← Back
Primarily 2 family with 1 store or office
1526 BAY RIDGE PARKWAY
BROOKLYN · Bensonhurst · BIN 3160112
💬 Discuss this project
1930Year Built
2Stories
S2Building Class
R4Zoning
4,044 sfGross Floor Area
3Units
Primarily 2 family with 1 store or office · 2,433 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
ArchitectureElectricalMechanicalPlumbing
Floor 25p · 1 filing · 18 docs
Floor 14p · 1 filing · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
02/20/2024$1.5M—1526 HE MANAGEMENT INC → Private party$366/sf building
03/21/2018$1.3M—— → —$315/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP412/12/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor104/09/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371212/12/2025
NIC DESIGN INC9758206/10/2025
Building Lifecycle
All (17)Filed (4)Permit Issued (2)Signed Off (2)Inspection (3)Special Inspection (6)
12/23/2025
Signed off — Alteration
INSTALL PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01237727-I1
12/17/2025
Signed off — Alteration
INSTALL PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01237727-S1
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
12/16/2025
Special inspection requirement — Final
Eric Sun
12/16/2025
Special inspection requirement — Interior lighting power
Eric Sun
12/16/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
12/16/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
12/12/2025
Filed — Alteration
INSTALL PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01237727-P1
12/12/2025
Filed — Alteration
INSTALL PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01237727-P2
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/24/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/11/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/09/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
06/16/2025
Permit issued — Plumbing
B01237727-S1-PL
06/16/2025
Permit issued — General Construction
B01237727-I1-GC
06/10/2025
Filed — Alteration
INSTALL PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01237727-I1
06/10/2025
Filed — Alteration
INSTALL PLUMBING FIXTURES IN THE EXISTING 2 STORY BUILDING. PLUMBING WORKS AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01237727-S1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offT & T PLUMBING INC06/16/2025
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY06/16/2025
1 project · most recent 06/23/2025
General Wiring
FiledStatusContractorScope
06/23/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/24/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/11/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/09/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
12/16/2025Fire-Resistant Penetrations and JointsEric Sunspecial
12/16/2025FinalEric Sunprogress
12/16/2025Interior lighting powerEric Sunenergy_progress
12/16/2025Insulation placement and R valuesEric Sunenergy_progress
12/16/2025Fire-Resistant Penetrations and JointsEric Sunspecial
11/19/2025Fire-Resistant Penetrations and JointsEric Sunspecial
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings4
▸DOB NOWPlans/Sketch4
08/19/2026B01237727-S1Request digital key ↗
08/19/2026B01237727-P1Request digital key ↗
08/19/2026B01237727-I1Request digital key ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications10
▸DOB NOWDPL-1: Design Professional Seal & Signature4
08/19/2026B01237727-S1Open ↗
08/19/2026B01237727-I1Open ↗
08/19/2026B01237727-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/02/2026B01237727-I1Open ↗
09/02/2026B01237727-I1Open ↗
09/02/2026B01237727-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01237727-I1Open ↗
08/28/2026B01237727-P1Open ↗
08/23/2026B01237727-S1Open ↗
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/19/2026B01237727-S1Open ↗
08/19/2026B01237727-I1Open ↗
08/19/2026B01237727-P2Open ↗
Showing 3 of 4 on file for this type