ECB01/04/2026INACTIVE JOBSITE, OBSERVED CONSTRUCTION FENCE INSTALLED AROUND JOBSITE PERIMETER SEEN IN INADEQUATE CONDITION NOT MAINTAINED AS PER CODE REQUIREMENT, AFTER REVIEW OF BIS & THE DEPARTMENT OF BUILDINGS (DOB) SYST$6K due
ECB04/28/2026RESPONDING TO A COMPLAINT OBSERVED: SIDEWALK SHED INSTALLED AT EXPO# 1-2. NO UNDERSIDE LIGHTING INOPERABLE LIGHT BULBS, FAILURE TO MAINTAIN AS PER CODE 3307.6.4.8 BECOME AN UNSAFE AND HAZARDOUS CONDITION FOR PEHearing held — result not yet published$2K proposed
ECB04/23/2026UPON INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&2 WITH NOT SIDEWALK SHED PROJECT INFO PANEL INSTALLED CONTRARY TO CODE 3301.9.2 SIDEWALK SHED PARAPET INFORMATION PANEL. WHERE A SIDEWALK SHED ISHearing held — result not yet published$1K proposed
ECB04/23/2026UPON INSPECTION OF AN ACTIVE 5 STORY NB I OBSERVED MULTIPLE FLOORS WITH MISSING AND INADEQUATE FIRE EXTINGUISHERS. NO EXTINGUISHERS PROVIDED ON 4,5, ROOF AND BASEMENT. EXTINGUISHERS ON 2 & 3 WERE NOT OFF THE GRHearing held — result not yet published$1K proposed
ECB04/23/2026I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOS 1&2 CONTRARY TO APPROVED DRAWINGS. SHED NOT INSTALLED TIGHT TO ADJOINING PROPERTIES AT EXPOS 1&2. MISSING CROSS BRACE AT EXPOS 1. MUDSILL NOT SECURED TO BEAM AT EXPHearing held — result not yet published$1K proposed
ECB04/23/2026UPON INSPECTION OF AN ACTIVE 5 STORY NB I OBSERVED NO HANDRAILS PROVIDED AT STEPS AT THE BUILDING ENTRY ON THE 1ST FLOOR EXPOS 2 AND NO HANDRAILS PROVIDED IN THE BASEMENT AND STAIRS LEADING TO THE BASEMENT.Hearing held — result not yet published$2K proposed
ECB04/23/2026UPON INSPECTION I OBSERVED A FENCE INSTALLED AT EXPOS 1&2 WITH AN INADEQUATE AND MISSING FENCE PROJECT INFO PANEL. EXPOS 2 INFO PANEL WAS NOT 36.5IN TALL AND 55IN WIDE CONTRARY TO CODE 3301.9.1.4. PRIMARY PERMIHearing held — result not yet published$1K proposed