DOB05/20/2026CORRECTIVE ACTION PLAN REQ'D-OBSVD DETERIORATED CONCRETE SLAB WITH EXPOSED REBAR AT EXP1/2 CORNER.OWNER TO IMMED RETAIN REG DESIGN PROF IN GOOD STANDING WITH DOB&NYS TO EVAL ENTIRE BLDG AND SUBMIT A CORRECTIVE ACTION PLAN BY MAY 20 2026
Three families · 2,800 sf lot · 0.89 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.