← Back
Two stories - detached, small or mid-size
1527 EAST 2 STREET
BROOKLYN · Mapleton-Midwood (West) · BIN 3173613
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R5Zoning
1,360 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 2,825 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralEquipmentGeneral
Floor 22p · 1 filing · 20 docs
Floor 11 filing · 20 docs
Cellar1p · 1 filing · 20 docs
Site & exterior2p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
KEMM CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
05/24/2022$1.8M—— → —$1,287/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
GARFINKEL ARCHITECT, PLLC508/12/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KEMM CONSTRUCTION INCGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AZ PROFESSIONAL ENGINEERI766408/12/2024
Building Lifecycle
All (38)Filed (5)Permit Issued (2)Violation (1)Special Inspection (30)
08/12/2024
Filed — Alteration
ADDITION AT FIRST FLOOR, SECOND FLOOR AND ATTIC.
B00789984-P3
05/17/2023
Filed — Alteration
ADDITION AT FIRST FLOOR, SECOND FLOOR AND ATTIC.
B00789984-P2
05/15/2023
Special inspection requirement — Concrete - Cast-In-Place
VIJAY KUMAR
05/15/2023
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
VIJAY KUMAR
05/15/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
VIJAY KUMAR
05/15/2023
Special inspection requirement — Mechanical Systems
VIJAY KUMAR
05/15/2023
Special inspection requirement — Post-installed Anchors
VIJAY KUMAR
05/15/2023
Special inspection requirement — Structural Stability – Alterations of existing buildings
VIJAY KUMAR
05/15/2023
Special inspection requirement — Structural Steel - Details
VIJAY KUMAR
05/15/2023
Special inspection requirement — Structural Steel - High Strength Bolting
VIJAY KUMAR
05/15/2023
Special inspection requirement — Structural Steel - Welding
VIJAY KUMAR
05/15/2023
Special inspection requirement — Subgrade Inspections
VIJAY KUMAR
05/15/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Daniel Boss
05/15/2023
Special inspection requirement — Energy Code Compliance Inspections
VIJAY KUMAR
05/15/2023
Special inspection requirement — Final
VIJAY KUMAR
05/15/2023
Special inspection requirement — Fire-Resistance Rated Construction
VIJAY KUMAR
05/15/2023
Special inspection requirement — Footing and Foundation
VIJAY KUMAR
05/15/2023
Special inspection requirement — Preliminary
VIJAY KUMAR
05/15/2023
Special inspection requirement — Structural Wood Frame
VIJAY KUMAR
05/15/2023
Special inspection requirement — Fenestration areas
VIJAY KUMAR
05/15/2023
Special inspection requirement — Air barrier - visual inspection
VIJAY KUMAR
05/15/2023
Special inspection requirement — Insulation placement and R values
VIJAY KUMAR
05/15/2023
Special inspection requirement — Ventilation and air distribution system
VIJAY KUMAR
05/15/2023
Special inspection requirement — HVAC-R and service water heating equipment
VIJAY KUMAR
05/15/2023
Special inspection requirement — Interior lighting power
VIJAY KUMAR
05/15/2023
Special inspection requirement — Fenestration air leakage
VIJAY KUMAR
05/15/2023
Special inspection requirement — Permanent certificate
VIJAY KUMAR
05/15/2023
Special inspection requirement — Electric vehicle service equipment requirements
VIJAY KUMAR
05/15/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
VIJAY KUMAR
05/15/2023
Special inspection requirement — HVAC-R and service water heating system controls
VIJAY KUMAR
05/15/2023
Special inspection requirement — Fenestration and door U-factor and product ratings
VIJAY KUMAR
03/20/2023
Violation issued (ECB, closed)
Construction
01/09/2023
Filed — Alteration
ADDITION AT FIRST FLOOR, SECOND FLOOR AND ATTIC.
B00789984-P1
11/04/2022
Special inspection requirement — Concrete - Cast-In-Place
VIJAY KUMAR
08/23/2022
Filed — Alteration
B00796144-I1
08/23/2022
Permit issued — Construction Fence
B00796144-I1-FN
08/22/2022
Permit issued — Structural
B00789984-I1-GC-CX
08/12/2022
Filed — Alteration
ADDITION AT FIRST FLOOR, SECOND FLOOR AND ATTIC.
B00789984-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWConstruction FencePermit IssuedKEMM CONSTRUCTION INC08/23/2022
DOB NOWStructuralPermit IssuedKEMM CONSTRUCTION INC08/22/2022
BISPLISSUEDMKA PIPING AND HTG CORP08/28/1996
BISOTISSUEDMASTEY BUILDER CO INC08/08/1996
1 project · most recent 08/12/2024
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
08/12/2024Permit IssuedKEMM CONSTRUCTION INCVentilation Systems
Ventilation
Broan-Nutone LP50100DC 80 CFM · Exhaust Fan ×7
1 project · most recent 08/12/2024
Wood
FiledStatusContractorScope
08/12/2024Permit IssuedKEMM CONSTRUCTION INCWood
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
05/15/2023Concrete - Cast-In-PlaceVIJAY KUMARspecial
05/15/2023Exterior Insulation and Finish Systems (EIFS)VIJAY KUMARspecial
05/15/2023Fire-Resistant Penetrations and JointsVIJAY KUMARspecial
05/15/2023Mechanical SystemsVIJAY KUMARspecial
05/15/2023Post-installed AnchorsVIJAY KUMARspecial
05/15/2023Structural Stability – Alterations of existing buildingsVIJAY KUMARspecial
05/15/2023Structural Steel - DetailsVIJAY KUMARspecial
05/15/2023Structural Steel - High Strength BoltingVIJAY KUMARspecial
05/15/2023Structural Steel - WeldingVIJAY KUMARspecial
05/15/2023Subgrade InspectionsVIJAY KUMARspecial
05/15/2023Subsurface Investigations (Borings/Test Pits)Daniel Bossspecial
05/15/2023Energy Code Compliance InspectionsVIJAY KUMARprogress
05/15/2023FinalVIJAY KUMARprogress
05/15/2023Fire-Resistance Rated ConstructionVIJAY KUMARprogress
05/15/2023Footing and FoundationVIJAY KUMARprogress
05/15/2023PreliminaryVIJAY KUMARprogress
05/15/2023Structural Wood FrameVIJAY KUMARprogress
05/15/2023Fenestration areasVIJAY KUMARenergy_progress
05/15/2023Air barrier - visual inspectionVIJAY KUMARenergy_progress
05/15/2023Insulation placement and R valuesVIJAY KUMARenergy_progress
05/15/2023Ventilation and air distribution systemVIJAY KUMARenergy_progress
05/15/2023HVAC-R and service water heating equipmentVIJAY KUMARenergy_progress
05/15/2023Interior lighting powerVIJAY KUMARenergy_progress
05/15/2023Fenestration air leakageVIJAY KUMARenergy_progress
05/15/2023Permanent certificateVIJAY KUMARenergy_progress
Latest 25 of 58.
▾Documents — 53 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/28/2026B00796144-I1Request digital key ↗
08/24/2026B00789984-I1Request digital key ↗
08/24/2026B00789984-P3Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records8
▸DOB NOWZD1: DOB Zoning Diagram4
08/24/2026B00789984-I1Open ↗
08/24/2026B00789984-P3Open ↗
08/24/2026B00789984-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWZoning Exhibit form (1-5)4
08/24/2026B00789984-P3Open ↗
08/24/2026B00789984-P2Open ↗
08/24/2026B00789984-I1Open ↗
Showing 3 of 4 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026B00789984-P1Open ↗
09/01/2026B00789984-P1Open ↗
09/01/2026B00789984-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026B00789984-P1Open ↗
09/01/2026B00789984-P1Open ↗
09/01/2026B00789984-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/28/2026B00796144-I1Open ↗
08/24/2026B00789984-P2Open ↗
08/24/2026B00789984-I1Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos4
▸DOB NOWDEP ACP-5: Asbestos Assessment Report4
08/24/2026B00789984-I1Open ↗
08/24/2026B00789984-P2Open ↗
08/24/2026B00789984-P3Open ↗
Showing 3 of 4 on file for this type
▸Inspections & Test Reports6
▸DOB NOWSOIL REPORT4
08/24/2026B00789984-P3Open ↗
08/24/2026B00789984-I1Open ↗
08/24/2026B00789984-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram1
08/24/2026B00789984-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/24/2026B00789984-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial4
08/24/2026B00789984-P2Open ↗
08/24/2026B00789984-I1Open ↗
08/24/2026B00789984-P3Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone4
08/24/2026B00789984-I1Open ↗
08/24/2026B00789984-P3Open ↗
08/24/2026B00789984-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWPlot Diagram4
08/24/2026B00789984-P3Open ↗
08/24/2026B00789984-P2Open ↗
08/24/2026B00789984-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWAdjoining Owners Notification1
08/24/2026B00789984-I1Open ↗