← Back
One family attached or semi-detached
153 CARLYLE GREEN
STATEN ISLAND · Arden Heights-Rossville · BIN 5078671
💬 Discuss this project
1975Year Built
2Stories
A5Building Class
R3-2Zoning
1,300 sfGross Floor Area
1Units
One family attached or semi-detached · 2,025 sf lot · 0.64 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PARKER AND WEST ENGINEERING, PLLC104/02/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUNRUN INSTALLATION SVCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PARKER AND WEST ENGINEERI5272104/02/2026
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
04/16/2026
Permit issued — Solar
S01380860-I1-SL
04/02/2026
Filed — Alteration
FILING HEREWITH TAX ABATEMENT APPLICATION FOR INSTALLATION OF ROOF MOUNTED SOLAR PANELS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
S01380860-I1
04/02/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Walid Abdulla
04/02/2026
Special inspection requirement — Air barrier - visual inspection
Walid Abdulla
03/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walid Abdulla
03/31/2026
Special inspection requirement — Energy Code Compliance Inspections
Walid Abdulla
03/31/2026
Special inspection requirement — Final
Walid Abdulla
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedSUNRUN INSTALLATION SVC04/16/2026
1 project · most recent 04/02/2026
FiledStatusContractorScope
04/02/2026Permit IssuedSUNRUN SOLAR ELECTL CORP—
1 project · most recent 04/02/2026
FiledStatusContractorScope
04/02/2026Permit IssuedSUNRUN INSTALLATION SVC16 panels, 7.2 kw, 336 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
04/02/2026Structural Stability – Alterations of existing buildingsWalid Abdullaspecial
04/02/2026Air barrier - visual inspectionWalid Abdullaenergy_progress
03/31/2026Fire-Resistant Penetrations and JointsWalid Abdullaspecial
03/31/2026Energy Code Compliance InspectionsWalid Abdullaprogress
03/31/2026FinalWalid Abdullaprogress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/17/2026S01380860-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026S01380860-I1Open ↗
08/31/2026S01380860-I1Open ↗
08/31/2026S01380860-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/31/2026S01380860-I1Open ↗
08/31/2026S01380860-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/17/2026S01380860-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/17/2026S01380860-I1Open ↗