← Back
Two stories - detached, small or mid-size
153 JAFFRAY STREET
BROOKLYN · BIN 3246566
💬 Discuss this project
1930Year Built
2Stories
A1Building Class
R3-1Zoning
2,028 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 6,000 sf lot · 0.34 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 2Under Construction26p · 1 filing · 20 docs
Floor 1Under Construction26p · 1 filing · 20 docs
CellarUnder Construction28p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
DSJ MANAGEMENT307/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/14/2024$1.8M—— → —$863/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZPROEKT ARCHITECTURE607/20/2026
SERDAR CEYLAN ARCHITECT, PC108/29/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HM CONSULTING EXPEDITING1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
US LEVIN GRP CORPGeneral Contractor607/08/2026
SMART PLBG & HTG CORPPlumbing207/08/2026
ALLSTATE RENOVATION INCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEEL CORE ENGINEERING PL1098507/20/2026
Building Lifecycle
All (74)Filed (7)Permit Issued (9)Signed Off (1)Inspection (9)Objection (18)Special Inspection (30)
08/10/2026
Objection resolved — Resolved
08/06/2026
Objection raised — Scope
07/20/2026
Filed — Alteration
proposing to update plumbing fixtures to existing connection
B01151472-P3
07/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
07/16/2026
Special inspection requirement — Interior lighting power
Alexander Sheyman
07/16/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
Alexander Sheyman
07/16/2026
Special inspection requirement — Air barrier — testing
Alexander Sheyman
07/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
Alexander Sheyman
07/16/2026
Special inspection requirement — Fenestration air leakage
Alexander Sheyman
07/16/2026
Special inspection requirement — Fenestration areas
Alexander Sheyman
07/16/2026
Special inspection requirement — Ventilation and air distribution system
Alexander Sheyman
07/16/2026
Special inspection requirement — Air barrier - visual inspection
Alexander Sheyman
07/16/2026
Special inspection requirement — Insulation placement and R values
Alexander Sheyman
07/16/2026
Special inspection requirement — Metering
Alexander Sheyman
07/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
Alexander Sheyman
07/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexander Sheyman
07/16/2026
Special inspection requirement — Fire-Resistance Rated Construction
Alexander Sheyman
07/16/2026
Special inspection requirement — Final
Alexander Sheyman
07/16/2026
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
07/16/2026
Special inspection requirement — Mechanical Systems
Alexander Sheyman
06/05/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/09/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2026
Permit issued — Plumbing
B01151472-S2-PL
01/28/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
01/16/2026
Permit issued — General Construction
B01151472-I1-MS
01/13/2026
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
01/06/2026
Permit issued — Construction Fence
B01151472-S1-FN
01/06/2026
Permit issued — General Construction
B01151472-I1-GC
08/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
08/15/2025
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
08/15/2025
Special inspection requirement — Maintenance information
Alexander Sheyman
08/15/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexander Sheyman
08/04/2025
Filed — Alteration
proposing to update plumbing fixtures to existing connection
B01151472-P2
08/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Alexander Sheyman
08/04/2025
Special inspection requirement — Energy Code Compliance Inspections
Alexander Sheyman
08/04/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Alexander Sheyman
08/04/2025
Special inspection requirement — Maintenance information
Alexander Sheyman
07/22/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
03/07/2025
Special inspection requirement — Mechanical Systems
Alexander Sheyman
03/07/2025
Special inspection requirement — Interior lighting power
Alexander Sheyman
03/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
Alexander Sheyman
03/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Alexander Sheyman
03/07/2025
Special inspection requirement — Fenestration air leakage
Alexander Sheyman
03/06/2025
Objection raised — Other
03/06/2025
Objection resolved — Addressed
03/04/2025
Permit issued — Construction Fence
B01151472-S1-FN
02/27/2025
Filed — Alteration
proposing to update plumbing fixtures to existing connection
B01151472-P1
01/27/2025
Permit issued — Plumbing
B01151472-S2-PL
01/23/2025
Permit issued — Mechanical Systems
B01151472-I1-MS
01/23/2025
Permit issued — General Construction
B01151472-I1-GC
12/18/2024
Filed — Alteration
proposing to update plumbing fixtures to existing connection
B01151472-S2
12/18/2024
Filed — Alteration
proposing to update plumbing fixtures to existing connection
B01151472-S1
12/16/2024
Filed — Alteration
proposing to update plumbing fixtures to existing connection
B01151472-I1
09/30/2024
Signed off — Alteration
THE APPLICATION IS FILED TO SUPERCEDE THE PRE-BIS APPLICATION ALT 194-87. NO CHANGE IS PROPOSED TO THE ORIGINAL APPROVED PRE-BIS APPLICATION (ALT 194-87) AND ALL THE INFORMATION IS TRANSFERRED TO DOB NOW SYSTEM.
B01097552-I1
09/13/2024
Permit issued — General Construction
B01097552-I1-GC
09/11/2024
Objection resolved — Addressed
Latest 60 of 74 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedSMART PLBG & HTG CORP04/03/2026
DOB NOWGeneral ConstructionSigned-offUS LEVIN GRP CORP01/16/2026
DOB NOWConstruction FenceSigned-offUS LEVIN GRP CORP01/06/2026
DOB NOWGeneral ConstructionPermit IssuedUS LEVIN GRP CORP01/06/2026
DOB NOWConstruction FenceSigned-offUS LEVIN GRP CORP03/04/2025
DOB NOWPlumbingPermit IssuedSMART PLBG & HTG CORP01/27/2025
DOB NOWMechanical SystemsSigned-offUS LEVIN GRP CORP01/23/2025
DOB NOWGeneral ConstructionPermit IssuedUS LEVIN GRP CORP01/23/2025
DOB NOWGeneral ConstructionSigned-offALLSTATE RENOVATION INC09/13/2024
BISOTISSUEDON CENTER CONSTRUCTION INC03/09/1998
1 job · most recent 07/20/2026
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
07/20/2026Signed-offUS LEVIN GRP CORPAir Conditioning Systems
1 job · most recent 07/20/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/20/2026Permit IssuedSMART PLBG & HTG CORPGas, Water/Sanitary
2 jobs · most recent 07/28/2026
General Wiring
FiledStatusContractorScope
07/28/2026Permit IssuedKINGS ELECTRIC CO., INC.General Wiring
02/26/2025Pending PaymentKINGS ELECTRIC CO., INC.—
1 job · most recent 07/20/2026
Fence
FiledStatusContractorScope
07/20/2026Permit IssuedSMART PLBG & HTG CORPFence
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
06/05/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/09/2026Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
01/28/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
01/13/2026Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
07/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 42
DateRequirementInspectorRole
07/16/2026Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
07/16/2026Interior lighting powerAlexander Sheymanenergy_progress
07/16/2026Fenestration and door U-factor and product ratingsAlexander Sheymanenergy_progress
07/16/2026Air barrier — testing Alexander Sheymanenergy_progress
07/16/2026HVAC-R and service water heating equipmentAlexander Sheymanenergy_progress
07/16/2026Fenestration air leakageAlexander Sheymanenergy_progress
07/16/2026Fenestration areasAlexander Sheymanenergy_progress
07/16/2026Ventilation and air distribution systemAlexander Sheymanenergy_progress
07/16/2026Air barrier - visual inspectionAlexander Sheymanenergy_progress
07/16/2026Insulation placement and R valuesAlexander Sheymanenergy_progress
07/16/2026MeteringAlexander Sheymanenergy_progress
07/16/2026HVAC-R and service water heating system controlsAlexander Sheymanenergy_progress
07/16/2026HVAC-R and service water piping design and insulationAlexander Sheymanenergy_progress
07/16/2026Fire-Resistance Rated ConstructionAlexander Sheymanprogress
07/16/2026FinalAlexander Sheymanprogress
07/16/2026Energy Code Compliance InspectionsAlexander Sheymanprogress
07/16/2026Mechanical SystemsAlexander Sheymanspecial
08/15/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
08/15/2025Energy Code Compliance InspectionsAlexander Sheymanprogress
08/15/2025Maintenance informationAlexander Sheymanenergy_progress
08/15/2025HVAC-R and service water piping design and insulationAlexander Sheymanenergy_progress
08/04/2025Fire-Resistant Penetrations and JointsAlexander Sheymanspecial
08/04/2025Energy Code Compliance InspectionsAlexander Sheymanprogress
08/04/2025HVAC-R and service water piping design and insulationAlexander Sheymanenergy_progress
08/04/2025Maintenance informationAlexander Sheymanenergy_progress
Latest 25 of 42.
▾Documents — 36 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/23/2026B01151472-I1Request digital key ↗
08/23/2026B01151472-S1Request digital key ↗
08/23/2026B01151472-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
07/12/2024300709696Open ↗
▸Seals & Professional Certifications19
▸DOB NOWProgress Inspector Seal & Signature8
09/19/2026B01151472-P3Open ↗
09/19/2026B01151472-P3Open ↗
08/29/2026B01151472-S2Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/23/2026B01151472-S1Open ↗
08/23/2026B01151472-I1Open ↗
08/23/2026B01151472-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/19/2026B01151472-P3Open ↗
08/29/2026B01151472-S2Open ↗
08/23/2026B01151472-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026B01151472-I1Open ↗
08/23/2026B01151472-P2Open ↗
08/23/2026B01151472-S2Open ↗
Showing 3 of 6 on file for this type
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
07/12/2024300709696Open ↗
07/10/2024300709696Open ↗
▸Approvals, Objections & Sign-offs1
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
07/15/2024300709696Open ↗