Elevator apt, fireproof with stores
Caldwell
1520 YORK AVENUE · BIN 1050869
💬 Discuss this project
1972Year Built
31Stories
D6Building Class
R10Zoning
281,902 sfGross Floor Area
270Units
LL97 CoveredRent Stabilized0 Open ViolationsFISP: SWARMP
Elevator apt, fireproof with stores · Owner of record: 80TH REALTY LLC · 24,609 sf lot · 11.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction4p · 3 filings · 20 docs
CellarUnder Construction2p · 3 filings · 17 docs
Sub-CellarUnder Construction1p · 1 filing · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
C O ROSE ASSOCIATES6607/08/2026
ROSE ASSOCIATES507/08/2026
SHALBRO CONSTRUCTION GROUP607/08/2026
80TH REALTY1803/22/2026
80 REALTY LLC203/22/2026
GLENWOOD MANAGEMENT4403/22/2026
GLENWOOD MANAGEMENT COEP403/21/2026
80TH REALTY LLC C O GLENWOOD MGM303/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
RAYMOND HO ARCHITECT403/21/2026
Rigid Structural Design, LLC2003/21/2026
A K EXPEDITING403/21/2026
EUROCELT EXPEDITING, INC203/21/2026
CONVERSANO ASSOCIATES, INC.403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW AMSTERDAM RESTORATIONGeneral Contractor1807/08/2026
ALFONSO GIGANTEElectrical403/21/2026
TRITON RENOVATION CORPGeneral Contractor303/21/2026
SHALBRO CONSTRUCTION GROUPGeneral Contractor207/08/2026
HIGH QUALITY ELECTRIC OFElectrical103/22/2026
BEST MATCH CORPORATIONGeneral Contractor107/08/2026
EMPRISE CONSTRUCTION INCGeneral Contractor107/08/2026
KATAN P & H INCPlumbing107/08/2026
SEAN COAKLEY P & H INCPlumbing107/08/2026
VMC PLUMBING & HEATING INPlumbing107/08/2026
CONTROL SPEC ELECL SYSTEMElectrical103/22/2026
GKF ELECL CONTRACTORS INCElectrical103/22/2026
GLENDALE ELECTL CONTNG INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROCK ARCH ENG CORP1760203/03/2026
PACE ENGINEERING P.C.1679110/22/2025
ASE ENGINEERING PLLC5785110/22/2025
RAYMOND HO ARCHITECT, PLL1654505/23/2025
URBAN INTEGRATIONS LLC7993311/18/2024
DEAN MENDEZ ARCHITECT, P.8621102/22/2024
FREYER COLLABORATIVE ARCH2198207/25/2022
Building Lifecycle
All (187)Filed (25)Permit Issued (23)Signed Off (13)Facade (FISP) (17)Violation (60)Inspection (8)Objection (11)Special Inspection (30)
04/03/2026
Permit issued — General Construction
M00958574-I1-GC
03/23/2026
Objection raised — Scope
03/23/2026
Objection raised — Scope
03/23/2026
Objection raised — Admin
03/08/2026
Cycle 10 facade report submitted
03/06/2026
Cycle 10 facade report signed — SAFE
03/04/2026
Cycle 10 facade inspection completed
03/03/2026
Filed — Alteration
FACADE REPAIRS NO CHANGE IN USE EGRESS OR OCCUPANCY
M00958574-P1
12/19/2025
Permit issued — Structural
M01271015-I1-GC
12/02/2025
Signed off — Alteration
M01125860-I1
12/02/2025
Signed off — Alteration
M00997979-I1
12/02/2025
Signed off — Alteration
M00999890-I1
11/24/2025
Special inspection requirement — Energy Code Compliance Inspections
Baris Acar
10/22/2025
Filed — Alteration
M01271015-I1
09/02/2025
Signed off — Alteration
MINOR KITCHEN RENOVATION AT APT 28G ON THE 28th FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M01225708-I1
08/15/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/13/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Baris Acar
08/13/2025
Special inspection requirement — Final
Baris Acar
08/13/2025
Special inspection requirement — Concrete - Cast-In-Place
Baris Acar
08/13/2025
Special inspection requirement — Masonry
Baris Acar
08/13/2025
Special inspection requirement — Tenant Protection Plan Compliance
alon egozi
08/07/2025
Signed off — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00988038-I1
07/31/2025
Signed off — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
M00998061-I1
07/30/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/24/2025
Signed off — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00988044-I1
07/18/2025
Signed off — Alteration
INSTALL NEW 2 HR RATED PARTITION AT APT 28GH TO CONVERT COMBINED APT BACK TO APT 28G & 28H. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M01181890-I1
06/04/2025
Permit issued — Plumbing
M01225708-I1-PL
05/23/2025
Filed — Alteration
MINOR KITCHEN RENOVATION AT APT 28G ON THE 28th FLOOR. SCOPE OF WORKS AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M01225708-I1
05/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PING MAN HO
05/23/2025
Special inspection requirement — Final
PING MAN HO
05/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
PING MAN HO
05/22/2025
Filed — Alteration
INSTALL NEW 2 HR RATED PARTITION AT APT 28GH TO CONVERT COMBINED APT BACK TO APT 28G & 28H. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M01181890-P1
05/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
PING MAN HO
05/09/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00988044-P2
05/02/2025
Permit issued — General Construction
M00958574-I1-GC
05/01/2025
Permit issued — Protection and Mechanical Methods
M00997979-I1-PMM
04/22/2025
Permit issued — Suspended Scaffold
M00998061-I1-SC
04/21/2025
Permit issued — General Construction
M01181890-I1-GC
03/10/2025
Filed — Alteration
INSTALL NEW 2 HR RATED PARTITION AT APT 28GH TO CONVERT COMBINED APT BACK TO APT 28G & 28H. SCOPE OF WORK AS SHOWN IN PLANS. NO CHANGE IN EGRESS, OCCUPANCY OR USE.
M01181890-I1
02/11/2025
Permit issued — Protection and Mechanical Methods
M00999890-I1-PMM
02/04/2025
Violation issued (ECB, closed)
Construction
02/04/2025
Violation issued (ECB, closed)
Construction
02/04/2025
Violation issued (ECB, closed)
Unknown
02/04/2025
Violation issued (ECB, closed)
Construction
02/04/2025
Violation issued (ECB, closed)
Unknown
01/22/2025
Permit issued — Supported Scaffold
M00988044-I1-SF
01/22/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/17/2025
Filed — Alteration
Installation of a temporarily supported scaffold per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00988044-P1
01/17/2025
Filed — Alteration
Installation of a temporarily heavy-duty sidewalk shed per plan submitted. Work shall comply with 2022 building codes chapter 33. No change in use, egress and/or occupancy with this application.
M00988038-P2
01/10/2025
Violation issued (HPD, closed)
C
01/06/2025
Permit issued — Sidewalk Shed
M00988038-I1-SH
01/02/2025
Violation issued (HPD, closed)
B
01/02/2025
Violation issued (HPD, closed)
C
12/31/2024
Violation issued (ECB, closed)
Construction
11/27/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
DANNY TRUJILLO
11/27/2024
Special inspection requirement — Post-installed Anchors
DANNY TRUJILLO
11/27/2024
Special inspection requirement — Alternative Materials - OTCR Buildings Bulletin Number
DANNY TRUJILLO
11/21/2024
Violation issued (ECB, closed)
Construction
11/18/2024
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
M00998061-P2
11/13/2024
Filed — Alteration
M01125860-I1
Latest 60 of 187 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNEW AMSTERDAM RESTORATION04/03/2026
DOB NOWStructuralPermit IssuedNEW AMSTERDAM RESTORATION12/19/2025
DOB NOWPlumbingSigned-offM. SPINELLI PLB & HTG INC06/04/2025
DOB NOWGeneral ConstructionPermit IssuedNEW AMSTERDAM RESTORATION05/02/2025
DOB NOWProtection and Mechanical MethodsSigned-offNEW AMSTERDAM RESTORATION05/01/2025
DOB NOWSuspended ScaffoldSigned-offNEW AMSTERDAM RESTORATION04/22/2025
DOB NOWGeneral ConstructionSigned-offEMPRISE CONSTRUCTION INC04/21/2025
DOB NOWProtection and Mechanical MethodsSigned-offNEW AMSTERDAM RESTORATION02/11/2025
DOB NOWSupported ScaffoldSigned-offNEW AMSTERDAM RESTORATION01/22/2025
DOB NOWSidewalk ShedSigned-offNEW AMSTERDAM RESTORATION01/06/2025
DOB NOWProtection and Mechanical MethodsSigned-offNEW AMSTERDAM RESTORATION11/13/2024
DOB NOWSuspended ScaffoldPermit IssuedNEW AMSTERDAM RESTORATION08/02/2024
DOB NOWGeneral ConstructionPermit IssuedNEW AMSTERDAM RESTORATION05/09/2024
DOB NOWSuspended ScaffoldSigned-offNEW AMSTERDAM RESTORATION04/26/2024
DOB NOWSupported ScaffoldSigned-offNEW AMSTERDAM RESTORATION02/13/2024
DOB NOWProtection and Mechanical MethodsSigned-offNEW AMSTERDAM RESTORATION02/09/2024
DOB NOWProtection and Mechanical MethodsSigned-offNEW AMSTERDAM RESTORATION02/02/2024
DOB NOWPlumbingSigned-offKATAN P & H INC02/15/2023
DOB NOWGeneral ConstructionSigned-offTRITON RENOVATION CORP11/26/2022
DOB NOWGeneral ConstructionSigned-offBEST MATCH CORPORATION10/19/2022
DOB NOWSidewalk ShedSigned-offSHALBRO CONSTRUCTION GROU08/25/2022
DOB NOWSupported ScaffoldSigned-offSHALBRO CONSTRUCTION GROU08/24/2022
DOB NOWPlumbingSigned-offSEAN COAKLEY P & H INC08/11/2022
BISMHISSUEDBEST MATCH CORPORATION04/18/2019
BISPLISSUEDSEAN COAKLEY P & H INC08/09/2018
BISOTISSUEDBEST MATCH CORPORATION07/26/2018
BIS—ISSUEDFREYER COLLABORATIVE ARCHITECTS10/05/2017
BISMHISSUEDJ T & T AIR CONDITIONING05/26/2017
BISOTISSUEDYORK RESTORATION CORP05/17/2017
BISEQISSUEDYORK RESTORATION CORP05/17/2017
BISEQISSUEDYORK RESTORATION CORP04/07/2017
BISEQISSUEDROCK GROUP NY CORP06/03/2016
BISEQISSUEDCEPRINE CONSTRUCTION INC02/05/2016
BISOTISSUEDYORK RESTORATION CORP11/05/2015
BISEQISSUEDROCK GROUP NY CORP11/02/2015
BISOTISSUEDYORK RESTORATION CORP10/14/2015
BISEQISSUEDROCK GROUP NY CORP06/12/2015
BISOTISSUEDYORK RESTORATION CORP03/11/2015
BISOTISSUEDYORK RESTORATION CORP02/04/2015
BISEQISSUEDROCK GROUP NY CORP06/12/2014
+ 33 more permits on file
11 jobs · most recent 04/02/2026
General Wiring
FiledStatusContractorScope
04/02/2026Permit IssuedCONTROL ELEC'L CONT'G CORGeneral Wiring
08/28/2025CompleteGKF ELECL CONTRACTORS INCGeneral Wiring
07/17/2025CompleteGKF ELECL CONTRACTORS INCGeneral Wiring
07/17/2025CompleteGKF ELECL CONTRACTORS INCGeneral Wiring
07/17/2025CompleteGKF ELECL CONTRACTORS INCGeneral Wiring
06/25/2025CompleteGKF ELECL CONTRACTORS INCGeneral Wiring
02/14/2025CompleteGKF ELECL CONTRACTORS INCGeneral Wiring
08/06/2024Permit IssuedHIGH QUALITY ELECTRIC OF—
02/19/2024CompleteGLENDALE ELECTL CONTNG IN—
05/04/2018CompleteCONTROL SPEC ELECL SYSTEM—
01/28/2018CompleteD'ALCO ELECTRICAL, INC.General Wiring
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
08/15/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/30/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
10/18/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
10/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/01/2022Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/01/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/31/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 31
DateRequirementInspectorRole
11/24/2025Energy Code Compliance InspectionsBaris Acarprogress
08/13/2025Structural Stability – Alterations of existing buildingsBaris Acarspecial
08/13/2025FinalBaris Acarprogress
08/13/2025Concrete - Cast-In-PlaceBaris Acarspecial
08/13/2025MasonryBaris Acarspecial
08/13/2025Tenant Protection Plan Compliancealon egozispecial
05/23/2025Fire-Resistant Penetrations and JointsPING MAN HOspecial
05/23/2025FinalPING MAN HOprogress
05/23/2025Fire-Resistance Rated ConstructionPING MAN HOprogress
05/14/2025Fire-Resistant Penetrations and JointsPING MAN HOspecial
11/27/2024Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
11/27/2024Post-installed AnchorsDANNY TRUJILLOspecial
11/27/2024Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
10/16/2024Post-installed AnchorsDANNY TRUJILLOspecial
10/16/2024Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
10/16/2024Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
07/25/2024Tenant Protection Plan Compliance—special
07/24/2024MasonryBRIAN O'CONNORspecial
07/24/2024Alternative Materials - OTCR Buildings Bulletin NumberDANNY TRUJILLOspecial
07/24/2024Post-installed AnchorsDANNY TRUJILLOspecial
07/24/2024Structural Stability – Alterations of existing buildingsDANNY TRUJILLOspecial
07/24/2024FinalBRIAN O'CONNORprogress
07/24/2024Structural Stability – Alterations of existing buildingsBRIAN O'CONNORspecial
02/25/2024Tenant Protection Plan ComplianceDean Mendezspecial
11/09/2023Structural Stability – Alterations of existing buildingsBRIAN O'CONNORspecial
Latest 25 of 31.
▾Documents — 458 on file (BIS + DOB NOW)
▸Plans & Drawings25
▸DOB NOWPlans/Sketch25
09/02/2026M00775786-I1Request digital key ↗
09/02/2026M00797642-I1Request digital key ↗
09/01/2026M00797584-I1Request digital key ↗
Showing 3 of 25 on file for this type
▸Applications & Permits92
▸BISPLAN / WORK APPROVAL APPLICATION53
08/02/2022122037982Open ↗
07/13/2022122037982Open ↗
07/12/2022140420970Open ↗
Showing 3 of 53 on file for this type
▸BISWORK PERMIT APPLICATION36
04/18/2019123551263Open ↗
08/09/2018123551263Open ↗
07/27/2018123551263Open ↗
Showing 3 of 36 on file for this type
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION2
10/10/2017123352004Open ↗
Showing 1 of 2 on file for this type
▸BISNon-Directive 14 Construction Sign Off Including Sign Applications1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications112
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION29
04/25/2019123551263Open ↗
03/13/2019120411072Open ↗
03/13/2019120411072Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature23
09/27/2026M00775917-I1Open ↗
09/01/2026M00958574-P1Open ↗
09/01/2026M00998061-I1Open ↗
Showing 3 of 23 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature22
09/02/2026M00775917-I1Open ↗
09/02/2026M00775786-I1Open ↗
09/02/2026M00797642-I1Open ↗
Showing 3 of 22 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT9
07/25/2018123551263Open ↗
05/07/2017140637023Open ↗
05/07/2017140637023Open ↗
Showing 3 of 9 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST8
07/25/2018123551263Open ↗
05/05/2017123069678Open ↗
06/18/2014122037982Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026M00958574-P1Open ↗
08/31/2026M01181890-I1Open ↗
08/31/2026M01181890-I1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION5
05/07/2017140637023Open ↗
03/28/2017140621539Open ↗
05/03/2016140481119Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY4
03/28/2017140621539Open ↗
05/03/2016140481119Open ↗
02/04/2016140456147Open ↗
Showing 3 of 4 on file for this type
▸Trade Schedules & Equipment22
▸BISSELF-CERT PLUMBING NOTICE8
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 8 on file for this type
▸BISSCHEDULE B - PLUMBING5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISEQUIPMENT USE PERMITS2
08/16/2018123069678Open ↗
10/17/2013121749304Open ↗
▸BISSIGN HANGER CERTIFICATE2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
08/16/2018123069678Open ↗
10/16/2013121749304Open ↗
▸BISFA - FDNY APPROVAL : FD-FAA1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
07/25/2018123551263Open ↗
▸Safety & Tenant Protection9
▸BISTENANT PROTECTION PLAN AND NOTES5
03/28/2017140621539Open ↗
05/03/2016140481119Open ↗
02/04/2016140456147Open ↗
Showing 3 of 5 on file for this type
▸BISSTREET TREE CHECKLIST3
08/03/2017123352004Open ↗
Showing 1 of 3 on file for this type
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos33
▸BISASBESTOS: CERTIFICATION (DEP ACP5)10
07/25/2018123551263Open ↗
07/25/2018123551263Open ↗
05/07/2017140637023Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report10
09/02/2026M00775786-I1Open ↗
08/24/2026M01181890-I1Open ↗
08/23/2026M01225708-I1Open ↗
Showing 3 of 10 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER6
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 6 on file for this type
▸BISTHIS IS NOT AN ASBESTOS PROJECT5
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 5 on file for this type
▸BISACP5 ASBESTOS: CERTIFICATION (DEP ACP5)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISASBESTOS-EXEMPTION (ASB4)1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance20
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS10
04/25/2019123551263Open ↗
08/16/2018140637023Open ↗
07/26/2018123069678Open ↗
Showing 3 of 10 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS7
04/25/2019123551263Open ↗
08/16/2018140637023Open ↗
07/26/2018123069678Open ↗
Showing 3 of 7 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
05/07/2017140637023Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
02/04/2016140456147Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
05/07/2017140637023Open ↗
▸Inspections & Test Reports9
▸BISTECHNICAL REPORT: RESPONSIBILITY6
05/17/2017140637023Open ↗
05/07/2017140637023Open ↗
03/28/2017140621539Open ↗
Showing 3 of 6 on file for this type
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS2
06/27/2022140420970Open ↗
06/27/2022122037982Open ↗
▸BISDIR-14 ID OF RESPONSIBILITY (TR1)1
06/27/2022122037982Open ↗
▸Approvals, Objections & Sign-offs54
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST21
08/03/2022122037982Open ↗
07/12/2022140420970Open ↗
06/04/2019123352004Open ↗
Showing 3 of 21 on file for this type
▸BISADMINISTRATIVE OBJECTIONS13
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE13
05/16/2019123352004Open ↗
05/06/2019123352004Open ↗
08/03/2017123352004Open ↗
Showing 3 of 13 on file for this type
▸BISFINAL2
06/27/2022140420970Open ↗
06/27/2022122037982Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
06/24/2022122037982Open ↗
Showing 1 of 2 on file for this type
▸BISSHED LETTER2
06/13/2016122037982Open ↗
06/30/2015122037982Open ↗
▸BISSUPERSEDING LETTER1
06/30/2015122037982Open ↗
▸Cost, Insurance & Ownership30
▸BISCOST AFFIDAVIT30
04/25/2019123551263Open ↗
04/05/2019120411072Open ↗
08/16/2018140637023Open ↗
Showing 3 of 30 on file for this type
▸Filing & Intake Forms39
▸BISEFILING COVER SHEET19
07/25/2018123551263Open ↗
08/03/2017123352004Open ↗
05/05/2017123069678Open ↗
Showing 3 of 19 on file for this type
▸BISBOROUGH INTAKE FORM11
06/04/2019123352004Open ↗
05/16/2019123352004Open ↗
05/06/2019123352004Open ↗
Showing 3 of 11 on file for this type
▸BISEFILING JOB APPLICATION COVER SHEET6
05/07/2017140637023Open ↗
03/28/2017140621539Open ↗
05/03/2016140481119Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION3
12/26/2018123352004Open ↗
12/12/2018123551263Open ↗
12/11/2017140637023Open ↗
▸Other Documents13
▸BISPLOT DIAGRAM3
08/03/2017123352004Open ↗
Showing 1 of 3 on file for this type
▸DOB NOWManufacturer's Specifications3
08/13/2026M00998061-P1Open ↗
08/13/2026M00998061-P2Open ↗
08/13/2026M00998061-I1Open ↗
▸DOB NOWCalculations3
08/13/2026M00998061-P2Open ↗
08/13/2026M00998061-I1Open ↗
08/13/2026M00998061-P1Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN1
06/27/2022140420970Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type