← Back
Converted dwellings or rooming house
152 WEST 129 STREET
MANHATTAN · Harlem (North) · BIN 1057964
💬 Discuss this project
1910Year Built
6Stories
C5Building Class
R7-2Zoning
20,520 sfGross Floor Area
24Units
Rent Stabilized30 Open Violations 29 unresolved · 1 paperwork only ▸FDNY Report ↗
Converted dwellings or rooming house · Owner of record: AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP. · 4,871 sf lot · 4.21 FAR built · Flood zone X
Locations of Work
Architecture
Roof4p · 2 filings · 20 docs
Cellar1p · 1 filing · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
WEST HARLEM GROUP ASSISTANCE4707/08/2026
ALPHA SCAFFOLDING INC903/22/2026
METRO CONTRACTING NY503/22/2026
AMSTERDAM GARVEY HOUSING DEVELOPMENT FUN D CORP.203/22/2026
JG GENERAL CONTRACT INC.203/22/2026
J&G CONSTRUCTION INC103/21/2026
J G GENERAL CONTRACTING303/21/2026
WHGA GARVEY HDFC303/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP209/05/2025
P. M. ARCHITECTURE, PC1507/25/2025
MSM ENGINEERING SERVICES, PLLC110/30/2024
SYNERGIC DESIGN ARCHITECTS109/25/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PM ARCHITECTURE PC3003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ALPHA SCAFFOLDING INCGeneral Contractor603/21/2026
AMERICAN STANDARD P&H CORORP.Plumbing407/08/2026
HORIZON CONSTRUCTION INCGeneral Contractor407/08/2026
ACCORD POWER INCGeneral Contractor203/21/2026
METRO CONTRACTING NY, INC.General Contractor203/21/2026
SYED-NAQVI, ALTAFElectrical103/21/2026
SYED-NAQVI ALTAFElectrical103/21/2026
RICHARD NEUElectrical103/21/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SOCOTEC ENGINEERING49831307/25/2025
SYNERGIC DESIGN LLC8561109/25/2024
Building Lifecycle
All (138)Filed (19)Permit Issued (12)Signed Off (8)Violation (60)Inspection (9)Special Inspection (30)
08/28/2026
Violation issued (HPD, open)
B
08/28/2026
Violation issued (HPD, open)
C
03/26/2026
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047511-S2
03/19/2026
Violation issued (HPD, open)
A
03/19/2026
Violation issued (HPD, open)
A
02/24/2026
Signed off — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047511-S1
11/21/2025
Signed off — Alteration
Replace and relocate plumbing fixtures at kitchen bath per revised layout at apts. 1B and 1C. No change in use egress or occupancy.
M00829316-I1
11/04/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
10/29/2025
Signed off — Alteration
Renovated bathrooms and kitchens at apts. 1B and 1C for ADA compliance
M00830686-I1
10/22/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
10/09/2025
Signed off — Alteration
Interior work at common space of building and exterior work as per plan. No change to use, egress, or occupancy under this filing.
M00826822-I1
09/19/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01273162-I1
09/08/2025
Permit issued — Sidewalk Shed
M01277422-I1-SH
09/08/2025
Permit issued — Supported Scaffold
M01273162-I1-SF
09/05/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01273162-I1
09/05/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01277422-I1
07/31/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/25/2025
Filed — Alteration
Interior work at common space of building and exterior work as per plan. No change to use, egress, or occupancy under this filing.
M00826822-P2
07/24/2025
Permit issued — General Construction
M00826822-I1-GC
07/23/2025
Permit issued — General Construction
M00830686-I1-GC
07/22/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
07/21/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047511-P3
07/11/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
07/11/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/03/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
06/04/2025
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
05/28/2025
Signed off — Alteration
M01115024-I1
05/15/2025
Permit issued — Boiler Equipment
M01047511-S2-BE
05/11/2025
Special inspection requirement — Final
ALEXIS SCHLESSINGERMAN
05/11/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
05/09/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
04/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
04/25/2025
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
04/25/2025
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
04/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
04/23/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047511-S2
04/23/2025
Filed — Alteration
Replace and relocate plumbing fixtures at kitchen bath per revised layout at apts. 1B and 1C. No change in use egress or occupancy.
M00829316-P2
04/23/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047511-P1
04/23/2025
Filed — Alteration
New Boiler installation, subsequent filing to add 2nd boiler. No change to use egress or occupancy.
M01047511-P2
04/23/2025
Violation issued (HPD, closed)
C
04/16/2025
Filed — Alteration
Renovated bathrooms and kitchens at apts. 1B and 1C for ADA compliance
M00830686-P2
04/16/2025
Special inspection requirement — Tenant Protection Plan Compliance
03/13/2025
Signed off — Alteration
M01134567-I1
12/30/2024
Violation issued (HPD, closed)
C
12/16/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
12/16/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
12/16/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
12/16/2024
Special inspection requirement — Tenant Protection Plan Compliance
ALEXIS SCHLESSINGERMAN
12/13/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
12/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
ALEXIS SCHLESSINGERMAN
12/13/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/13/2024
Special inspection requirement — Energy Code Compliance Inspections
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — Heating Systems
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — Tenant Protection Plan Compliance
12/05/2024
Special inspection requirement — HVAC-R and service water heating equipment
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
ALEXIS SCHLESSINGERMAN
12/05/2024
Special inspection requirement — HVAC-R and service water heating system controls
ALEXIS SCHLESSINGERMAN
10/30/2024
Filed — Alteration
M01134567-I1
Latest 60 of 138 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedALPHA SCAFFOLDING INC09/08/2025
DOB NOWSupported ScaffoldSigned-offALPHA SCAFFOLDING INC09/08/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/24/2025
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/23/2025
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.05/15/2025
DOB NOWSidewalk ShedSigned-offMETRO CONTRACTING NY, INC.10/30/2024
DOB NOWSolarSigned-offACCORD POWER INC10/16/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/05/2024
DOB NOWPlumbingSigned-offAMERICAN STANDARD P&H CORORP.09/05/2024
DOB NOWBoiler EquipmentSigned-offAMERICAN STANDARD P&H CORORP.09/04/2024
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/23/2024
DOB NOWGeneral ConstructionSigned-offHORIZON CONSTRUCTION INC07/18/2024
BISEQISSUEDJ & G GNRL CONTRACT INC05/10/2012
BISEQISSUEDJ & G GNRL CONTRACT INC05/08/2012
BISOTISSUEDAP. TEK RESTORATION INC03/30/2012
BISEQISSUEDJ & G GNRL CONTRACT INC03/13/2012
BISEQISSUEDJ & G GNRL CONTRACT INC03/08/2012
BISBLISSUEDBARMOR REHAB INC04/12/2011
BISPLISSUEDBARMOR REHAB INC04/12/2011
BISOTISSUEDAP. TEK RESTORATION INC08/05/2010
1 project · most recent 07/21/2025
Gas
FiledStatusContractorScope
07/21/2025Signed-offAMERICAN STANDARD P&H CORGas
4 projects · most recent 09/05/2025
General Wiring
FiledStatusContractorScope
09/05/2025Permit IssuedRICHARD NEU—
04/08/2025CompletePOWER SURGE ELECTRIC, INC—
03/10/2025CompleteHI-RITE ELECTRIC CORPGeneral Wiring
10/30/2024CompleteRICHARD NEU—
1 project · most recent 09/05/2025
Sidewalk Shed
FiledStatusContractorScope
09/05/2025Permit IssuedALPHA SCAFFOLDING INCSidewalk Shed
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/04/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
10/22/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/31/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/11/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/03/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/10/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
06/04/2025Pass-Final Boiler Equipment InspectionPassView ↗
05/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
07/22/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
05/11/2025FinalALEXIS SCHLESSINGERMANprogress
05/11/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/25/2025HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
04/25/2025HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
04/25/2025Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
04/25/2025Heating SystemsALEXIS SCHLESSINGERMANspecial
04/25/2025HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
04/16/2025Tenant Protection Plan Compliance—special
12/16/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
12/16/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
12/16/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
12/16/2024Tenant Protection Plan ComplianceALEXIS SCHLESSINGERMANspecial
12/13/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
12/13/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
12/13/2024Tenant Protection Plan Compliance—special
12/13/2024Energy Code Compliance InspectionsALEXIS SCHLESSINGERMANprogress
12/05/2024Heating SystemsALEXIS SCHLESSINGERMANspecial
12/05/2024Tenant Protection Plan Compliance—special
12/05/2024HVAC-R and service water heating equipmentALEXIS SCHLESSINGERMANenergy_progress
12/05/2024HVAC-R and service water piping design and insulationALEXIS SCHLESSINGERMANenergy_progress
12/05/2024HVAC-R and service water heating system controlsALEXIS SCHLESSINGERMANenergy_progress
05/31/2024Fire-Resistant Penetrations and JointsALEXIS SCHLESSINGERMANspecial
05/31/2024Insulation placement and R valuesALEXIS SCHLESSINGERMANenergy_progress
05/31/2024Lighting controlsALEXIS SCHLESSINGERMANenergy_progress
Latest 25 of 35.
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/31/2026M00826822-P1Request digital key ↗
08/31/2026M00826822-I1Request digital key ↗
08/31/2026M00826822-P2Request digital key ↗
Showing 3 of 19 on file for this type
▸Applications & Permits15
▸BISWORK PERMIT APPLICATION9
05/14/2012120544679Open ↗
05/14/2012121003779Open ↗
04/10/2012120998224Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
04/10/2012120998224Open ↗
03/15/2012121003779Open ↗
08/24/2011120638676Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications50
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/31/2026M00826822-I1Open ↗
08/31/2026M00826822-P1Open ↗
08/31/2026M00830686-I1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
09/23/2026M01047511-I1Open ↗
09/23/2026M01047511-S2Open ↗
08/30/2026M00830686-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/23/2026M01047511-I1Open ↗
09/23/2026M01047511-S2Open ↗
09/23/2026M01047511-I1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION5
04/10/2012120998224Open ↗
03/15/2012121003779Open ↗
03/24/2011120638676Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM4
04/10/2012120998224Open ↗
03/15/2012121003779Open ↗
12/02/2010120544679Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST4
04/10/2012120998224Open ↗
03/15/2012121003779Open ↗
12/03/2010120544679Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment4
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
04/05/2011120638676Open ↗
▸BISSCHEDULE B - PLUMBING1
03/24/2011120638676Open ↗
▸BISBOILERS - SUPPORTING DOCUMENTATION1
11/22/2011120638676Open ↗
▸BISSELF-CERT PLUMBING NOTICE1
11/22/2011120638676Open ↗
▸Environmental & Asbestos19
▸DOB NOWDEP ACP-5: Asbestos Assessment Report15
08/31/2026M00826822-I1Open ↗
08/31/2026M00826822-P1Open ↗
08/31/2026M00830686-P2Open ↗
Showing 3 of 15 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'3
03/15/2012121003779Open ↗
03/24/2011120638676Open ↗
08/09/2010120431149Open ↗
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER1
12/02/2010120544679Open ↗
▸Energy Compliance3
▸BISTECHNICAL REPORT: ENERGY2
04/10/2012120998224Open ↗
03/24/2011120638676Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/27/2026M01047511-I1Open ↗
▸Approvals, Objections & Sign-offs23
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter17
08/31/2026M00826822-P1Open ↗
08/31/2026M00826822-I1Open ↗
08/26/2026M01115024-I1Open ↗
Showing 3 of 17 on file for this type
▸BISADMINISTRATIVE OBJECTIONS4
03/15/2012121003779Open ↗
03/24/2011120638676Open ↗
12/02/2010120544679Open ↗
Showing 3 of 4 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION1
03/13/2012120544679Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026M01115024-I1Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT3
04/10/2012120998224Open ↗
03/24/2011120638676Open ↗
08/09/2010120431149Open ↗
▸Filing & Intake Forms5
▸BISEFILING COVER SHEET5
04/10/2012120998224Open ↗
03/15/2012121003779Open ↗
03/24/2011120638676Open ↗
Showing 3 of 5 on file for this type
▸Other Documents4
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/31/2026M00826822-I1Open ↗
08/31/2026M00826822-P1Open ↗
08/13/2026M00826822-P2Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
05/14/2012120544679Open ↗