← Back
Two family converted from one family
153-24 SANFORD AVENUE
QUEENS · East Flushing · BIN 4121476
💬 Discuss this project
1930Year Built
2.75Stories
B3Building Class
R3XZoning
2,243 sfGross Floor Area
2Units
0 Open ViolationsFDNY Report ↗
Two family converted from one family · 4,600 sf lot · 0.49 FAR built · Flood zone X
Locations of Work
Electrical
Roof1p · 1 filing · 9 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYNERGIC DESIGN ARCHITECTS104/16/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ACCORD POWER INCGeneral Contractor103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SYNERGIC DESIGN LLC8561104/16/2024
Building Lifecycle
All (11)Filed (1)Permit Issued (1)Signed Off (1)Violation (3)Special Inspection (5)
06/25/2024
Signed off — Alteration
Installation of 9.02 kw solar energy system on roof. No change of occupancy, use or egress.
Q01033888-I1
04/23/2024
Permit issued — Solar
Q01033888-I1-SL
04/16/2024
Filed — Alteration
Installation of 9.02 kw solar energy system on roof. No change of occupancy, use or egress.
Q01033888-I1
04/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Malathi Ananthakrishnan
04/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Malathi Ananthakrishnan
04/10/2024
Special inspection requirement — Energy Code Compliance Inspections
Malathi Ananthakrishnan
04/10/2024
Special inspection requirement — Final
Malathi Ananthakrishnan
04/10/2024
Special inspection requirement — Air barrier - visual inspection
Malathi Ananthakrishnan
08/15/2008
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/09/2007
Violation issued (ECB, closed)
Quality of Life
04/09/2007
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offACCORD POWER INC04/23/2024
BISOTISSUEDRELIABLE H INC04/02/2007
1 project · most recent 04/22/2024
FiledStatusContractorScope
04/22/2024CompletePOWER SURGE ELECTRIC, INC—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/10/2024Fire-Resistant Penetrations and JointsMalathi Ananthakrishnanspecial
04/10/2024Structural Stability – Alterations of existing buildingsMalathi Ananthakrishnanspecial
04/10/2024Energy Code Compliance InspectionsMalathi Ananthakrishnanprogress
04/10/2024FinalMalathi Ananthakrishnanprogress
04/10/2024Air barrier - visual inspectionMalathi Ananthakrishnanenergy_progress
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01033888-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
09/07/2026Q01033888-I1Open ↗
09/07/2026Q01033888-I1Open ↗
09/07/2026Q01033888-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
09/07/2026Q01033888-I1Open ↗
09/07/2026Q01033888-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026Q01033888-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026Q01033888-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01033888-I1Open ↗