← Back
One story - permanent living quarter
153-23 123 AVENUE
QUEENS · Baisley Park · BIN 4265421
💬 Discuss this project
1940Year Built
1.5Stories
A2Building Class
R3XZoning
1,042 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
One story - permanent living quarter · Owner of record: LIBERTY KG LLC · 4,000 sf lot · 0.26 FAR built · Flood zone X
Locations of Work
StructuralElectricalPlumbingGeneral
Roof2p · 1 filing · 9 docs
Floor 22p · 2 filings · 20 docs
Floor 12p · 2 filings · 20 docs
Cellar2p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZMIROT1507/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/30/2026$1.2M—LIBERTY KG LLC → Private party$1,132/sf building
09/26/2024$556K—FEDERAL NATIONAL MORTGAGE ASSOCIATION → LIBERTY KG LLC$534/sf building
05/25/2021$445K—CIT BANK, N.A. → FEDERAL NATIONAL MORTGAGE ASSOCIATION$427/sf building
11/30/2018$431K—— → —$414/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC105/05/2026
J.K.DESIGN506/04/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
26 BONIM LLCGeneral Contractor207/08/2026
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
PLBG P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272105/05/2026
AA BUILDING & INSPECTION1519406/04/2025
Building Lifecycle
All (53)Filed (6)Permit Issued (4)Signed Off (2)Violation (4)Inspection (7)Special Inspection (30)
05/08/2026
Permit issued — Solar
Q01396796-I1-SL
05/05/2026
Filed — Alteration
Q01396796-I1
05/05/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
05/05/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
05/04/2026
Special inspection requirement — Final
Walid Abdulla
05/04/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
05/04/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
11/14/2025
Signed off — Alteration
installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app #Q01119038-I1
Q01163420-I1
09/22/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/16/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/08/2025
Signed off — Alteration
Q01125180-I1
06/04/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
Q01119038-P2
05/07/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
05/07/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/02/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/20/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/19/2025
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
Q01119038-P1
02/19/2025
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
BRIAN FLYNN
02/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
02/19/2025
Special inspection requirement — Final
NAVEEN KUMAR
02/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
02/19/2025
Special inspection requirement — Footing and Foundation
Younes Abouyaala
02/19/2025
Special inspection requirement — Structural Wood Frame
Younes Abouyaala
02/19/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
02/19/2025
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
02/19/2025
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
02/19/2025
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
02/19/2025
Special inspection requirement — Interior lighting power
Younes Abouyaala
02/19/2025
Special inspection requirement — Chimneys and vents
Younes Abouyaala
02/19/2025
Special inspection requirement — Permanent certificate
Younes Abouyaala
02/19/2025
Special inspection requirement — Fenestration areas
Younes Abouyaala
02/19/2025
Special inspection requirement — Metering
Younes Abouyaala
02/19/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
02/19/2025
Special inspection requirement — Electric vehicle service equipment requirements
Younes Abouyaala
02/19/2025
Special inspection requirement — Concrete - Cast-In-Place
Younes Abouyaala
02/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
02/19/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
02/19/2025
Special inspection requirement — Subgrade Inspections
Younes Abouyaala
02/18/2025
Violation issued (ECB, closed)
Construction
02/18/2025
Violation issued (ECB, closed)
Construction
02/18/2025
Violation issued (ECB, closed)
Construction
02/18/2025
Violation issued (ECB, closed)
Construction
01/27/2025
Permit issued — Plumbing
Q01163420-I1-PL
01/24/2025
Filed — Alteration
installation of new gas fired equipment and plumbing fixtures for the renovation and conversion of the existing one family dwelling to be converted into a two family dwelling. Filed in conjunction with ALT I app #Q01119038-I1
Q01163420-I1
01/10/2025
Permit issued — Structural
Q01119038-I1-GC-CX
01/06/2025
Special inspection requirement — HVAC-R and service water heating system controls
Younes Abouyaala
01/06/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Younes Abouyaala
01/06/2025
Special inspection requirement — HVAC-R and service water heating equipment
Younes Abouyaala
01/06/2025
Special inspection requirement — Maintenance information
Younes Abouyaala
11/18/2024
Filed — Alteration CO
EXIST 1.5 STORIES (1) ONE FAMILY DWELLING UNIT TO BE HORIZONTALLY AND VERTICALLY ENLARGE, FULLY RENOVATED AND CONVERTED INTO A (2) TWO FAMILY DWELLING UNITS.
Q01119038-I1
10/17/2024
Permit issued — Construction Fence
Q01125180-I1-FN
10/10/2024
Filed — Alteration
Q01125180-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offSUNRUN INSTALLATION SVC05/08/2026
DOB NOWPlumbingSigned-offPLBG P & H INC01/27/2025
DOB NOWStructuralPermit Issued26 BONIM01/10/2025
DOB NOWConstruction FenceSigned-off26 BONIM10/17/2024
3 projects · most recent 07/13/2026
General Wiring
FiledStatusContractorScope
07/13/2026CompleteSUNRUN SOLAR ELECTL CORP—
10/30/2025CompletePOWER SURGE ELECTRIC, INC1 meters, 1 new_meters
09/10/2025CompletePOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 06/04/2025
Concrete Wood
FiledStatusContractorScope
06/04/2025Permit Issued26 BONIM LLCConcrete, Wood
▾Field Inspections (DOB CAP) — 7
DateTypeResultReport
09/22/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
07/16/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
05/07/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
05/07/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/02/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/20/2025Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 32
DateRequirementInspectorRole
05/05/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
05/05/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
05/04/2026FinalWalid Abdullaprogress
05/04/2026Energy Code Compliance InspectionsWalid Abdullaprogress
05/04/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
02/19/2025Subsurface Investigations (Borings/Test Pits)BRIAN FLYNNspecial
02/19/2025Energy Code Compliance InspectionsYounes Abouyaalaprogress
02/19/2025FinalNAVEEN KUMARprogress
02/19/2025Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
02/19/2025Footing and FoundationYounes Abouyaalaprogress
02/19/2025Structural Wood FrameYounes Abouyaalaprogress
02/19/2025Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
02/19/2025Air barrier - visual inspectionYounes Abouyaalaenergy_progress
02/19/2025Insulation placement and R valuesYounes Abouyaalaenergy_progress
02/19/2025Fenestration air leakageYounes Abouyaalaenergy_progress
02/19/2025Interior lighting powerYounes Abouyaalaenergy_progress
02/19/2025Chimneys and ventsYounes Abouyaalaspecial
02/19/2025Permanent certificateYounes Abouyaalaenergy_progress
02/19/2025Fenestration areasYounes Abouyaalaenergy_progress
02/19/2025MeteringYounes Abouyaalaenergy_progress
02/19/2025Maintenance informationYounes Abouyaalaenergy_progress
02/19/2025Electric vehicle service equipment requirementsYounes Abouyaalaenergy_progress
02/19/2025Concrete - Cast-In-PlaceYounes Abouyaalaspecial
02/19/2025Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
02/19/2025Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
Latest 25 of 32.
▾Documents — 57 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026Q01125180-I1Request digital key ↗
08/21/2026Q01163420-I1Request digital key ↗
08/20/2026Q01119038-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q01119038-P2Open ↗
08/13/2026Q01119038-I1Open ↗
08/13/2026Q01119038-P1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp3
08/13/2026Q01119038-P2Open ↗
08/13/2026Q01119038-P1Open ↗
08/13/2026Q01119038-I1Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
09/11/2026Q01396796-I1Open ↗
09/11/2026Q01396796-I1Open ↗
09/11/2026Q01396796-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026Q01125180-I1Open ↗
08/20/2026Q01119038-P2Open ↗
08/20/2026Q01119038-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/11/2026Q01396796-I1Open ↗
09/11/2026Q01396796-I1Open ↗
09/01/2026Q01119038-P1Open ↗
Showing 3 of 5 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist3
08/13/2026Q01119038-P2Open ↗
08/13/2026Q01119038-I1Open ↗
08/13/2026Q01119038-P1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/20/2026Q01119038-P2Open ↗
08/20/2026Q01119038-P1Open ↗
08/20/2026Q01119038-I1Open ↗
Showing 3 of 5 on file for this type
▸Inspections & Test Reports4
▸DOB NOWSOIL REPORT3
08/13/2026Q01119038-P1Open ↗
08/13/2026Q01119038-I1Open ↗
08/13/2026Q01119038-P2Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01119038-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/17/2026Q01396796-I1Open ↗
▸Other Documents13
▸DOB NOWSite Survey: Initial3
08/13/2026Q01119038-P2Open ↗
08/13/2026Q01119038-I1Open ↗
08/13/2026Q01119038-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q01119038-P1Open ↗
08/13/2026Q01119038-P2Open ↗
08/13/2026Q01119038-I1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q01119038-P2Open ↗
08/13/2026Q01119038-I1Open ↗
08/13/2026Q01119038-P1Open ↗
▸DOB NOWProperty Ownership Certification3
08/20/2026Q01119038-P2Open ↗
08/20/2026Q01119038-P1Open ↗
08/20/2026Q01119038-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026Q01119038-I1Open ↗