1924Year Built
5Stories
W1Building Class
R4-1Zoning
85,928 sfGross Floor Area
1Units
LL97 Covered15 Open Violations 0 unresolved · 15 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 105,266 sf lot · 0.82 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingEquipmentGeneralOther
Permit Issued — active, not yet Signed-off
Floor 4Under Construction39p · 1 filing · 20 docs
Floor 3Under Construction42p · 1 filing · 20 docs
Floor 2
Floor 1
Sub-BasementUnder Construction5p · 1 filing · 20 docs
Site & exteriorUnder Construction16p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY3607/08/2026
NY SCHOOL CONSTRUCTION AUTHORITY803/21/2026
NYC SCHOOL CONSTR AUTHORITY203/21/2026
NYC SCHOOL CONSTRUCTION AUTH203/21/2026
NYC DEPARTMENT OF EDUCATION103/22/2026
NYSCA103/21/2026
SCHOOL CONSTRUCTION AUTHO103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
CIARDULLO ARCHITECTURE & ENGINEERIN1107/20/2026
AK CONSULTING SERVICES, INC302/24/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CASO ASSOCIATES2003/21/2026
AK CONSULTING SERVICES603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
2 SAAB CONSTRUCTION INCGeneral Contractor1607/02/2026
ACS SYSTEM ASSOCIATES INC.General Contractor707/08/2026
FRANCO BELLI PLMG&HTG SONPlumbing207/08/2026
JOSHUA ANDERSONElectrical103/21/2026
TRAVALJA, SILVANOElectrical103/21/2026
WIDE FLANGE INCElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
TWIN PEAKS INC.3171207/20/2026
Building Lifecycle
All (135)Filed (14)Permit Issued (21)Violation (60)Inspection (2)Objection (8)Special Inspection (30)
07/24/2026
Objection resolved — Addressed
07/21/2026
Objection raised — Other
07/20/2026
Filed — Alteration
Removal and replacement of a toilet room and janitor's closet. PAA description in comments
B01021088-P7
07/10/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
07/10/2026
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
07/10/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
06/30/2026
Permit issued — Structural
B01021088-S1-ST
06/30/2026
Permit issued — General Construction
B01021088-I1-GC
06/30/2026
Permit issued — Supported Scaffold
B01173261-I1-SF
06/30/2026
Permit issued — Construction Fence
B01173255-I1-FN
04/24/2026
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/24/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/22/2026
Permit issued — Structural
B01021088-S1-ST
04/22/2026
Permit issued — Mechanical Systems
B01021088-S3-MS
03/19/2026
Permit issued — Plumbing
B01021088-S2-PL
02/17/2026
Violation issued (ECB, open)
Construction
02/17/2026
Violation issued (ECB, open)
Construction
02/17/2026
Violation issued (ECB, open)
Construction
02/17/2026
Violation issued (ECB, open)
Construction
02/17/2026
Violation issued (ECB, open)
Construction
12/15/2025
Filed — Alteration
Removal and replacement of a toilet room and janitor's closet. PAA description in comments
B01021088-P6
12/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
12/05/2025
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
12/05/2025
Special inspection requirement — Shutoff dampers
MIKHAIL ZEYGMAN
12/05/2025
Special inspection requirement — Duct leakage testing, insulation and design
MIKHAIL ZEYGMAN
12/05/2025
Special inspection requirement — Maintenance information
MIKHAIL ZEYGMAN
12/05/2025
Special inspection requirement — Mechanical Systems
MIKHAIL ZEYGMAN
12/05/2025
Special inspection requirement — Final
MIKHAIL ZEYGMAN
12/05/2025
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
12/05/2025
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
12/02/2025
Filed — Alteration
Removal and replacement of a toilet room and janitor's closet. PAA description in comments
B01021088-P5
11/25/2025
Special inspection requirement — Mechanical Systems
MIKHAIL ZEYGMAN
11/25/2025
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
11/25/2025
Special inspection requirement — Final
MIKHAIL ZEYGMAN
11/25/2025
Special inspection requirement — Interior lighting power
MIKHAIL ZEYGMAN
11/25/2025
Special inspection requirement — Shutoff dampers
MIKHAIL ZEYGMAN
11/25/2025
Special inspection requirement — Duct leakage testing, insulation and design
MIKHAIL ZEYGMAN
11/25/2025
Special inspection requirement — Maintenance information
MIKHAIL ZEYGMAN
11/25/2025
Special inspection requirement — Lighting controls
MIKHAIL ZEYGMAN
11/24/2025
Filed — Alteration
Removal and replacement of a toilet room and janitor's closet. PAA description in comments
B01021088-P4
10/29/2025
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MIKHAIL ZEYGMAN
10/29/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MIKHAIL ZEYGMAN
10/29/2025
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
10/17/2025
Violation issued (FDNY_NOV, closed)
10/17/2025
Violation issued (FDNY_NOV, closed)
09/09/2025
Violation issued (FDNY_ORDER, closed)
09/09/2025
Violation issued (FDNY_ORDER, closed)
09/09/2025
Violation issued (FDNY_ORDER, closed)
09/09/2025
Violation issued (FDNY_ORDER, closed)
09/09/2025
Violation issued (FDNY_ORDER, closed)
07/15/2025
Permit issued — Structural
B01021088-S1-ST
07/15/2025
Permit issued — General Construction
B01021088-I1-GC
07/15/2025
Permit issued — Construction Fence
B01173255-I1-FN
07/15/2025
Permit issued — Supported Scaffold
B01173261-I1-SF
07/01/2025
Violation issued (FDNY_ORDER, closed)
04/28/2025
Violation issued (ECB, open)
Construction
04/28/2025
Violation issued (ECB, open)
Construction
04/28/2025
Violation issued (ECB, open)
Construction
Latest 60 of 135 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralPermit Issued2 SAAB CONSTRUCTION INC06/30/2026
DOB NOWGeneral ConstructionPermit Issued2 SAAB CONSTRUCTION INC06/30/2026
DOB NOWSupported ScaffoldPermit Issued2 SAAB CONSTRUCTION INC06/30/2026
DOB NOWConstruction FencePermit Issued2 SAAB CONSTRUCTION INC06/30/2026
DOB NOWStructuralPermit IssuedACS SYSTEM ASSOCIATES INC.04/22/2026
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.04/22/2026
DOB NOWPlumbingPermit IssuedFRANCO BELLI PLMG&HTG SON03/19/2026
DOB NOWStructuralPermit Issued2 SAAB CONSTRUCTION INC07/15/2025
DOB NOWGeneral ConstructionPermit Issued2 SAAB CONSTRUCTION INC07/15/2025
DOB NOWConstruction FencePermit Issued2 SAAB CONSTRUCTION INC07/15/2025
DOB NOWSupported ScaffoldPermit Issued2 SAAB CONSTRUCTION INC07/15/2025
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.04/07/2025
DOB NOWStructuralPermit IssuedACS SYSTEM ASSOCIATES INC.04/07/2025
DOB NOWStructuralPermit Issued2 SAAB CONSTRUCTION INC04/01/2025
DOB NOWMechanical SystemsPermit IssuedACS SYSTEM ASSOCIATES INC.03/31/2025
DOB NOWStructuralPermit IssuedACS SYSTEM ASSOCIATES INC.03/28/2025
DOB NOWGeneral ConstructionPermit Issued2 SAAB CONSTRUCTION INC03/25/2025
DOB NOWSupported ScaffoldPermit Issued2 SAAB CONSTRUCTION INC03/24/2025
DOB NOWPlumbingPermit IssuedFRANCO BELLI PLMG&HTG SON03/24/2025
DOB NOWSidewalk ShedPermit Issued2 SAAB CONSTRUCTION INC03/10/2025
DOB NOWConstruction FencePermit Issued2 SAAB CONSTRUCTION INC03/10/2025
BISMHISSUEDU & I MECHANICAL CORP07/07/2023
BISMHISSUEDU & I MECHANICAL CORP07/08/2022
BISPLISSUEDMAR-SAL PLBG & HTG, INC02/22/2022
BISOTISSUEDM.S.T GENERAL CONTRACTING12/29/2021
BISOTISSUEDM.S.T GENERAL CONTRACTING12/29/2021
BISMHISSUEDU & I MECHANICAL CORP07/14/2021
BISMHISSUEDU & I MECHANICAL CORP03/10/2021
BISOTISSUEDM.S.T GENERAL CONTRACTING11/05/2020
BISOTISSUEDM.S.T GENERAL CONTRACTING11/05/2020
BISOTISSUEDM.S.T GENERAL CONTRACTING10/14/2020
BISOTISSUEDM.S.T GENERAL CONTRACTING10/14/2020
BISPLISSUEDMAR-SAL PLBG & HTG, INC08/12/2020
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT06/02/2020
BISEQISSUEDM.S.T GENERAL CONTRACTING05/26/2020
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT05/05/2020
BISOTISSUEDM.S.T GENERAL CONTRACTING10/18/2019
BISOTISSUEDM.S.T GENERAL CONTRACTING10/18/2019
BISEQISSUEDADVANCED CONSTRUCTION EQUIPMENT06/20/2019
BISEQISSUEDM.S.T GENERAL CONTRACTING05/28/2019
+ 31 more permits on file
1 project · most recent 07/20/2026
Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026Permit Issued2 SAAB CONSTRUCTION INCVentilation Systems
Ventilation
Systemair CAE 1000A ERW IQ 800 CFM · Vav Box ×6
Loren Cook 90SQND 350 CFM · Exhaust Fan ×3
1 project · most recent 07/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/20/2026Permit IssuedFRANCO BELLI PLMG&HTG SONGas, Water/Sanitary
17 projects · most recent 05/06/2026
General Wiring
FiledStatusContractorScope
05/06/2026Permit IssuedANCO ELECTL CONTCTNG INCGeneral Wiring
05/01/2026Permit IssuedANCO ELECTL CONTCTNG INCGeneral Wiring
06/26/2025CompleteGEMINI ELECTRIC CO., INC.—
06/24/2025Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
03/05/2025CompleteJAMES F. VOLPE ELEC'LGeneral Wiring
03/05/2025Permit IssuedAUJLA ELECTRIC CORP—
01/23/2025Permit IssuedHIGH VOLT ELEC CORP. OFGeneral Wiring
11/12/2024CompleteEVEREST ELECTRIC CORP—
04/25/2024Permit IssuedA & S ELECTRIC INC.General Wiring
05/12/2022CompleteKATCO ELECTRIC INCGeneral Wiring
02/09/2022CompleteADVANCE LIGHT & PWR ELECTGeneral Wiring
01/10/2022CompleteABM ELECTRIC, INC—
10/01/2021CompleteCHARAN ELEC'L ENTERP'S IN—
03/11/2020CompleteCHARAN ELEC'L ENTERP'S INGeneral Wiring
03/15/2019CompleteCHARAN ELEC'L ENTERP'S IN—
3 projects · most recent 02/24/2025
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
02/24/2025Permit Issued2 SAAB CONSTRUCTION INCFence
02/24/2025Permit Issued2 SAAB CONSTRUCTION INCSidewalk Shed
02/24/2025Permit Issued2 SAAB CONSTRUCTION INCScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
04/24/2026Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/24/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 35
DateRequirementInspectorRole
07/10/2026Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
07/10/2026Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
07/10/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
12/11/2025Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
12/11/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
12/05/2025Lighting controlsMIKHAIL ZEYGMANenergy_progress
12/05/2025Shutoff dampersMIKHAIL ZEYGMANenergy_progress
12/05/2025Duct leakage testing, insulation and designMIKHAIL ZEYGMANenergy_progress
12/05/2025Maintenance informationMIKHAIL ZEYGMANenergy_progress
12/05/2025Mechanical SystemsMIKHAIL ZEYGMANspecial
12/05/2025FinalMIKHAIL ZEYGMANprogress
12/05/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
12/05/2025Interior lighting powerMIKHAIL ZEYGMANenergy_progress
11/25/2025Mechanical SystemsMIKHAIL ZEYGMANspecial
11/25/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
11/25/2025FinalMIKHAIL ZEYGMANprogress
11/25/2025Interior lighting powerMIKHAIL ZEYGMANenergy_progress
11/25/2025Shutoff dampersMIKHAIL ZEYGMANenergy_progress
11/25/2025Duct leakage testing, insulation and designMIKHAIL ZEYGMANenergy_progress
11/25/2025Maintenance informationMIKHAIL ZEYGMANenergy_progress
11/25/2025Lighting controlsMIKHAIL ZEYGMANenergy_progress
10/29/2025Post-installed AnchorsMIKHAIL ZEYGMANspecial
10/29/2025Fire-Resistant Penetrations and JointsMIKHAIL ZEYGMANspecial
10/29/2025HVAC-R and service water piping design and insulationMIKHAIL ZEYGMANenergy_progress
10/29/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
Latest 25 of 35.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 19-BrooklynEducation—
Project B01173258 Alteration · Permit Entire · 02/24/2025
Read from each project’s drawing title blocks and cover sheets and checked twice; a name appears only when it is the occupant, never the owner, landlord or designer.
▾Documents — 116 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
08/22/2026B01173261-I1Request digital key ↗
08/22/2026B01173255-I1Request digital key ↗
08/22/2026B01173258-I1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature26
09/05/2026B01021088-P1Open ↗
08/30/2026B01021088-P2Open ↗
08/30/2026B01021088-P2Open ↗
Showing 3 of 26 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/22/2026B01173258-I1Open ↗
08/22/2026B01021088-P5Open ↗
08/22/2026B01021088-P1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature9
09/05/2026B01021088-P1Open ↗
08/30/2026B01021088-P2Open ↗
08/28/2026B01021088-P4Open ↗
Showing 3 of 9 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/13/2026B01173258-I1Open ↗
08/13/2026B01173255-I1Open ↗
08/13/2026B01173261-I1Open ↗
▸Approvals, Objections & Sign-offs36
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
08/15/2026B01021088-P7Open ↗
08/13/2026B01021088-S1Open ↗
08/13/2026B01021088-P2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
08/15/2026B01021088-P7Open ↗
08/13/2026B01021088-P4Open ↗
08/13/2026B01021088-P6Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDEP Variance (V5) letter4
08/13/2026B01021088-I1Open ↗
08/13/2026B01021088-S1Open ↗
08/13/2026B01021088-S2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)4
08/13/2026B01021088-S1Open ↗
08/13/2026B01021088-S3Open ↗
08/13/2026B01021088-I1Open ↗
Showing 3 of 4 on file for this type
▸Other Documents14
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal14
08/15/2026B01021088-P7Open ↗
08/13/2026B01021088-P4Open ↗
08/13/2026B01021088-P6Open ↗
Showing 3 of 14 on file for this type