← Back
One story - permanent living quarter
153-14 111 AVENUE
QUEENS · South Jamaica · BIN 4263437
💬 Discuss this project
1985Year Built
1Stories
A2Building Class
R3AZoning
960 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · 5,100 sf lot · 0.19 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectrical
Roof1p · 1 filing · 8 docs
Floor 21p · 1 filing · 8 docs
Floor 11p · 1 filing · 8 docs
Cellar1p · 1 filing · 8 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/26/2017$460K—— → —$479/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT209/16/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT403/21/2026
Building Lifecycle
All (31)Filed (2)Violation (1)Objection (2)Special Inspection (26)
10/14/2025
Objection raised — Scope
09/16/2025
Filed — New Building
Install new plumbing fixtures as per drawings
Q01280158-I1
09/02/2025
Special inspection requirement — Mechanical Systems
09/02/2025
Special inspection requirement — Concrete - Cast-In-Place
09/02/2025
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
09/02/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/02/2025
Special inspection requirement — Masonry
09/02/2025
Special inspection requirement — Subgrade Inspections
09/02/2025
Special inspection requirement — Final
09/02/2025
Special inspection requirement — Footing and Foundation
09/02/2025
Special inspection requirement — Energy Code Compliance Inspections
09/02/2025
Special inspection requirement — Fire-Resistance Rated Construction
09/02/2025
Special inspection requirement — HVAC-R and service water heating equipment
09/02/2025
Special inspection requirement — Maintenance information
09/02/2025
Special inspection requirement — Insulation placement and R values
09/02/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
09/02/2025
Special inspection requirement — Fenestration areas
09/02/2025
Special inspection requirement — Electric vehicle service equipment requirements
09/02/2025
Special inspection requirement — Air barrier - visual inspection
09/02/2025
Special inspection requirement — Air barrier — testing
09/02/2025
Special inspection requirement — HVAC-R and service water heating system controls
09/02/2025
Special inspection requirement — Ventilation and air distribution system
09/02/2025
Special inspection requirement — Interior lighting power
09/02/2025
Special inspection requirement — Duct leakage testing, insulation and design
09/02/2025
Special inspection requirement — Fenestration air leakage
09/02/2025
Special inspection requirement — Permanent certificate
09/02/2025
Special inspection requirement — Metering
09/02/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
08/14/2025
Objection raised — Other
07/30/2025
Filed — Full Demolition
Application filled to full demolition of existing one family dwelling house.
Q01255132-I1
12/13/2019
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 09/16/2025
Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/16/2025——Air Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Fujitsu ASU7RLF1 7,000 BTU · Fan Coil Indoor ×10
Heating
A.O. Smith ENT-50+ 5 kW · Water Heater ×3
Ventilation
Greenheck SP-C50-QD 50 CFM · Exhaust Fan ×5
SP-B90 100 CFM · Exhaust Fan ×2
1 project · most recent 09/16/2025
Storm Water/Sanitary
FiledStatusContractorScope
09/16/2025——Storm, Water/Sanitary
1 project · most recent 09/16/2025
Concrete Wood
FiledStatusContractorScope
09/16/2025——Concrete, Wood
▾Special Inspection Requirements (DOB NOW) — 26
DateRequirementInspectorRole
09/02/2025Mechanical Systems—special
09/02/2025Concrete - Cast-In-Place—special
09/02/2025Excavations - Sheeting, Shoring, and Bracing—special
09/02/2025Fire-Resistant Penetrations and Joints—special
09/02/2025Masonry—special
09/02/2025Subgrade Inspections—special
09/02/2025Final—progress
09/02/2025Footing and Foundation—progress
09/02/2025Energy Code Compliance Inspections—progress
09/02/2025Fire-Resistance Rated Construction—progress
09/02/2025HVAC-R and service water heating equipment—energy_progress
09/02/2025Maintenance information—energy_progress
09/02/2025Insulation placement and R values—energy_progress
09/02/2025Fenestration and door U-factor and product ratings—energy_progress
09/02/2025Fenestration areas—energy_progress
09/02/2025Electric vehicle service equipment requirements—energy_progress
09/02/2025Air barrier - visual inspection—energy_progress
09/02/2025Air barrier — testing —energy_progress
09/02/2025HVAC-R and service water heating system controls—energy_progress
09/02/2025Ventilation and air distribution system—energy_progress
09/02/2025Interior lighting power—energy_progress
09/02/2025Duct leakage testing, insulation and design—energy_progress
09/02/2025Fenestration air leakage—energy_progress
09/02/2025Permanent certificate—energy_progress
09/02/2025Metering—energy_progress
Latest 25 of 26.
▾Documents — 22 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/15/2026Q01255132-I1Request digital key ↗
08/15/2026Q01280158-I1Request digital key ↗
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
03/03/2026440826858Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/03/2026440826858Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q01280158-I1Open ↗
▸Seals & Professional Certifications5
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/18/2026Q01280158-I1Open ↗
08/18/2026Q01280158-S1Open ↗
08/13/2026Q01255132-I1Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/03/2026440826858Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
03/03/2026440826858Open ↗
▸Safety & Tenant Protection2
▸BISSTREET TREE CHECKLIST1
03/03/2026440826858Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026Q01280158-I1Open ↗
▸Inspections & Test Reports2
▸BISCONCRETE - CAST-IN-PLACE1
03/03/2026440826858Open ↗
▸DOB NOWGeotechnical Report (BC 1803.6)1
08/13/2026Q01280158-I1Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET1
03/03/2026440826858Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
03/03/2026440826858Open ↗
▸Other Documents6
▸BISBPP - SUPPORTING DOCUMENTATION2
03/03/2026440826858Open ↗
03/03/2026440826858Open ↗
▸BISRECORDS MGMT FEE PAYMENT RECEIPT1
03/03/2026440826858Open ↗
▸DOB NOWProperty Ownership Certification1
08/15/2026Q01280158-I1Open ↗
▸DOB NOWSite Survey: Initial1
08/13/2026Q01280158-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026Q01280158-I1Open ↗