← Back
BuildNYC
Two family frame
153 FISHER AVENUE
STATEN ISLAND · BIN 5088703
💬 Discuss this project
2019Year Built
2Stories
B2Building Class
R3XZoning
3,960 sfGross Floor Area
2Units
0 Active ViolationsFDNY Report ↗
Two family frame · 7,540 sf lot · 0.53 FAR built · Flood zone X
Locations of Work
ArchitectureFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 23p · 1 filing · 5 docs
Floor 1Proposed Construction3p · 3 filings · 10 docs
Cellar1p · 1 filing · 5 docs
Basement1p · 1 filing · 5 docs
Site & exterior1p · 1 filing · 3 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Rogers Calvanico Group203/22/2021
RS Engineering & Land Surveying203/10/2021
William Montague Engineering103/29/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
R & S Associates103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Nicolosi BrothersScaffold407/08/2026
Nicolosi BrothersGeneral Contractor203/21/2026
Flow-Right Fire SupplyFire Protection207/08/2026
Maximum ContractingScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738203/22/2021
Building Lifecycle
07/28/2021
Signed off — Alteration
install residential sprinkler in two family dwelling unit
S00269314-I1
03/23/2021
Special inspection requirement — Sprinkler Systems
anthony santoro
03/22/2021
Filed — Alteration
install residential sprinkler in two family dwelling unit
S00269314-P1
03/19/2021
Signed off — Alteration
S00019111-I1
03/19/2021
Signed off — Alteration
S00482938-I1
30 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offNicolosi Brothers03/12/2021
DOB NOWSprinklersSigned-offFlow-Right Fire Supply03/02/2021
DOB NOWSprinklersSigned-offFlow-Right Fire Supply06/18/2020
DOB NOWConstruction FenceSigned-offNicolosi Brothers03/17/2020
DOB NOWConstruction FenceSigned-offNicolosi Brothers07/16/2019
DOB NOWConstruction FenceSigned-offNicolosi Brothers04/26/2019
DOB NOWConstruction FenceSigned-offMaximum Contracting06/04/2018
BISPLISSUEDFlow-Right Plumbing & Heating03/02/2021
BIS—ISSUEDNicolosi Brothers03/17/2020
BISPLISSUEDFlow-Right Plumbing & Heating03/03/2020
BIS—ISSUEDNicolosi Brothers04/30/2019
BIS—ISSUEDMaximum Contracting09/19/2018
BIS—ISSUEDN/A06/27/2018
BISEQISSUEDMaximum Contracting09/08/2017
BIS—ISSUEDMaximum Contracting09/08/2017
1 project · most recent 07/08/2020
General Wiring
FiledStatusContractorScope
07/08/2020CompleteTaz Electrical ServicesGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
03/23/2021Sprinkler Systemsanthony santorospecial
03/27/2019FinalWILLIAM MONTAGUEprogress
173 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account