← Back
Auto body / collision or auto repair
153 ATTORNEY STREET
MANHATTAN · BIN 1004279
💬 Discuss this project
1950Year Built
1Stories
G2Building Class
R7AZoning
6,250 sfGross Floor Area
1Units
Auto body / collision or auto repair · Owner of record: LUDLOW GARAGE HOLDINGS LLC · 5,050 sf lot · 1.24 FAR built · Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire ProtectionCivil
Roof4p · 1 filing · 12 docs
Floor 15p · 1 filing · 12 docs
Mezzanine4p · 1 filing · 12 docs
Cellar4p · 1 filing · 12 docs
1 job · most recent 05/28/2026
Air Conditioning Systems Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/28/2026——Air Conditioning Systems, Heating and Air Conditioning Systems
Cooling
Mitsubishi Electric PUZ-AK12NLHZ 12,000 BTU · Condensing Unit ×1
Heat / Cool
Johnson Controls JCI KYG04R2C1AA5A327A1 36,000 BTU · Rooftop Unit ×1
JCI KYG08R2B3AA5A327A1 90,000 BTU · Rooftop Unit ×1
Mitsubishi Electric MXZ-SM36NLHZ 36,000 BTU · Condensing Unit ×1
1 job · most recent 03/01/2021
General Wiring
FiledStatusContractorScope
03/01/2021CompleteE-J ELEC. INSTALLATION COGeneral Wiring
1 job · most recent 05/28/2026
FiledStatusContractorScope
05/28/2026——1 scope_items
Building Lifecycle
All (31)Filed (6)Objection (2)Special Inspection (23)
06/26/2026
Objection resolved — Addressed
06/08/2026
Objection raised — Scope
05/28/2026
Filed — Alteration
Installation of HVAC equipment as per plans submitted, subsequent to DOB NOW # M01332408-I1
M01332408-S5
05/28/2026
Filed — Alteration
Installation of HVAC equipment as per plans submitted, subsequent to DOB NOW # M01332408-I1
M01332408-S3
05/28/2026
Filed — Alteration
Installation of HVAC equipment as per plans submitted, subsequent to DOB NOW # M01332408-I1
M01332408-S4
05/28/2026
Filed — Alteration
Installation of HVAC equipment as per plans submitted, subsequent to DOB NOW # M01332408-I1
M01332408-S2
05/28/2026
Filed — Alteration
Installation of HVAC equipment as per plans submitted, subsequent to DOB NOW # M01332408-I1
M01332408-S1
05/13/2026
Special inspection requirement — Structural Steel - Welding
05/13/2026
Special inspection requirement — Concrete - Cast-In-Place
05/13/2026
Special inspection requirement — Post-installed Anchors
05/13/2026
Special inspection requirement — Structural Steel - Details
05/13/2026
Special inspection requirement — Structural Steel - High Strength Bolting
05/12/2026
Special inspection requirement — Final
05/12/2026
Special inspection requirement — Footing and Foundation
04/28/2026
Special inspection requirement — Energy Code Compliance Inspections
04/28/2026
Special inspection requirement — Post-installed Anchors
04/28/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/24/2026
Special inspection requirement — HVAC-R and service water heating equipment
04/24/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/24/2026
Special inspection requirement — Post-installed Anchors
04/24/2026
Special inspection requirement — Energy Code Compliance Inspections
04/24/2026
Special inspection requirement — Maintenance information
04/24/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
04/24/2026
Special inspection requirement — HVAC-R and service water heating system controls
04/13/2026
Special inspection requirement — Final
04/13/2026
Special inspection requirement — Final
04/13/2026
Special inspection requirement — Mechanical Systems
03/27/2026
Filed — Alteration
Installation of HVAC equipment as per plans submitted, subsequent to DOB NOW # M01332408-I1
M01332408-I1
12/11/2025
Special inspection requirement — Energy Code Compliance Inspections
12/11/2025
Special inspection requirement — Final
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/22/2025$9.8M—— → —$1,568/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JOSEPH VANCE ARCHITECTS605/28/2026
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
BISPLISSUEDAMOK INC11/17/1998
BIS—ISSUEDADVANCED HOME REPAIRS11/12/1998
▾Special Inspection Requirements (DOB NOW) — 23
DateRequirementInspectorRole
05/13/2026Structural Steel - Welding—special
05/13/2026Concrete - Cast-In-Place—special
05/13/2026Post-installed Anchors—special
05/13/2026Structural Steel - Details—special
05/13/2026Structural Steel - High Strength Bolting—special
05/12/2026Final—progress
05/12/2026Footing and Foundation—progress
04/28/2026Energy Code Compliance Inspections—progress
04/28/2026Post-installed Anchors—special
04/28/2026Fire-Resistant Penetrations and Joints—special
04/24/2026HVAC-R and service water heating equipment—energy_progress
04/24/2026Fire-Resistant Penetrations and Joints—special
04/24/2026Post-installed Anchors—special
04/24/2026Energy Code Compliance Inspections—progress
04/24/2026Maintenance information—energy_progress
04/24/2026HVAC-R and service water piping design and insulation—energy_progress
04/24/2026HVAC-R and service water heating system controls—energy_progress
04/13/2026Final—progress
04/13/2026Final—progress
04/13/2026Mechanical Systems—special
12/11/2025Energy Code Compliance Inspections—progress
12/11/2025Final—progress
12/11/2025Fire-Resistant Penetrations and Joints—special
▾Documents — 12 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/17/2026M01332408-I1Request digital key ↗
08/17/2026M01332408-S1Request digital key ↗
08/17/2026M01332408-S4Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications6
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/17/2026M01332408-S5Open ↗
08/17/2026M01332408-S4Open ↗
08/17/2026M01332408-S3Open ↗
Showing 3 of 6 on file for this type