← Back
Miscellaneous warehouse
152-32 ROCKAWAY BOULEVARD
💬 Discuss this project
1963Year Built
2Stories
E9Building Class
R3-1Zoning
16,023 sfGross Floor Area
8Units
7 Open Violations 1 unresolved · 6 paperwork only ▸FDNY Report ↗
Miscellaneous warehouse · Owner of record: MANSION HOMES, INC · 16,375 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
Architecture
Floor 11p · 1 filing · 12 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SOUTH HOMES INC.903/22/2026
MANSON HOMES INC1103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TABRIZ GROUP ENTERPRISES202/07/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
TABRIZ DESIGN GROUP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
J&J DESIGNS INCGeneral Contractor603/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TABRIZ GROUP ENTERPRISES3275202/07/2023
Building Lifecycle
All (45)Filed (2)Permit Issued (2)Signed Off (1)Violation (30)Special Inspection (10)
02/23/2023
Signed off — Alteration
JOB FILED TO CORRECT ILLEGAL CONDITIONS ON THE 1ST FLOOR OF EXISTING COMMERCIAL BUILDING: REMOVING ILLEGAL PARTITIONS, REMOVAL OF SPRAY BOOTH, NEW PROPOSED PARTITIONS, AND FILING FOR EXISTING MECHANICAL EQUIPMENT.
Q00721557-I1
02/22/2023
Permit issued — Structural
Q00721557-I1-ST
02/12/2023
Special inspection requirement — Mechanical Systems
BAKHTIAR SHAMLOO
02/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
02/12/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
02/12/2023
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
02/12/2023
Special inspection requirement — Final
HARI SONI
02/07/2023
Filed — Alteration
JOB FILED TO CORRECT ILLEGAL CONDITIONS ON THE 1ST FLOOR OF EXISTING COMMERCIAL BUILDING: REMOVING ILLEGAL PARTITIONS, REMOVAL OF SPRAY BOOTH, NEW PROPOSED PARTITIONS, AND FILING FOR EXISTING MECHANICAL EQUIPMENT.
Q00721557-P1
02/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
02/01/2023
Special inspection requirement — Mechanical Systems
BAKHTIAR SHAMLOO
02/01/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
BAKHTIAR SHAMLOO
02/01/2023
Special inspection requirement — Final
HARI SONI
02/01/2023
Special inspection requirement — Fire-Resistance Rated Construction
BAKHTIAR SHAMLOO
09/06/2022
Permit issued — Mechanical Systems
Q00721557-I1-GC-CX
04/28/2022
Filed — Alteration
JOB FILED TO CORRECT ILLEGAL CONDITIONS ON THE 1ST FLOOR OF EXISTING COMMERCIAL BUILDING: REMOVING ILLEGAL PARTITIONS, REMOVAL OF SPRAY BOOTH, NEW PROPOSED PARTITIONS, AND FILING FOR EXISTING MECHANICAL EQUIPMENT.
Q00721557-I1
03/04/2022
Violation issued (ECB, open)
Construction
12/27/2021
Violation issued (ECB, open)
Construction
12/27/2021
Violation issued (ECB, open)
Construction
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/24/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2021
Violation issued (ECB, open)
Construction
10/18/2021
Violation issued (ECB, open)
Construction
08/25/2021
Violation issued (ECB, closed)
Construction
08/25/2021
Violation issued (ECB, closed)
Construction
08/25/2021
Violation issued (ECB, closed)
Construction
08/25/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/07/2021
Violation issued (FDNY_NOV, closed)
02/04/2021
Violation issued (FDNY_NOV, closed)
11/01/2017
Violation issued (FDNY_NOV, closed)
11/01/2017
Violation issued (FDNY_NOV, closed)
11/01/2017
Violation issued (FDNY_NOV, closed)
08/31/2016
Violation issued (FDNY_NOV, closed)
06/22/2016
Violation issued (FDNY_NOV, closed)
06/02/2016
Violation issued (ECB, open)
Construction
05/24/2016
Violation issued (FDNY_NOV, closed)
09/02/2010
Violation issued (FDNY_NOV, closed)
01/12/2009
Violation issued (FDNY_NOV, closed)
07/21/2008
Violation issued (FDNY_NOV, closed)
03/24/2008
Violation issued (FDNY_NOV, closed)
03/24/2008
Violation issued (FDNY_NOV, closed)
01/03/2007
Violation issued (FDNY_NOV, closed)
07/25/2006
Violation issued (FDNY_NOV, closed)
01/27/2006
Violation issued (FDNY_NOV, closed)
03/22/1995
Violation issued (FDNY_NOV, closed)
11/15/1994
Violation issued (FDNY_NOV, closed)
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offJ&J DESIGNS INC02/22/2023
DOB NOWMechanical SystemsSigned-offJ&J DESIGNS INC09/06/2022
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
02/12/2023Mechanical SystemsBAKHTIAR SHAMLOOspecial
02/12/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
02/12/2023Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
02/12/2023Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
02/12/2023FinalHARI SONIprogress
02/01/2023Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
02/01/2023Mechanical SystemsBAKHTIAR SHAMLOOspecial
02/01/2023Structural Stability – Alterations of existing buildingsBAKHTIAR SHAMLOOspecial
02/01/2023FinalHARI SONIprogress
02/01/2023Fire-Resistance Rated ConstructionBAKHTIAR SHAMLOOprogress
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/26/2026Q00721557-P1Request digital key ↗
08/26/2026Q00721557-I1Request digital key ↗
▸Seals & Professional Certifications8
▸DOB NOWProgress Inspector Seal & Signature4
08/27/2026Q00721557-P1Open ↗
08/27/2026Q00721557-P1Open ↗
08/22/2026Q00721557-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/13/2026Q00721557-P1Open ↗
08/13/2026Q00721557-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/27/2026Q00721557-P1Open ↗
08/22/2026Q00721557-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/13/2026Q00721557-P1Open ↗
08/13/2026Q00721557-I1Open ↗