ECB03/20/2025WEILMCLAIN HW HEATING BOILER HAS HOLE IN CHIMNEY BASE NEEDS CEMENT+BOILER MISSING LWCO+BACKFLOW+CHIMNEY BASE CLEANOUT+ROOM LIGHT+DOOR NOT SELF CLOSING+REMOTE SWITCH DEFECTIVE, MAINTAIN BOILER; HWH DISCHARGE PIPNothing owed — awaiting certificate of correction
ECB07/17/2002WORK W/O A PERMIT. WORK NOTED SIDE : RAISED ROOD APPR. 40' X 60' ON 8'WITH STEEL BEAMS 40' SPAN ON CEMENT BLOCKS. FRONT : BUILT NEW ROOF APPR. 30' X 50' ( FROM ROCKAWAY BLVD SIDE ) WITH STEEL BEAMS REMEDY : OBTNothing owed — awaiting certificate of correction
ECB03/06/2002WORK WITHOUT A PERMIT. WORK NOTED: 1-FROM 134 ST SIDE: RAISED ROOF APPR. 40'X60' ON 8' WITH STEEL BEAMS 40' SPAN ON CEMENT BLOCKS. 2-BUILDING NEW ROOF APPR. 30'X50' (FROM ROCKAWAY SIDE) WITH STEEL BEAMS 30'SPANNothing owed — awaiting certificate of correction
One story retail building · Owner of record: 153-21/27 ROCKAWAY/BD/CP · 5,088 sf lot · 0.96 FAR built · Flood zone X