← Back
One family attached or semi-detached
152 HOLLAND AVENUE
STATEN ISLAND · Mariner's Harbor-Arlington-Graniteville · BIN 5147436
💬 Discuss this project
2004Year Built
2Stories
A5Building Class
R3-2Zoning
1,204 sfGross Floor Area
1Units
One family attached or semi-detached · 2,002 sf lot · 0.6 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof1p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ETRECTE LLC110/24/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRIOT ENERGY SOLUTIONS CORP203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MARK HALLElectrical103/21/2026
PATRIOT ENERGY SOL COGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116110/24/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
01/08/2025
Signed off — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
S01128528-I1
10/29/2024
Permit issued — Solar
S01128528-I1-SL
10/24/2024
Filed — Alteration
ROOFTOP SOLAR PANEL INSTALLATION
S01128528-I1
10/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
10/17/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
10/17/2024
Special inspection requirement — Energy Code Compliance Inspections
VYACHESLAV NECHAYEV
10/17/2024
Special inspection requirement — Final
VYACHESLAV NECHAYEV
10/17/2024
Special inspection requirement — Air barrier - visual inspection
VYACHESLAV NECHAYEV
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offPATRIOT ENERGY SOL CO10/29/2024
BIS—ISSUEDASPINWALL BUILDING CORP.04/30/2004
BIS—ISSUEDASPINWALL BUILDING CORP.09/12/2003
BISPLISSUEDARROW PLUMBING & HEATING CORP09/12/2003
1 project · most recent 10/18/2024
FiledStatusContractorScope
10/18/2024CompleteMAK ELECTRICAL CONTR CORP1 meters
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/17/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
10/17/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
10/17/2024Energy Code Compliance InspectionsVYACHESLAV NECHAYEVprogress
10/17/2024FinalVYACHESLAV NECHAYEVprogress
10/17/2024Air barrier - visual inspectionVYACHESLAV NECHAYEVenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026S01128528-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/25/2026S01128528-I1Open ↗
08/25/2026S01128528-I1Open ↗
08/25/2026S01128528-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/25/2026S01128528-I1Open ↗
08/25/2026S01128528-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/20/2026S01128528-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026S01128528-I1Open ↗