← Back
BuildNYC
Primarily 2 family with 1 store or office
153 EAST 51ST STREET
BROOKLYN · BIN 3099687
💬 Discuss this project
1925Year Built
2Stories
S2Building Class
R6Zoning
2,080 sfGross Floor Area
3Units
3 Active Violations 1 old, status unconfirmed ▸FDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 153 Bracha · 2,800 sf lot · 0.74 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipment
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof3058 Bracha LLC4p · 2 filings · 20 docs
Floor 43058 Bracha LLC27p · 2 filings · 20 docs
Floor 33058 Bracha LLC27p · 2 filings · 20 docs
Floor 23058 Bracha LLC27p · 2 filings · 20 docs
Floor 13058 Bracha LLC28p · 2 filings · 20 docs
Cellar3058 Bracha LLC35p · 3 filings · 20 docs
Site & exterior3058 Bracha LLC19p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
3058 Bracha6010/04/2026
153 Bracha403/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/30/2020$460K—Private party → PJ 1 REALTY CORP.$221/sf building
02/11/2020$750K—PJ 1 REALTY CORP. → 153 BRACHA LLC$361/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Chun Engineering Consultant2109/24/2026
Volume Space Consulting101/11/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Real Property Construction and803/21/2026
Cavalry603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Remax ConstructionScaffold903/21/2026
Remax ConstructionGeneral Contractor807/08/2026
Ace Group NYScaffold407/08/2026
B36 ServicesGeneral Contractor303/21/2026
Dynamic Plumbing & SprinklerFire Protection107/08/2026
Testerman Plumbing & HeatingPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AA Building & Inspection15192109/24/2026
Volume Space Consulting I9178101/08/2024
IP Concrete Testing and I6252108/09/2022
Building Lifecycle
All (165)Filed (22)Permit Issued (14)Signed Off (8)Violation (14)Inspection (6)Objection (68)Special Inspection (30)Tax Incentive (3)
09/26/2027
421-a(16) construction completed
09/24/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUCTION WITH B00734772-I
B00734772-A4
09/23/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
09/23/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
09/23/2026
Special inspection requirement — Lighting controls
Younes Abouyaala
09/23/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
09/23/2026
Special inspection requirement — Preliminary
Younes Abouyaala
09/23/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
09/23/2026
Special inspection requirement — Insulation placement and R values
Younes Abouyaala
09/23/2026
Special inspection requirement — Lighting in dwelling units
Younes Abouyaala
09/23/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
09/23/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
09/23/2026
Special inspection requirement — Exterior lighting power
Younes Abouyaala
09/23/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
09/23/2026
Special inspection requirement — Air barrier - visual inspection
Younes Abouyaala
09/23/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
09/23/2026
Special inspection requirement — Fire-Resistance Rated Construction
Younes Abouyaala
09/23/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
09/23/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
09/23/2026
Special inspection requirement — Metering
Younes Abouyaala
06/12/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUCTION WITH B00734772-I
B00734772-A1
04/14/2026
Special inspection requirement — Interior lighting power
Younes Abouyaala
04/14/2026
Special inspection requirement — Maintenance information
Younes Abouyaala
04/14/2026
Special inspection requirement — Metering
Younes Abouyaala
04/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Younes Abouyaala
04/14/2026
Special inspection requirement — Permanent certificate
Younes Abouyaala
04/14/2026
Special inspection requirement — Fenestration areas
Younes Abouyaala
04/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Younes Abouyaala
04/14/2026
Special inspection requirement — Preliminary
Younes Abouyaala
04/14/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
Younes Abouyaala
04/14/2026
Special inspection requirement — Fenestration air leakage
Younes Abouyaala
04/14/2026
Special inspection requirement — Energy Code Compliance Inspections
Younes Abouyaala
04/14/2026
Special inspection requirement — Air barrier — testing
Younes Abouyaala
03/04/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUCTION WITH B00734772-I
B00734772-P9
02/10/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUCTION WITH B00734772-I
B00734772-S5
02/10/2026
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUCTION WITH B00734772-I
B00734772-S7
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
02/05/2026
Objection resolved — Addressed
01/27/2026
Objection raised — Other
01/27/2026
Objection raised — Other
01/27/2026
Objection raised — Other
01/12/2026
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUCTION WITH B00734772-I
B00734772-P8
01/07/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/12/2025
Objection resolved — Addressed
12/09/2025
Objection resolved — Addressed
12/02/2025
Objection resolved — Addressed
11/21/2025
Objection raised — Admin
11/21/2025
Objection raised — Zoning
11/21/2025
Objection raised — Admin
10/09/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUCTION WITH B00734772-I
B00734772-P6
09/18/2025
Signed off — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUCTION WITH B00734772-I
B00734772-S6
09/16/2025
Signed off — Alteration
FOUNDATION FILING IN CONJUNCTION WITH DOB APPLICATION B00734772. NO CHANGE IN USE, EXITS OR OCCUPANCY.
B00734780-I1
09/10/2025
Filed — ALT-CO - New Building with Existing Elements to Remain
APPLICATION FILED HERE TO PROPOSE MECHANICAL SYSTEMS WORK TYPE IN CONJUCTION WITH B00734772-I
B00734772-P7
07/30/2025
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED PER PLANS. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE NYC CODE 2022, NO CHANGES IN USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00989020-I1
07/30/2025
Signed off — Alteration
Installation of support scaffold at the perimeter of new construction. No change in use, egress or occupancy.
B00984630-I1
05/19/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
05/15/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
04/28/2025
Permit issued — General Construction
B00734772-I1-GC
04/24/2025
Signed off — Alteration
PARTIAL DEMOLITION & STRUCTURAL FILING IN CONJUNCTION WITH DOB APPLICATION B00734772. NO CHANGE IN USE, EXITS OR OCCUPANCY.
B00790444-I1
Latest 60 of 165 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedB36 Services04/28/2025
DOB NOWSprinklersSigned-offCitywide Plumbing, Heating & Sprinkler08/30/2024
DOB NOWMechanical SystemsSigned-offRemax Construction08/28/2024
DOB NOWPlumbingSigned-offTesterman Plumbing & Heating08/23/2024
DOB NOWGeneral ConstructionPermit IssuedRemax Construction04/18/2024
DOB NOWConstruction FenceSigned-offRemax Construction04/16/2024
DOB NOWSupported ScaffoldSigned-offAce Group NY04/16/2024
DOB NOWSidewalk ShedSigned-offAce Group NY03/07/2024
DOB NOWStructuralSigned-offRemax Construction01/19/2024
DOB NOWGeneral ConstructionPermit IssuedRemax Construction12/14/2023
DOB NOWConstruction FenceSigned-offRemax Construction04/25/2023
DOB NOWStructuralSigned-offRemax Construction08/25/2022
DOB NOWFoundationSigned-offRemax Construction06/14/2022
DOB NOWConstruction FenceSigned-offRemax Construction08/05/2021
BISOTISSUEDRoss Facilities Services11/21/2001
1 project · most recent 09/24/2026
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
09/24/2026Permit IssuedB36 ServicesHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Mitsubishi Electric MXZ-SM42NAMHZ2-U1 42,000 BTU · Vrf Outdoor ×14
MUZ-GS18NAHZ-U1 18,000 BTU · Heat Pump Outdoor ×4
Ventilation
Panasonic WhisperSense 100 CFM · Exhaust Fan ×36
1 project · most recent 09/24/2026
Sprinkler System
FiledStatusContractorScope
09/24/2026Signed-offDynamic Plumbing & SprinklerSprinkler System
1 project · most recent 09/24/2026
Storm Water/Sanitary
FiledStatusContractorScope
09/24/2026Signed-offTesterman Plumbing & HeatingStorm, Water/Sanitary
3 projects · most recent 07/17/2024
General Wiring
FiledStatusContractorScope
07/17/2024CompleteKings Electric CoGeneral Wiring
04/08/2024CompleteHigh Quality Electric of—
03/31/2024CompleteKings Electric Co10 meters, 10 new_meters
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
01/07/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/19/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
05/15/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/09/2025Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
01/09/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
01/09/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 150
DateRequirementInspectorRole
09/23/2026Fire-Resistant Penetrations and JointsYounes Abouyaalaspecial
09/23/2026Fenestration air leakageYounes Abouyaalaenergy_progress
09/23/2026Lighting controlsYounes Abouyaalaenergy_progress
09/23/2026Lighting in dwelling unitsYounes Abouyaalaenergy_progress
09/23/2026MeteringYounes Abouyaalaenergy_progress
09/23/2026Air barrier — testing Younes Abouyaalaenergy_progress
09/23/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
09/23/2026Fenestration areasYounes Abouyaalaenergy_progress
09/23/2026Exterior lighting powerYounes Abouyaalaenergy_progress
09/23/2026Interior lighting powerYounes Abouyaalaenergy_progress
09/23/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
09/23/2026Permanent certificateYounes Abouyaalaenergy_progress
09/23/2026Maintenance informationYounes Abouyaalaenergy_progress
09/23/2026Fenestration and door U-factor and product ratingsYounes Abouyaalaenergy_progress
09/23/2026PreliminaryYounes Abouyaalaprogress
09/23/2026Fire-Resistance Rated ConstructionYounes Abouyaalaprogress
09/23/2026Energy Code Compliance InspectionsYounes Abouyaalaprogress
09/23/2026Structural Stability – Alterations of existing buildingsYounes Abouyaalaspecial
04/14/2026Fenestration air leakageYounes Abouyaalaenergy_progress
04/14/2026Lighting in dwelling unitsYounes Abouyaalaenergy_progress
04/14/2026Insulation placement and R valuesYounes Abouyaalaenergy_progress
04/14/2026Air barrier — testing Younes Abouyaalaenergy_progress
04/14/2026Lighting controlsYounes Abouyaalaenergy_progress
04/14/2026Exterior lighting powerYounes Abouyaalaenergy_progress
04/14/2026Air barrier - visual inspectionYounes Abouyaalaenergy_progress
Latest 25 of 150.
▾Documents — 293 on file (BIS + DOB NOW)
▸Plans & Drawings22
▸DOB NOWPlans/Sketch22
09/01/2026B00544091-I1Request digital key ↗
08/29/2026B00734780-I1Request digital key ↗
08/29/2026B00734780-P1Request digital key ↗
Showing 3 of 22 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION3
05/15/2025340916334Open ↗
04/11/2025322118944Open ↗
10/09/2009320080158Open ↗
▸Zoning, Tax Lot & Property Records17
▸DOB NOWZD1: DOB Zoning Diagram10
10/05/2026B00734772-A4Open ↗
08/24/2026B00734772-A3Open ↗
Showing 2 of 10 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
10/05/2026B00734772-A4Open ↗
08/24/2026B00734772-A3Open ↗
Showing 2 of 5 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp2
10/05/2026B00734772-A4Open ↗
08/24/2026B00734772-I1Open ↗
▸Seals & Professional Certifications183
▸DOB NOWProgress Inspector Seal & Signature126
10/05/2026B00734772-A4Open ↗
10/05/2026B00734772-A4Open ↗
10/05/2026B00734772-A4Open ↗
Showing 3 of 126 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature29
10/05/2026B00734772-A4Open ↗
10/05/2026B00734772-A4Open ↗
09/23/2026B00734780-P1Open ↗
Showing 3 of 29 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature23
10/05/2026B00734772-A4Open ↗
09/01/2026B00544091-I1Open ↗
08/29/2026B00734780-I1Open ↗
Showing 3 of 23 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
03/10/2025340916334Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
10/09/2009320080158Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
03/10/2025340916334Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
10/09/2009320080158Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
10/09/2009320080158Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING1
10/09/2009320080158Open ↗
▸Safety & Tenant Protection6
▸BISSTREET TREE CHECKLIST2
05/19/2025340916334Open ↗
10/09/2009320080158Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
05/19/2025340916334Open ↗
▸BISBPP: STREET TREES SITE PLAN1
03/10/2025340916334Open ↗
▸BISSTREET TREES SITE PLAN1
05/15/2025340916334Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos21
▸DOB NOWDEP ACP-5: Asbestos Assessment Report20
10/05/2026B00734772-A4Open ↗
08/29/2026B00734780-I1Open ↗
08/28/2026B00790444-P1Open ↗
Showing 3 of 20 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
10/09/2009320080158Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
10/09/2009320080158Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
10/09/2009320080158Open ↗
▸Filing & Intake Forms4
▸BISEFILING COVER SHEET2
04/11/2025322118944Open ↗
10/09/2009320080158Open ↗
▸BISBOROUGH INTAKE FORM1
04/11/2025322118944Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
03/10/2025340916334Open ↗
▸Other Documents34
▸DOB NOWSite Survey: Initial10
10/05/2026B00734772-A4Open ↗
08/24/2026B00734772-A3Open ↗
Showing 2 of 10 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone10
10/05/2026B00734772-A4Open ↗
08/24/2026B00734772-A3Open ↗
Showing 2 of 10 on file for this type
▸DOB NOWProperty Ownership Certification10
10/05/2026B00734772-A4Open ↗
08/24/2026B00734772-P6Open ↗
08/24/2026B00734772-P4Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWPlot Diagram2
08/29/2026B00734780-I1Open ↗
Showing 1 of 2 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION1
05/15/2025340916334Open ↗
▸DOB NOWPARTIAL DEMO: 10-DAY Notice1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type