← Back
BuildNYC
Predominantly retail with other uses
1523 KINGS HIGHWAY
BROOKLYN · Madison · BIN 3182447
💬 Discuss this project
1939Year Built
1Stories
K4Building Class
C4-4AZoning
10,000 sfGross Floor Area
3Units
1 Active Violation ▸FDNY Report ↗
Predominantly retail with other uses · Owner of record: 1523 Kings Highway Associates · 10,241 sf lot · 0.98 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRaising Cane's79p · 3 filings · 20 docs
Floor 1Raising Cane's108p · 7 filings · 20 docs
MezzanineRaising Cane's6p · 1 filing · 20 docs
CellarRaising Cane's99p · 6 filings · 20 docs
Site & exteriorRaising Cane's4p · 3 filings · 7 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1523 Kings Highway Associates303/22/2026
Metropolitan Transportation Authority103/22/2026
Owner of 1632 E 16 St103/22/2026
Integrated Food Systems103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Bohler Engineering NY205/23/2024
New York Design Architects1903/26/2024
R & S Associates208/21/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Bohler Engineering2103/21/2026
Ggonzalez Bohlereng Company403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Action Construction ManagementGeneral Contractor807/08/2026
Action Construction ManagementScaffold303/21/2026
Signstar NYCSign hanger107/08/2026
Boardwalk Plumbing & HeatingFire Protection107/08/2026
Ebm PlumbingPlumbing107/08/2026
Balaton ConsultingSign hanger107/08/2026
City Electrical Sign ErectorsElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Aks Architectural & Engineering19571703/26/2024
Vibranalysis Inc., Dba VT6864208/21/2023
Building Lifecycle
All (107)Filed (22)Permit Issued (11)Signed Off (9)Violation (18)Inspection (9)Objection (8)Special Inspection (30)
04/03/2025
Violation issued (ECB, closed)
Construction
04/03/2025
Violation issued (ECB, open)
Construction
04/03/2025
Violation issued (ECB, closed)
Construction
09/19/2024
Signed off — Alteration
Filing herewith plans for the proposed installation of illuminated non-flashing signage. No change to use, egress, or occupancy.
B01055655-I1
05/28/2024
Permit issued — Sign
B01055655-I1-SG
05/23/2024
Filed — Alteration
Filing herewith plans for the proposed installation of illuminated non-flashing signage. No change to use, egress, or occupancy.
B01055655-I1
05/23/2024
Special inspection requirement — Final
Mudar Khantamr
04/04/2024
Special inspection requirement — Fire-Resistance Rated Construction
Giuseppe Anzalone
04/04/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
04/01/2024
Objection raised — Scope
04/01/2024
Objection resolved — Addressed
03/26/2024
Filed — Alteration CO
APPLICATION FOR CHANGE OF USE FROM EXISTING RETAIL SPACE ON 1ST FLOOR AND CELLAR INTO EATING AND DRINKING ESTABLISHMENT . WORK TO INCLUDE RATED AND NON-RATED INTERIOR PARTITION WORK AT FIRST FLOOR . NO CHANGE TO GROSS FLOOR AREA OR BULK ZONING FLOOR AREA.
B08037356-P4
03/20/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
03/20/2024
Special inspection requirement — Fire-Resistance Rated Construction
Giuseppe Anzalone
12/01/2023
Filed — Alteration CO
APPLICATION FOR CHANGE OF USE FROM EXISTING RETAIL SPACE ON 1ST FLOOR AND CELLAR INTO EATING AND DRINKING ESTABLISHMENT . WORK TO INCLUDE RATED AND NON-RATED INTERIOR PARTITION WORK AT FIRST FLOOR . NO CHANGE TO GROSS FLOOR AREA OR BULK ZONING FLOOR AREA.
B08037356-P3
11/14/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/16/2023
Signed off — Alteration
INSTALLATION OF NEW HVAC EQUIPMENT AND DUCTWORK, INSTALLATION OF NEW KITCHEN COMMERCIAL EXHAUST SYSTEM. NO CHANGE TO USE OCCUPANCY OR EGRESS
B00816971-I1
10/13/2023
Permit issued — Mechanical Systems
B00816971-I1-MS
10/06/2023
Objection resolved — Addressed
10/05/2023
Objection resolved — Addressed
09/22/2023
Signed off — Alteration
RENOVATION OF EXISTING RETAIL SPACE INTO EATING AND DRINKING ESTABLISHMENT INCLUDING NEW NON-LOAD BEARING PARTITIONS AND INTERIOR FINISHES WORK @ PARTIAL CELLAR , FIRST AND ROOF LEVEL.
B00816981-I1
09/21/2023
Objection raised — Fire_Protection
09/21/2023
Objection resolved — Addressed
09/08/2023
Objection raised — Structural
09/08/2023
Objection raised — Scope
09/06/2023
Filed — Alteration
RENOVATION OF EXISTING RETAIL SPACE INTO EATING AND DRINKING ESTABLISHMENT INCLUDING NEW NON-LOAD BEARING PARTITIONS AND INTERIOR FINISHES WORK @ PARTIAL CELLAR , FIRST AND ROOF LEVEL.
B00816981-P1
09/06/2023
Filed — Alteration CO
APPLICATION FOR CHANGE OF USE FROM EXISTING RETAIL SPACE ON 1ST FLOOR AND CELLAR INTO EATING AND DRINKING ESTABLISHMENT . WORK TO INCLUDE RATED AND NON-RATED INTERIOR PARTITION WORK AT FIRST FLOOR . NO CHANGE TO GROSS FLOOR AREA OR BULK ZONING FLOOR AREA.
B08037356-P2
09/06/2023
Special inspection requirement — Exterior lighting power
Giuseppe Anzalone
09/06/2023
Special inspection requirement — Insulation placement and R values
Giuseppe Anzalone
09/06/2023
Special inspection requirement — Interior lighting power
Giuseppe Anzalone
09/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
Giuseppe Anzalone
09/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Giuseppe Anzalone
09/06/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
Giuseppe Anzalone
09/06/2023
Special inspection requirement — Lighting controls
Giuseppe Anzalone
09/06/2023
Special inspection requirement — Air barrier - visual inspection
Giuseppe Anzalone
09/06/2023
Special inspection requirement — Metering
Giuseppe Anzalone
09/06/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
REZA KHAMCY
09/06/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
REZA KHAMCY
09/06/2023
Special inspection requirement — Final
Giuseppe Anzalone
09/06/2023
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
08/30/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/29/2023
Signed off — Alteration
B00857662-I1
08/25/2023
Signed off — Alteration
INSTALLATION OF NEW DUNNAGE AT ROOF AND SUPPORTS FOR PROPOSED CANOPY AT EXTERIOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00816860-I1
08/21/2023
Filed — Alteration
INSTALLATION OF NEW DUNNAGE AT ROOF AND SUPPORTS FOR PROPOSED CANOPY AT EXTERIOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.
B00816860-P1
08/18/2023
Signed off — Alteration
FILING HEREWITH NON STRUCTURAL INTERIOR DEMOLITION ON THE FIRST FLOOR OF AN EXISTING BUILDING.
B08037351-I1
08/18/2023
Signed off — Alteration
RECONFIGURATION OF EXISTING SPRINKLER SYSTEM AND PIPING FOR FOOD SERVICE ESTABLISHMENT. ALL WORK AT FIRST FLOOR AND CELLAR. NO CHANGE TO USE OCCUPANCY OR EGRESS.
B00816856-I1
08/09/2023
Filed — Alteration CO
APPLICATION FOR CHANGE OF USE FROM EXISTING RETAIL SPACE ON 1ST FLOOR AND CELLAR INTO EATING AND DRINKING ESTABLISHMENT . WORK TO INCLUDE RATED AND NON-RATED INTERIOR PARTITION WORK AT FIRST FLOOR . NO CHANGE TO GROSS FLOOR AREA OR BULK ZONING FLOOR AREA.
B08037356-P1
08/09/2023
Special inspection requirement — Public Assembly Emergency Lighting
Giuseppe Anzalone
08/07/2023
Filed — No Work
B00817112-P2
08/07/2023
Special inspection requirement — Public Assembly Emergency Lighting
Giuseppe Anzalone
08/02/2023
Signed off — Alteration
INSTALLATION OF NEW PLUMBING EQUIPMENT AND PIPING FOR FOOD SERVICE ESTABLISHMENT. ALL WORK AT FIRST FLOOR AND CELLAR. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
B00816897-I1
08/01/2023
Special inspection requirement — HVAC-R and service water heating system controls
Giuseppe Anzalone
08/01/2023
Special inspection requirement — Mechanical Systems
Giuseppe Anzalone
08/01/2023
Special inspection requirement — Final
Giuseppe Anzalone
08/01/2023
Special inspection requirement — Energy Code Compliance Inspections
Giuseppe Anzalone
08/01/2023
Special inspection requirement — HVAC-R and service water heating equipment
Giuseppe Anzalone
08/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Giuseppe Anzalone
08/01/2023
Special inspection requirement — Shutoff dampers
Giuseppe Anzalone
07/31/2023
Filed — Alteration
INSTALLATION OF NEW HVAC EQUIPMENT AND DUCTWORK, INSTALLATION OF NEW KITCHEN COMMERCIAL EXHAUST SYSTEM. NO CHANGE TO USE OCCUPANCY OR EGRESS
B00816971-P1
07/31/2023
Special inspection requirement — Final
Giuseppe Anzalone
Latest 60 of 107 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offSignstar NYC05/28/2024
DOB NOWMechanical SystemsSigned-offAction Construction Management10/13/2023
DOB NOWSprinklersSigned-offBoardwalk Plumbing & Heating05/19/2023
DOB NOWGeneral ConstructionPermit IssuedAction Construction Management05/05/2023
DOB NOWSignSigned-offNorth Shore Neon Sign Co04/18/2023
DOB NOWStructuralSigned-offAction Construction Management04/17/2023
DOB NOWPlumbingSigned-offEbm Plumbing02/27/2023
DOB NOWConstruction FenceSigned-offAction Construction Management02/24/2023
DOB NOWMechanical SystemsSigned-offAction Construction Management02/24/2023
DOB NOWGeneral ConstructionSigned-offAction Construction Management02/06/2023
DOB NOWGeneral ConstructionSigned-offAction Construction Management12/16/2022
BISMHISSUEDBNF Contractors02/07/2019
9 projects · most recent 08/11/2025
General Wiring
FiledStatusContractorScope
08/11/2025Permit IssuedAccurate ElectricalGeneral Wiring
06/06/2024CompleteProff Electrical—
06/06/2024CompleteProff Electrical—
08/31/2023CompleteJanon ElectricGeneral Wiring
06/27/2023CompleteCity Electrical Sign Erectors—
06/27/2023CompleteCity Electrical Sign Erectors—
06/27/2023CompleteCity Electrical Sign Erectors—
06/27/2023CompleteCity Electrical Sign Erectors—
06/27/2023CompleteCity Electrical Sign Erectors—
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
11/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
08/30/2023Pass-Final CND-Occupancy InspectionPassView ↗
06/30/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/23/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/14/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/07/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/07/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/15/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 40
DateRequirementInspectorRole
05/23/2024FinalMudar Khantamrprogress
04/04/2024Fire-Resistance Rated ConstructionGiuseppe Anzaloneprogress
04/04/2024Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
03/20/2024Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
03/20/2024Fire-Resistance Rated ConstructionGiuseppe Anzaloneprogress
09/06/2023Exterior lighting powerGiuseppe Anzaloneenergy_progress
09/06/2023Insulation placement and R valuesGiuseppe Anzaloneenergy_progress
09/06/2023Interior lighting powerGiuseppe Anzaloneenergy_progress
09/06/2023Fire-Resistance Rated ConstructionGiuseppe Anzaloneprogress
09/06/2023Fire-Resistant Penetrations and JointsGiuseppe Anzalonespecial
09/06/2023Fenestration and door U-factor and product ratingsGiuseppe Anzaloneenergy_progress
09/06/2023Lighting controlsGiuseppe Anzaloneenergy_progress
09/06/2023Air barrier - visual inspectionGiuseppe Anzaloneenergy_progress
09/06/2023MeteringGiuseppe Anzaloneenergy_progress
09/06/2023Construction Operations Influencing Adjacent StructuresREZA KHAMCYspecial
09/06/2023Structural Stability – Alterations of existing buildingsREZA KHAMCYspecial
09/06/2023FinalGiuseppe Anzaloneprogress
09/06/2023Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
08/09/2023Public Assembly Emergency LightingGiuseppe Anzaloneprogress
08/07/2023Public Assembly Emergency LightingGiuseppe Anzaloneprogress
08/01/2023HVAC-R and service water heating system controlsGiuseppe Anzaloneenergy_progress
08/01/2023Mechanical SystemsGiuseppe Anzalonespecial
08/01/2023FinalGiuseppe Anzaloneprogress
08/01/2023Energy Code Compliance InspectionsGiuseppe Anzaloneprogress
08/01/2023HVAC-R and service water heating equipmentGiuseppe Anzaloneenergy_progress
Latest 25 of 40.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Raising Cane'sRestaurant / Food ServiceCellar, Floor 1, Mezzanine, Roof
Project B01055655 Alteration · LOC Issued · 05/23/2024
Project B00817112 No Work · PA Certificate of Operation Issued · 06/26/2023
Project B00857662 Alteration · LOC Issued · 04/14/2023
Project B08037356 Alteration CO · CO Issued · 03/20/2023
Project B00816897 Alteration · LOC Issued · 01/31/2023
Project B00816981 Alteration · LOC Issued · 01/31/2023
Project B08037351 Alteration · LOC Issued · 12/08/2022
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 121 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch20
08/28/2026B08037351-I1Request digital key ↗
08/27/2026B00816981-P1Request digital key ↗
08/27/2026B00816981-I1Request digital key ↗
Showing 3 of 20 on file for this type
▸DOB NOWPlans/Sketch - Place of Assembly2
08/27/2026B00817112-I1Request digital key ↗
08/27/2026B00817112-P2Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
09/17/2018321836518Open ↗
▸BISWORK PERMIT APPLICATION1
02/08/2019321836518Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B08037356-I1Open ↗
▸Seals & Professional Certifications47
▸DOB NOWDPL-1: Design Professional Seal & Signature22
08/28/2026B08037351-I1Open ↗
08/27/2026B00816981-I1Open ↗
08/27/2026B00816981-P1Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/24/2026B00817112-P2Open ↗
09/02/2026B00816971-P1Open ↗
09/02/2026B00816971-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature10
09/27/2026B00816897-P1Open ↗
09/02/2026B00816971-P1Open ↗
09/01/2026B00816897-I1Open ↗
Showing 3 of 10 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
07/15/2019321836518Open ↗
07/15/2019321836518Open ↗
09/17/2018321836518Open ↗
▸Trade Schedules & Equipment9
▸BISEQUIPMENT USE PERMITS7
07/15/2019321836518Open ↗
07/15/2019321836518Open ↗
07/15/2019321836518Open ↗
Showing 3 of 7 on file for this type
▸BISEQUIPMENT USE APPLICATION/PERMIT2
07/15/2019321836518Open ↗
07/15/2019321836518Open ↗
▸Safety & Tenant Protection7
▸DOB NOWStreet Tree Checklist5
08/13/2026B08037356-P2Open ↗
08/13/2026B08037356-I1Open ↗
08/13/2026B08037356-P4Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off1
08/13/2026B08037356-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B08037356-I1Open ↗
▸Environmental & Asbestos18
▸DOB NOWDEP ACP-5: Asbestos Assessment Report17
08/28/2026B08037351-I1Open ↗
08/27/2026B00816981-I1Open ↗
08/27/2026B00816981-P1Open ↗
Showing 3 of 17 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/17/2018321836518Open ↗
▸Energy Compliance4
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
07/15/2019321836518Open ↗
07/15/2019321836518Open ↗
09/17/2018321836518Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
07/15/2019321836518Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/15/2019321836518Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
07/15/2019321836518Open ↗
09/17/2018321836518Open ↗
▸Filing & Intake Forms3
▸BISEFILING COVER SHEET1
09/17/2018321836518Open ↗
▸BISADDITIONAL INFORMATION1
05/24/2019321836518Open ↗
▸BISBOROUGH INTAKE FORM1
07/15/2019321836518Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification5
08/13/2026B08037356-I1Open ↗
08/13/2026B08037356-P3Open ↗
08/13/2026B08037356-P4Open ↗
Showing 3 of 5 on file for this type