← Back
Two family brick
1517 PLIMPTON AVENUE
BRONX · BIN 2008791
💬 Discuss this project
1915Year Built
2Stories
B1Building Class
R7-1Zoning
2,360 sfGross Floor Area
2Units
Two family brick · 2,225 sf lot · 1.06 FAR built · Flood zone X
Locations of Work
Plumbing
Cellar2p · 1 filing · 6 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/21/2021$720K—— → Private party$305/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSE A. SANTOS P.E.P.C110/07/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JM ZONING, LLC.203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HT PLUMBING & HEATING CORPlumbing207/08/2026
JEFFREY MARINELLOElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE A SANTOS PE, PC3292110/07/2022
Building Lifecycle
All (21)Filed (1)Permit Issued (1)Signed Off (1)Inspection (2)Objection (10)Special Inspection (6)
05/02/2024
Signed off — Alteration
PROPOSE TO CAP & REMOVE AN EXISTING BOILER, REPLACE 2 EXISTING GAS METERS, INSTALLING 2 GAS LOW-PRESSURE WATER BOILERS & 2 GAS HOT WATER HEATERS AS PER PLANS SUBMITTED HEREWITH. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
X08014745-I1
10/03/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/03/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/09/2022
Permit issued — Plumbing
X08014745-I1-PL
10/13/2022
Objection raised — Scope
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection raised — Other
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection raised — Scope
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection raised — Other
10/13/2022
Objection resolved — Addressed
10/13/2022
Objection raised — Other
10/13/2022
Objection resolved — Addressed
10/07/2022
Filed — Alteration
PROPOSE TO CAP & REMOVE AN EXISTING BOILER, REPLACE 2 EXISTING GAS METERS, INSTALLING 2 GAS LOW-PRESSURE WATER BOILERS & 2 GAS HOT WATER HEATERS AS PER PLANS SUBMITTED HEREWITH. THERE SHALL BE NO CHANGE IN USE, OCCUPANCY, OR MEANS OF EGRESS.
X08014745-I1
10/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Santos
10/06/2022
Special inspection requirement — Energy Code Compliance Inspections
Jose Santos
10/06/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jose Santos
10/06/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jose Santos
10/06/2022
Special inspection requirement — Maintenance information
Jose Santos
10/06/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Santos
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offHT PLUMBING & HEATING COR12/09/2022
BISOTISSUEDPRO CUSTOM SOLAR LLC06/23/2023
1 project · most recent 06/30/2023
FiledStatusContractorScope
06/30/2023CompleteISLAND ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/03/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/03/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
10/06/2022Fire-Resistant Penetrations and JointsJose Santosspecial
10/06/2022Energy Code Compliance InspectionsJose Santosprogress
10/06/2022HVAC-R and service water heating system controlsJose Santosenergy_progress
10/06/2022HVAC-R and service water heating equipmentJose Santosenergy_progress
10/06/2022Maintenance informationJose Santosenergy_progress
10/06/2022HVAC-R and service water piping design and insulationJose Santosenergy_progress
▾Documents — 19 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/15/2026X08014745-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/20/2023240349468Open ↗
▸BISWORK PERMIT APPLICATION1
06/23/2023240349468Open ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature2
09/01/2026X08014745-I1Open ↗
09/01/2026X08014745-I1Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/20/2023240349468Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/20/2023240349468Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/23/2026X08014745-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026X08014745-I1Open ↗
▸Safety & Tenant Protection1
▸BISTPP1: TENANT PROTECTION PLAN1
06/20/2023240349468Open ↗
▸Environmental & Asbestos2
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
06/20/2023240349468Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/15/2026X08014745-I1Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
06/20/2023240349468Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
06/20/2023240349468Open ↗
▸BISPTA4: SOLAR TAX ABATEMENT APPLICATION (PRELIMINARY)1
06/20/2023240349468Open ↗
▸Inspections & Test Reports1
▸BISTECHNICAL REPORT: RESPONSIBILITY1
06/20/2023240349468Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
06/20/2023240349468Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
06/20/2023240349468Open ↗
▸BISADDITIONAL INFORMATION1
06/20/2023240349468Open ↗