← Back
Condo, residential tower (mixed-use, multi-family elevator) [derived]
152 FRANKLIN STREET
MANHATTAN · BIN 1002131
💬 Discuss this project
1891Year Built
7Stories
RMBuilding Class
C6-2AZoning
24,144 sfGross Floor Area
6Units
LL97 CoveredRent Stabilized2 Open Violations ▸FISP: SAFEFDNY Report ↗
Condo, residential tower (mixed-use, multi-family elevator) [derived] · Owner of record: 152 FRANKLIN ST CONDO · 4,392 sf lot · 5.5 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Roof6p · 3 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 78p · 5 filings · 20 docs
Floor 66p · 4 filings · 20 docs
Floor 56p · 4 filings · 20 docs
Floor 46p · 4 filings · 20 docs
Floor 36p · 4 filings · 20 docs
Floor 26p · 4 filings · 20 docs
Floor 113p · 4 filings · 20 docs
Cellar18p · 3 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
401 GREENWICH2607/08/2026
BUCHBINDER 8 WARREN LLC103/22/2026
152 FRANKLIN ST CONDO1203/22/2026
152 FRANKLIN STREET CONDOMIN403/21/2026
152 FRANKLIN ST CONDO C O BUCHBI503/21/2026
FRANKLIN ST DEVELOPMENT303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JON LIBASCI RA603/21/2026
A1 EXPEDITING SERVICE CORP.203/21/2026
SYNERGY BUILDING CONSULTANTS103/21/2026
JM ZONING, LLC.3003/21/2026
AE DESIGN SOLUTION403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BE CONSTRUCTIVE LLCGeneral Contractor707/08/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/08/2026
POWERS BRIDGING & SCAFFOLDINGGeneral Contractor307/08/2026
SUMMIT DEVELOPMENT CORPGeneral Contractor307/08/2026
BHY CONTRACTOR INCGeneral Contractor203/21/2026
B.O.S.S. ASSOCIATES, INCGeneral Contractor203/21/2026
DNA PLUMBING CONTR. INCFire Protection107/08/2026
COTTAM HEATING & AIR CONDIT.General Contractor104/09/2026
DUTCHESS CABINETS OF NY *General Contractor104/09/2026
A & A PLUMBING SYSTEMS INPlumbing107/08/2026
ALMONTE JR, EMILIOElectrical103/21/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
JOHNSON, JElectrical103/21/2026
MAZZA, JOHNElectrical103/21/2026
MONFORTE ELECTIRC CORPElectrical103/22/2026
OLLEN, MATTHEWElectrical103/21/2026
WARREN OSTROFFElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
APPLIED HVAC ENGINEERING,7563201/28/2026
MILROSE CONSULTANTS LLC2003112/18/2025
INTEGRITY CONSULTING SERV6661308/27/2024
LUKE LICALZI P.E.,P.C.3679303/06/2024
Building Lifecycle
All (235)Filed (25)Permit Issued (17)Signed Off (11)Facade (FISP) (24)Violation (39)Inspection (15)Objection (74)Special Inspection (30)
02/03/2026
Signed off — Alteration
Removal of existing Mechanical units from penthouse rooftop terrace and installation of new system.
M01323149-I1
01/30/2026
Special inspection requirement — Mechanical Systems
Alexandra Herrera
01/30/2026
Special inspection requirement — Final
Alexandra Herrera
01/28/2026
Filed — Alteration
Removal of existing Mechanical units from penthouse rooftop terrace and installation of new system.
M01323149-P1
01/28/2026
Signed off — Alteration
Rooftop steel dunnage alterations to support (2) mechanical units, maintenance platform, and applicable railings/ ladder.
M01323150-I1
01/23/2026
Special inspection requirement — Mechanical Systems
Alexandra Herrera
01/23/2026
Special inspection requirement — Final
Alexandra Herrera
01/05/2026
Permit issued — Structural
M01323150-I1-ST
12/18/2025
Filed — Alteration
Rooftop steel dunnage alterations to support (2) mechanical units, maintenance platform, and applicable railings/ ladder.
M01323150-I1
12/11/2025
Permit issued — Mechanical Systems
M01323149-I1-MS
12/01/2025
Filed — Alteration
Removal of existing Mechanical units from penthouse rooftop terrace and installation of new system.
M01323149-I1
11/21/2025
Special inspection requirement — Final
Christopher Drutjons
11/21/2025
Special inspection requirement — Structural Steel - Details
Christopher Drutjons
09/25/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
05/28/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/12/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
11/29/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
11/29/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
09/06/2024
Cycle 9 facade report signed — SAFE
08/27/2024
Filed — Alteration CO
STRUCTURAL WORK FILED IN CONJUNCTION WITH CHANGE OF USE IN CEL AND RENOVATION OF 1ST FLOOR. ENLARGED STAIR CASE PROPOSED.
M00642378-P8
08/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
08/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
08/14/2024
Cycle 9 facade inspection completed
07/02/2024
Filed — Alteration CO
STRUCTURAL WORK FILED IN CONJUNCTION WITH CHANGE OF USE IN CEL AND RENOVATION OF 1ST FLOOR. ENLARGED STAIR CASE PROPOSED.
M00642378-P7
06/28/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
06/28/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
06/11/2024
Signed off — Alteration
alteration filed for mechanical work in conjunction with tenant fit-out at cellar and first floor
M00903824-S3
06/11/2024
Signed off — Alteration
alteration filed for mechanical work in conjunction with tenant fit-out at cellar and first floor
M00903824-I1
06/11/2024
Signed off — Alteration
alteration filed for mechanical work in conjunction with tenant fit-out at cellar and first floor
M00903824-S1
06/11/2024
Signed off — Alteration
alteration filed for mechanical work in conjunction with tenant fit-out at cellar and first floor
M00903824-S2
05/08/2024
Signed off — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00855745-I1
04/30/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
04/08/2024
Violation issued (ECB, closed)
Construction
04/05/2024
Filed — Alteration
alteration filed for mechanical work in conjunction with tenant fit-out at cellar and first floor
M00903824-P1
04/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/03/2024
Cycle 9 facade report submitted
04/02/2024
Signed off — Alteration
facade repair
M08006357-I1
04/01/2024
Special inspection requirement — Tenant Protection Plan Compliance
04/01/2024
Special inspection requirement — Fire-Resistance Rated Construction
ALEKSANDR LEVIN
04/01/2024
Special inspection requirement — Final
ALEKSANDR LEVIN
04/01/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEKSANDR LEVIN
03/28/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
03/26/2024
Permit issued — General Construction
M08006357-I1-GC-CX
03/11/2024
Special inspection requirement — Tenant Protection Plan Compliance
Mark LiCalzi
03/11/2024
Special inspection requirement — Structural Steel - Details
Mark LiCalzi
03/11/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Mark LiCalzi
03/11/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mark LiCalzi
03/11/2024
Special inspection requirement — Final
Mark LiCalzi
03/06/2024
Filed — Alteration
facade repair
M08006357-P2
02/28/2024
Cycle 9 facade report submitted
02/28/2024
Cycle 9 facade report signed — UNSAFE
02/08/2024
Violation issued (ECB, closed)
Local Law
02/08/2024
Special inspection requirement — Final
Mark LiCalzi
02/08/2024
Special inspection requirement — Construction Operations Influencing Adjacent Structures
Mark LiCalzi
02/08/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mark LiCalzi
02/08/2024
Special inspection requirement — Structural Steel - Details
Mark LiCalzi
02/08/2024
Special inspection requirement — Tenant Protection Plan Compliance
02/02/2024
Cycle 9 facade inspection completed
01/09/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/05/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
Latest 60 of 235 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offDUTCHESS CABINETS OF NY *01/05/2026
DOB NOWMechanical SystemsSigned-offCOTTAM HEATING AIR COND12/11/2025
DOB NOWGeneral ConstructionSigned-offSUMMIT DEVELOPMENT CORP03/26/2024
DOB NOWSuspended ScaffoldPermit IssuedSUMMIT DEVELOPMENT CORP12/08/2023
DOB NOWSprinklersSigned-offDNA PLUMBING CONTR. INC10/27/2023
DOB NOWPlumbingSigned-offDPH PLUMBING & HTG CORP10/26/2023
DOB NOWMechanical SystemsSigned-offBE CONSTRUCTIVE LLC10/12/2023
DOB NOWGeneral ConstructionSigned-offBE CONSTRUCTIVE LLC10/11/2023
DOB NOWGeneral ConstructionPermit IssuedBE CONSTRUCTIVE LLC08/15/2023
DOB NOWStructuralSigned-offSUMMIT DEVELOPMENT CORP07/27/2023
DOB NOWSupported ScaffoldPermit IssuedPOWERS BRIDGING & SCAFFOL06/11/2023
DOB NOWSidewalk ShedSigned-offPOWERS BRIDGING & SCAFFOL06/10/2023
DOB NOWStructuralSigned-offB.O.S.S. ASSOCIATES, INC01/05/2023
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC11/09/2022
DOB NOWPlumbingSigned-offA & A PLUMBING SYSTEMS IN02/23/2022
DOB NOWGeneral ConstructionPermit IssuedBHY CONTRACTOR INC02/10/2022
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC11/15/2021
BISSDISSUEDMETRO INCORPORATED05/22/2024
BISMHISSUEDCOTTAM HEATING & AIR CONDIT.02/24/2020
BISSPISSUEDCASE PLUMBING LLC05/03/2019
BISPLISSUEDMARATHON MECHANICAL LLC02/25/2019
BISMHISSUEDTATRAS CONSTRUCTION CORP02/15/2019
BISOTISSUEDTATRAS CONSTRUCTION CORP02/14/2019
BISOTISSUEDTOLMAC CONSTRUCTION, INC07/17/2018
BISOTISSUEDEURO-TECH CONTRACTING CO*08/13/2015
BISOTISSUEDALPINE CONSTRUCTION SVC12/19/2013
BISOTISSUEDALPINE CONSTRUCTION SVC07/15/2013
BISEQISSUEDROCKLEDGE SCAFFOLD CORP06/06/2013
BISEQISSUEDROCKLEDGE SCAFFOLD CORP06/06/2013
BISOTISSUEDARTISTS,BUILDERS,CONS &10/19/2009
BISOTISSUEDTACONIC DESIGN GROUP INC12/05/2008
BISEQISSUEDJERRICK ASSOCIATES INC07/03/2007
BISEQISSUEDJERRICK ASSOCIATES INC07/03/2007
BISPLISSUEDDPH PLUMBING & HTG CORP10/12/2006
BISMHISSUED& L FORTUNE ENTERPRISE09/25/2006
BISOTISSUED& L FORTUNE ENTERPRISE09/25/2006
BISSPISSUEDFULL CAPACITY FIRE CORP04/18/2002
BISPLISSUEDCITY/SUBURBAN PLBG CORP03/19/2002
BISSPISSUEDPLUMBING WORKS CORP03/13/2002
BISOTISSUEDAMERICAN CIGAR BOX, INC.03/08/2002
+ 16 more permits on file
1 project · most recent 08/08/2023
FiledStatusContractorScope
08/08/2023——1 outlets
1 project · most recent 08/27/2024
Water/Sanitary
FiledStatusContractorScope
08/27/2024Signed-offAZ WATER MAN CORPWater/Sanitary
7 projects · most recent 03/20/2026
General Wiring HVAC Wiring
FiledStatusContractorScope
03/20/2026CompleteMONFORTE ELECTIRC CORPHVAC Wiring
12/23/2024Permit IssuedAAA'S ELECTL CONTG CORPGeneral Wiring
05/03/2023Permit IssuedOPTIMAL ELECTRIC, INC—
12/07/2021CompleteBOROWIDE ELECT'L CONTR'S—
11/23/2020Permit IssuedSTAR ELEC'L CONTRACTORS C—
11/18/2019CompleteOSTRAVA ELECTRIC CORPGeneral Wiring
04/27/2019CompleteS.E. ELECTL CONTNG CORPGeneral Wiring
1 project · most recent 08/27/2024
Steel Wood
FiledStatusContractorScope
08/27/2024Permit IssuedBE CONSTRUCTIVE LLCSteel, Wood
1 project · most recent 11/20/2023
Suspended Scaffold (SC)
FiledStatusContractorScope
11/20/2023Permit Issued—Suspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 15
DateTypeResultReport
05/28/2025Pass-Final CND-Occupancy InspectionPassView ↗
02/12/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/30/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
04/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/28/2024Pass-Final General Construction Non-Directive 14PassView ↗
01/09/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/05/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
12/19/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
12/19/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
11/24/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
02/17/2023Fail-Final CND-Occupancy InspectionFailView ↗
12/13/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/31/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 52
DateRequirementInspectorRole
01/30/2026Mechanical SystemsAlexandra Herreraspecial
01/30/2026FinalAlexandra Herreraprogress
01/23/2026Mechanical SystemsAlexandra Herreraspecial
01/23/2026FinalAlexandra Herreraprogress
11/21/2025FinalChristopher Drutjonsprogress
11/21/2025Structural Steel - DetailsChristopher Drutjonsspecial
11/29/2024Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
11/29/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
08/21/2024Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
08/21/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
06/28/2024Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
06/28/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
04/01/2024Tenant Protection Plan Compliance—special
04/01/2024Fire-Resistance Rated ConstructionALEKSANDR LEVINprogress
04/01/2024FinalALEKSANDR LEVINprogress
04/01/2024Fire-Resistant Penetrations and JointsALEKSANDR LEVINspecial
03/11/2024Tenant Protection Plan ComplianceMark LiCalzispecial
03/11/2024Structural Steel - DetailsMark LiCalzispecial
03/11/2024Construction Operations Influencing Adjacent StructuresMark LiCalzispecial
03/11/2024Structural Stability – Alterations of existing buildingsMark LiCalzispecial
03/11/2024FinalMark LiCalziprogress
02/08/2024FinalMark LiCalziprogress
02/08/2024Construction Operations Influencing Adjacent StructuresMark LiCalzispecial
02/08/2024Structural Stability – Alterations of existing buildingsMark LiCalzispecial
02/08/2024Structural Steel - DetailsMark LiCalzispecial
Latest 25 of 52.
▾Documents — 361 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/03/2026M00628195-I1Request digital key ↗
08/31/2026M00855745-I1Request digital key ↗
08/31/2026M00855752-I1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits60
▸BISPLAN / WORK APPROVAL APPLICATION27
05/03/2024100777223Open ↗
05/02/2024100777223Open ↗
09/18/2023100777223Open ↗
Showing 3 of 27 on file for this type
▸DOB NOWLPC Approval/Permit17
08/13/2026M01323150-I1Open ↗
08/13/2026M00642378-P6Open ↗
08/13/2026M00642378-P8Open ↗
Showing 3 of 17 on file for this type
▸BISWORK PERMIT APPLICATION16
05/22/2024100777223Open ↗
02/25/2020123776985Open ↗
05/06/2019123154255Open ↗
Showing 3 of 16 on file for this type
▸Seals & Professional Certifications95
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION26
01/23/2020123154255Open ↗
01/23/2020123154255Open ↗
06/28/2019123776985Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature21
08/31/2026M00855752-I1Open ↗
08/26/2026M00642378-S1Open ↗
08/26/2026M00642378-I1Open ↗
Showing 3 of 21 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature19
09/23/2026M01323149-I1Open ↗
09/02/2026M08006357-I1Open ↗
09/02/2026M08006357-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature13
09/23/2026M01323149-I1Open ↗
09/02/2026M08006357-I1Open ↗
08/31/2026M00642378-P7Open ↗
Showing 3 of 13 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT5
06/28/2019123776985Open ↗
07/10/2018123521590Open ↗
07/25/2016122835370Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST5
06/28/2019123776985Open ↗
07/10/2018123521590Open ↗
07/25/2016122835370Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
06/05/2013140083102Open ↗
06/05/2013140083120Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
09/16/2009120157560Open ↗
Showing 1 of 2 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
06/05/2013140083102Open ↗
06/05/2013140083120Open ↗
▸Trade Schedules & Equipment17
▸BISSCHEDULE B - PLUMBING6
05/03/2024100777223Open ↗
05/02/2024100777223Open ↗
12/11/2009120157560Open ↗
Showing 3 of 6 on file for this type
▸BISEQUIPMENT USE PERMITS3
08/04/2020123593021Open ↗
07/24/2020123776985Open ↗
07/22/2020123776985Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
09/04/2019123154255Open ↗
01/14/2019123593021Open ↗
01/11/2019123154255Open ↗
▸BISSELF-CERT PLUMBING NOTICE3
06/17/2010120157560Open ↗
Showing 1 of 3 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/04/2020123593021Open ↗
07/22/2020123776985Open ↗
▸Safety & Tenant Protection11
▸BISTenant Protection Plan and Notes5
06/28/2019123776985Open ↗
01/14/2019123593021Open ↗
01/11/2019123154255Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Checklist5
08/13/2026M00642378-P3Open ↗
08/13/2026M00642378-P7Open ↗
08/13/2026M00642378-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026M00642378-I1Open ↗
▸Environmental & Asbestos27
▸DOB NOWDEP ACP-5: Asbestos Assessment Report16
08/26/2026M00642378-I1Open ↗
08/26/2026M00642378-P8Open ↗
08/26/2026M00642378-P7Open ↗
Showing 3 of 16 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)5
08/15/2019123776985Open ↗
01/14/2019123593021Open ↗
01/11/2019123154255Open ↗
Showing 3 of 5 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'4
09/16/2009120157560Open ↗
Showing 1 of 4 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
11/17/2014122161882Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
11/17/2014122161882Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/10/2018123521590Open ↗
07/25/2016122835370Open ↗
05/01/2014121594177Open ↗
▸BISAS-BUILT ENERGY ANALYSIS3
02/27/2023123521590Open ↗
07/22/2020123776985Open ↗
05/01/2014121594177Open ↗
▸BISTR8: Energy Code Progress Inspections2
06/28/2013121594177Open ↗
05/13/2013121594177Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
02/27/2023123521590Open ↗
▸Inspections & Test Reports13
▸BISTECHNICAL REPORT: RESPONSIBILITY13
09/18/2023100777223Open ↗
03/13/2023123521590Open ↗
03/13/2023123521590Open ↗
Showing 3 of 13 on file for this type
▸Approvals, Objections & Sign-offs37
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST14
03/14/2023123521590Open ↗
02/13/2023100600173Open ↗
08/04/2020123593021Open ↗
Showing 3 of 14 on file for this type
▸BISLANDMARKS APPROVAL10
08/15/2019123776985Open ↗
07/10/2018123521590Open ↗
07/25/2016122835370Open ↗
Showing 3 of 10 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION3
02/25/2020123776985Open ↗
06/21/2014110417344Open ↗
07/02/2010120157560Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
05/13/2013121594177Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWLandmark Approval3
08/13/2026M08006357-P1Open ↗
08/13/2026M08006357-P2Open ↗
08/13/2026M08006357-I1Open ↗
▸BISLANDMARKS SIGNOFF2
03/01/2023123521590Open ↗
07/22/2020123776985Open ↗
▸BISSUPERSEDING LETTER1
05/22/2024100777223Open ↗
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter1
08/13/2026M00855745-I1Open ↗
▸Cost, Insurance & Ownership19
▸BISCOST AFFIDAVIT18
02/27/2023123521590Open ↗
08/04/2020123593021Open ↗
07/22/2020123776985Open ↗
Showing 3 of 18 on file for this type
▸BISHIC LICENSE OR AFFIDAVIT1
02/14/2019123593021Open ↗
▸Filing & Intake Forms30
▸BISADDITIONAL INFORMATION10
10/16/2023100777223Open ↗
08/04/2020123593021Open ↗
07/22/2020123776985Open ↗
Showing 3 of 10 on file for this type
▸BISEFILING COVER SHEET10
06/28/2019123776985Open ↗
01/14/2019123593021Open ↗
01/14/2019123593021Open ↗
Showing 3 of 10 on file for this type
▸BISBOROUGH INTAKE FORM6
05/22/2024100777223Open ↗
05/17/2024100777223Open ↗
05/10/2024100777223Open ↗
Showing 3 of 6 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET2
06/05/2013140083102Open ↗
06/05/2013140083120Open ↗
▸DOB NOWAI1 Form (from plan PDF)2
08/16/2026M00642378-P6Open ↗
08/16/2026M00642378-P7Open ↗
▸Other Documents21
▸DOB NOWProof of Historic Building9
08/13/2026M00642378-P7Open ↗
08/13/2026M01323149-P1Open ↗
08/13/2026M01323149-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProperty Ownership Certification7
08/26/2026M00642378-I1Open ↗
08/26/2026M00642378-P8Open ↗
08/26/2026M00642378-P7Open ↗
Showing 3 of 7 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
07/24/2020123776985Open ↗
06/05/2013140083102Open ↗
▸BISDepartment of Consumer Affairs (DCA) Form1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWCalculations1
08/13/2026M00965313-I1Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026M00965313-I1Open ↗