| Owner | Filings | Most Recent |
|---|---|---|
| PARKSIDE REALTY GROUP | 17 | 07/08/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 01/04/2024 | $1.2M | — | 17237 125 AVE LLC → Private party | $341/sf building |
| 05/10/2022 | $604K | — | BH 770 LLC → 17237 125 AVE LLC | $168/sf building |
| 03/14/2022 | $425K | — | — → — | $118/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| CL ENGINEERING P.C. | 5 | 02/14/2023 |
| Representative | Filings | Most Recent |
|---|---|---|
| METRO DESIGN CONSULTANTS INC | 10 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| PRECISION HOME DEV INC | General Contractor | 4 | 07/08/2026 |
| HAYDEN BROWN CONS CORP | General Contractor | 2 | 03/21/2026 |
| W.R. PLBG AND HTG CORP | Plumbing | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CL ENGINEERING P.C. | 6781 | 4 | 02/14/2023 |
| TRIANGLE INSPECTION & TES | 7495 | 2 | 02/14/2023 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | Structural | Permit Issued | PRECISION HOME DEV INC | 12/20/2022 |
| DOB NOW | Plumbing | Signed-off | W.R. PLBG AND HTG CORP | 10/19/2022 |
| DOB NOW | Construction Fence | Signed-off | PRECISION HOME DEV INC | 09/13/2022 |
| DOB NOW | Construction Fence | Signed-off | HAYDEN BROWN CONS | 06/20/2022 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 02/14/2023 | Permit Issued | PRECISION HOME DEV INC | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Ventilation Hampton Bay 7114-01 50 CFM · Exhaust Fan ×5 Delta Breeze SMT150 150 CFM · Exhaust Fan ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/07/2023 | Complete | POWER SURGE ELECTRIC, INC | General Wiring |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/14/2023 | Permit Issued | PRECISION HOME DEV INC | Steel, Wood |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/14/2023 | Permit Issued | PRECISION HOME DEV INC | Earthwork |
| Date | Type | Result | Report |
|---|---|---|---|
| 03/29/2023 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/18/2023 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 12/21/2022 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 12/21/2022 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 11/28/2022 | Certified Gas-Gas-Piping-Roughing | Certified | View ↗ |
| 11/28/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/28/2022 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 03/16/2023 | Fire-Resistant Penetrations and Joints | CHRISTIAN LOZADA | special |
| 03/16/2023 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | CHRISTIAN LOZADA | special |
| 03/16/2023 | Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities | Rajasekhar Sakhamuri | special |
| 03/16/2023 | Energy Code Compliance Inspections | CHRISTIAN LOZADA | progress |
| 03/16/2023 | Maintenance information | CHRISTIAN LOZADA | energy_progress |
| 03/16/2023 | HVAC-R and service water heating system controls | CHRISTIAN LOZADA | energy_progress |
| 03/16/2023 | HVAC-R and service water heating equipment | CHRISTIAN LOZADA | energy_progress |
| 03/16/2023 | HVAC-R and service water piping design and insulation | CHRISTIAN LOZADA | energy_progress |
| 02/07/2023 | Concrete - Cast-In-Place | CHRISTIAN LOZADA | special |
| 02/07/2023 | Excavations - Sheeting, Shoring, and Bracing | CHRISTIAN LOZADA | special |
| 02/07/2023 | Fire-Resistant Penetrations and Joints | CHRISTIAN LOZADA | special |
| 02/07/2023 | Heating Systems | CHRISTIAN LOZADA | special |
| 02/07/2023 | Masonry | CHRISTIAN LOZADA | special |
| 02/07/2023 | Mechanical Systems | CHRISTIAN LOZADA | special |
| 02/07/2023 | Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation | CHRISTIAN LOZADA | special |
| 02/07/2023 | Structural Stability – Alterations of existing buildings | CHRISTIAN LOZADA | special |
| 02/07/2023 | Structural Steel - Details | CHRISTIAN LOZADA | special |
| 02/07/2023 | Structural Steel - High Strength Bolting | CHRISTIAN LOZADA | special |
| 02/07/2023 | Subgrade Inspections | CHRISTIAN LOZADA | special |
| 02/07/2023 | Subsurface Investigations (Borings/Test Pits) | Rajasekhar Sakhamuri | special |
| 02/07/2023 | Energy Code Compliance Inspections | CHRISTIAN LOZADA | progress |
| 02/07/2023 | Final | CHRISTIAN LOZADA | progress |
| 02/07/2023 | Fire-Resistance Rated Construction | CHRISTIAN LOZADA | progress |
| 02/07/2023 | Footing and Foundation | CHRISTIAN LOZADA | progress |
| 02/07/2023 | Structural Wood Frame | CHRISTIAN LOZADA | progress |