1
Latest 60 of 117 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedTITAN SERVICES USA INC08/24/2026
DOB NOWSupported ScaffoldPermit IssuedTITAN SERVICES USA INC08/24/2026
DOB NOWSupported ScaffoldPermit IssuedTITAN SERVICES USA INC08/24/2026
DOB NOWSupported ScaffoldPermit IssuedTITAN SERVICES USA INC08/24/2026
DOB NOWMechanical SystemsPermit IssuedCONSTRUCTION XPERT INC05/01/2026
DOB NOWSprinklersPermit IssuedVILLAGE P & H NY INC04/30/2026
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION XPERT INC04/17/2026
DOB NOWPlumbingPermit IssuedVILLAGE P & H NY INC04/16/2026
DOB NOWStructuralPermit IssuedCONSTRUCTION XPERT INC04/01/2026
DOB NOWGeneral ConstructionPermit IssuedCONSTRUCTION XPERT INC03/13/2026
1 project · most recent 08/11/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
08/11/2026Permit IssuedTITAN SERVICES USA INCHeating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 08/11/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/11/2026Permit IssuedPARAMOUNT SERVICES, LLCGas, Storm, Water/Sanitary
4 projects · most recent 08/07/2026
General Wiring
FiledStatusContractorScope
08/07/2026Permit IssuedHIGH QUALITY ELEC.OF NYC—
05/19/2026Permit IssuedBLU ELECTRICAL SVS INC5 meters
03/23/2026Permit IssuedBLU ELECTRICAL SVS INCGeneral Wiring
12/25/2025Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
1 project · most recent 08/11/2026
FiledStatusContractorScope
08/11/2026Permit IssuedTITAN SERVICES USA INC1 scope_items
1 project · most recent 08/11/2026
Scaffold Sidewalk Shed
FiledStatusContractorScope
08/11/2026Permit IssuedTITAN SERVICES USA INCScaffold, Sidewalk Shed
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
06/16/2026Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
06/16/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
06/11/2026Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 50
DateRequirementInspectorRole
04/23/2026Mastic and Intumescent Fire-resistant Coatings—special
04/23/2026Lighting in dwelling unitsJAMES CHUNenergy_progress
04/23/2026Air barrier - visual inspectionJAMES CHUNenergy_progress
04/23/2026Fenestration areasJAMES CHUNenergy_progress
04/23/2026Insulation placement and R valuesJAMES CHUNenergy_progress
04/23/2026Fenestration and door U-factor and product ratingsJAMES CHUNenergy_progress
04/23/2026Fenestration air leakageJAMES CHUNenergy_progress
04/23/2026Energy Code Compliance InspectionsJAMES CHUNprogress
04/23/2026Fire-Resistance Rated ConstructionJAMES CHUNprogress
04/23/2026Structural Stability – Alterations of existing buildingsJAMES CHUNspecial
04/23/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
04/20/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
04/20/2026Maintenance informationJAMES CHUNenergy_progress
04/20/2026HVAC-R and service water heating equipmentJAMES CHUNenergy_progress
04/20/2026HVAC-R and service water piping design and insulationJAMES CHUNenergy_progress
04/20/2026HVAC-R and service water heating system controlsJAMES CHUNenergy_progress
04/20/2026Energy Code Compliance InspectionsJAMES CHUNprogress
04/20/2026FinalCloud Leeprogress
04/20/2026Mechanical SystemsJAMES CHUNspecial
04/15/2026Fire-Resistant Penetrations and JointsJAMES CHUNspecial
04/15/2026Energy Code Compliance InspectionsJAMES CHUNprogress
04/15/2026HVAC-R and service water heating system controlsJAMES CHUNenergy_progress
04/15/2026HVAC-R and service water heating equipmentJAMES CHUNenergy_progress
04/15/2026HVAC-R and service water piping design and insulationJAMES CHUNenergy_progress
04/15/2026Maintenance informationJAMES CHUNenergy_progress
Latest 25 of 50.
▾Documents — 87 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
08/22/2026B01442651-I1Request digital key ↗
08/17/2026B01092146-P1Request digital key ↗
08/17/2026B01092146-P3Request digital key ↗
Showing 3 of 10 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B01092146-P1Open ↗
08/13/2026B01092146-I1Open ↗
▸Seals & Professional Certifications53
▸DOB NOWProgress Inspector Seal & Signature27
09/11/2026B01092146-P1Open ↗
09/11/2026B01092146-P1Open ↗
09/11/2026B01092146-P1Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature14
09/11/2026B01092146-P1Open ↗
09/11/2026B01092146-P1Open ↗
08/29/2026B01092146-S3Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/22/2026B01442651-I1Open ↗
08/17/2026B01092146-P1Open ↗
08/17/2026B01092146-P2Open ↗
Showing 3 of 12 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B01092146-I1Open ↗
08/13/2026B01092146-P1Open ↗
▸Environmental & Asbestos11
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/17/2026B01092146-P1Open ↗
08/17/2026B01092146-S1Open ↗
08/17/2026B01092146-S4Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Completion Form2
08/13/2026B01092146-S1Open ↗
08/13/2026B01092146-S2Open ↗
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form2
08/17/2026B01092146-S3Open ↗
08/13/2026B01092146-I1Open ↗
▸Other Documents9
▸DOB NOWProperty Ownership Certification2
08/13/2026B01092146-P1Open ↗
08/13/2026B01092146-I1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B01092146-I1Open ↗
08/13/2026B01092146-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B01092146-I1Open ↗
08/13/2026B01092146-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B01092146-P1Open ↗
08/13/2026B01092146-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B01092146-I1Open ↗