← Back
BuildNYC
Over six families without stores
1529 VYSE AVENUE
BRONX · BIN 2010667
💬 Discuss this project
1901Year Built
3Stories
C1Building Class
R7-1Zoning
4,152 sfGross Floor Area
9Units
Rent Stabilized34 Active Violations ▸
Over six families without stores · Owner of record: 1529 SZ · 1,858 sf lot · 2.23 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofProposed interior10p · 1 filing · 20 docs
Floor 3Proposed interior13p · 1 filing · 20 docs
Floor 2Proposed interior14p · 1 filing · 20 docs
Floor 1Proposed interior14p · 1 filing · 20 docs
BasementProposed interior15p · 1 filing · 20 docs
Site & exteriorProposed interior9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1529 SZ103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/14/2023$1.1M—Private party → 1529 SZ LLC$265/sf building
05/05/2016$400K—Private party → 1529 VYSE AVENUE CORP$96/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Adb Associates501/18/2024
Vasilios Artemiou PE108/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prime Piping & Heatingspecialty_contractor707/08/2026
Mabe Groupspecialty_contractor203/21/2026
Mabe Groupspecialty_contractor103/21/2026
Noel WongElectrical103/21/2026
Tower Fire & Electric ServicesElectrical103/21/2026
GSB Plumbing & HeatingGeneral Contractor109/21/2016
GSB Plumbing & HeatingPlumbing109/21/2016
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616601/18/2024
Building Lifecycle
07/23/2024
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
X00546618-I1-GC-CX
01/25/2024
Signed off — Alteration CO
Filing to install Sprinkler system subsequent to primary approved application X00546618-I1
X00546618-S2
01/24/2024
Signed off — Alteration CO
Filing to install Sprinkler system subsequent to primary approved application X00546618-I1
X00546618-S1
01/23/2024
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
01/23/2024
Special inspection requirement — Air barrier - visual inspection
FAHAD FATEH
77 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersSigned-offAmb Mechanical10/25/2023
DOB NOWPlumbingSigned-offPrime Piping & Heating10/24/2023
DOB NOWMechanical SystemsPermit IssuedAB Builders NY09/01/2023
BISPLISSUEDGSB Plumbing & Heating09/21/2016
BISOTISSUEDGSB Plumbing & Heating09/21/2016
BIS—ISSUEDSame11/18/1993
1 project · most recent 01/18/2024
Associated Ducts and Piping Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScope
01/18/2024Permit IssuedMabe GroupAssociated Ducts and Piping, Heating and Air Conditioning Systems, Ventilation Systems
1 project · most recent 01/18/2024
Sprinkler System
FiledStatusContractorScope
01/18/2024Signed-offPrime Piping & HeatingSprinkler System
1 project · most recent 01/18/2024
Storm Water/Sanitary
FiledStatusContractorScope
01/18/2024Signed-offPrime Piping & HeatingStorm, Water/Sanitary
1 project · most recent 01/14/2024
General Wiring
FiledStatusContractorScope
01/14/2024CompleteFried ElectricGeneral Wiring
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
01/19/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/17/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/04/2024Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
01/04/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/21/2023Pass-Final CND-Occupancy InspectionPassView ↗
11/27/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
11/02/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 70
DateRequirementInspectorRole
01/23/2024Heating SystemsFAHAD FATEHspecial
01/23/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/23/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
01/23/2024Mechanical SystemsFAHAD FATEHspecial
01/23/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/23/2024FinalFAHAD FATEHprogress
01/23/2024Energy Code Compliance InspectionsFAHAD FATEHprogress
01/23/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
01/23/2024Electrical motors and elevatorsFAHAD FATEHenergy_progress
01/23/2024Lighting controlsFAHAD FATEHenergy_progress
01/23/2024Air barrier - visual inspectionFAHAD FATEHenergy_progress
01/23/2024Fenestration areasFAHAD FATEHenergy_progress
01/23/2024Lighting in dwelling unitsFAHAD FATEHenergy_progress
01/23/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
01/23/2024Interior lighting powerFAHAD FATEHenergy_progress
01/23/2024Fenestration and door U-factor and product ratingsFAHAD FATEHenergy_progress
01/23/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
01/23/2024Maintenance informationFAHAD FATEHenergy_progress
01/23/2024Insulation placement and R valuesFAHAD FATEHenergy_progress
01/23/2024Fenestration air leakageFAHAD FATEHenergy_progress
01/18/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
01/18/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
01/18/2024Heating SystemsFAHAD FATEHspecial
01/18/2024Mechanical SystemsFAHAD FATEHspecial
01/18/2024Structural Stability – Alterations of existing buildingsFAHAD FATEHspecial
Latest 25 of 70.
63 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account