← Back
BuildNYC
Three families
1518 RYDER STREET
BROOKLYN · BIN 3211979
💬 Discuss this project
1925Year Built
2Stories
C0Building Class
R3-2Zoning
2,240 sfGross Floor Area
3Units
Rent Stabilized0 Active Violations
Three families · Owner of record: 1518 Ryder · 2,500 sf lot · 0.9 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1518 Ryder103/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/02/2021$450K—Private party → 197 ST PARTNERS LLC$201/sf building
Building Lifecycle
All (12)Violation (12)
11/28/2023
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
11/17/2022
§27-2107 ADM code owner failed to file a valid registration statement with the department as required by ADM code §27-2097 and is therefore subject…
HPD violation · closed
01/15/2021
§ 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 1, 1st STORY
HPD violation · closed
01/15/2021
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 1, 1st…
HPD violation · closed
01/15/2021
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 6th ROOM FROM EAST AT NORTH LOCATED AT APT…
HPD violation · closed
01/15/2021
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY
HPD violation · closed
01/15/2021
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT…
HPD violation · closed
01/15/2021
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE KITCHEN LOCATED AT APT 1, 1st STORY
HPD violation · closed
01/15/2021
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1,…
HPD violation · closed
01/15/2021
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1, 1st…
HPD violation · closed
01/15/2021
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE PRIVATE HALLWAY LOCATED AT APT 1, 1st STORY
HPD violation · closed
01/15/2021
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 1, 1st STORY
HPD violation · closed
Nothing on file for this building.
1 project · most recent 07/28/2021
General Wiring
FiledStatusContractorScope
07/28/2021Permit IssuedRoyal Electrical ContractingGeneral Wiring
Nothing on file for this building.
Nothing on file for this building.