ECB12/29/2017FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35152864H ISSUED ON 02/23/11 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. FOR WOKR W/O A PERMIT. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE$2K due
ECB11/08/2017FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35152864H ISSUED ON 02/23/17 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C OF C.$2K due
ECB08/04/2017WORK W/O A PERMIT. FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35152864H ISSUED ON 02/23/17 & TO FILE A C OF C PURSUANT TO28-201.1 & 1RCNY 102-01. AT CELLAR LEVEL,ERECTED FULL HEIGHT METAL FRA$800 due
DOB05/17/2017FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB02/23/2017WORK W/O PERMIT. NOTED: AT CELLAR LEVEL ERECTED FULL HEIGHT METAL STUDFRAMING ALONG PERIMETER OF CELLAR, ALSO CREATING 2 ROOMS INSTALLED WATER & WASTE LINES IN 1 ROOM,INSTALLED WATER & WASTE LINES NEAR WASHER &Nothing owed — awaiting certificate of correction
Two stories - detached, small or mid-size · 0.36 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.