← Back
BuildNYC
Over six families without stores
1528 WHITE PLAINS ROAD
BRONX · Parkchester · BIN 2029098
💬 Discuss this project
1929Year Built
4Stories
C1Building Class
R6Zoning
11,200 sfGross Floor Area
12Units
Rent Stabilized4 Active Violations 3 unresolved · 1 paperwork only ▸
Over six families without stores · Owner of record: Arle Realty · 4,230 sf lot · 2.65 FAR built · Flood zone X
Locations of Work
MechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofChimney liner installation4p · 1 filing · 6 docs
Floor 4Chimney liner installation4p · 1 filing · 6 docs
Floor 3Chimney liner installation4p · 1 filing · 6 docs
Floor 2Chimney liner installation4p · 1 filing · 6 docs
Floor 1Chimney liner installation4p · 1 filing · 6 docs
Sub-BasementBoiler replacement5p · 3 filings · 20 docs
Site & exterior1p · 1 filing · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
2206 Realty1407/08/2026
Arle Realty203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
New York & Company406/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
New York & Company803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Ariston Chimneyspecialty_contractor107/08/2026
Bauer MechancialPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
New York Engineering Associates851406/22/2022
Building Lifecycle
05/01/2026
Boiler inspection report filed
Initial · no defects · Accepted
04/30/2026
(a) § hmc:file annual bedbug report in accordance with HPD rule as described on the back of this notice of violation or as described on HPDs…
HPD violation · closed
10/04/2025
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY…
HPD violation · closed
10/04/2025
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST
HPD violation · closed
10/04/2025
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASHBASIN CABINET BASE IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 1st…
HPD violation · closed
158 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offG. Bauer04/26/2022
DOB NOWPlumbingSigned-offMidwood-Raftery Plumbing & Heating09/15/2021
DOB NOWMechanical SystemsSigned-offAriston Chimney09/10/2021
DOB NOWBoiler EquipmentSigned-offG. Bauer09/10/2021
BISBLISSUEDMetropolitan HT & Power05/22/2000
BISBLISSUEDDual Fuel Gas Service11/12/1991
BISFBISSUEDNational Energy Systems02/02/1990
1 project · most recent 06/22/2022
Gas
FiledStatusContractorScope
06/22/2022Signed-offBauer MechancialGas
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
06/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/28/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/24/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
06/16/2022Fire-Resistant Penetrations and JointsLOUIS ARENAspecial
08/24/2021Chimneys and ventsLOUIS ARENAspecial
08/06/2021HVAC-R and service water heating system controlsLOUIS ARENAenergy_progress
08/06/2021Maintenance informationLOUIS ARENAenergy_progress
08/06/2021Mechanical SystemsLOUIS ARENAspecial
08/06/2021FinalLOUIS ARENAprogress
08/06/2021Heating SystemsLOUIS ARENAspecial
08/06/2021HVAC-R and service water heating equipmentLOUIS ARENAenergy_progress
23 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account