Five to six families
153 LEFFERTS PLACE
BROOKLYN · BIN 3057736
💬 Discuss this project
1931Year Built
3Stories
C2Building Class
R6BZoning
2,970 sfGross Floor Area
5Units
Rent Stabilized23 Open Violations 22 unresolved · 1 paperwork only ▸FDNY Report ↗
Five to six families · 2,750 sf lot · 1.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire Protection
Permit Issued — active, not yet Signed-off
RoofUnder Construction10p · 2 filings · 20 docs
Bulkhead1p · 1 filing · 20 docs
Floor 3Under Construction8p · 2 filings · 20 docs
Floor 2Under Construction7p · 1 filing · 19 docs
Floor 1Under Construction8p · 2 filings · 20 docs
CellarUnder Construction9p · 2 filings · 20 docs
BasementUnder Construction9p · 2 filings · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
07/13/2023$2.1M—— → —$716/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
DOWNTOWN ENGINEERS304/14/2025
MARTOS ENGINEERING304/10/2025
CORTNEY WALLESTON ARCHITECT, PC212/13/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CLARKE CONSTRUCTION CONSULTANTS603/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SPRICE CONTRACTING INCGeneral Contractor307/08/2026
CROSSWIRE ELECTRICAL INCElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CHRISTIAN L. MARTOS ENGIN5965102/21/2025
CORTNEY WALLESTON ARCHITE3881212/13/2024
Building Lifecycle
All (129)Filed (8)Permit Issued (3)Signed Off (1)Violation (57)Objection (30)Special Inspection (30)
05/05/2026
Violation issued (HPD, open)
A
01/16/2026
Permit issued — General Construction
B01124865-I1-GC
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/17/2025
Signed off — Alteration
Interior non load bearing selective finish and partition removal.
B01064470-I1
09/16/2025
Permit issued — General Construction
B01124865-I1-GC
08/06/2025
Objection resolved — Addressed
06/10/2025
Violation issued (HPD, open)
A
05/28/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/23/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/20/2025
Objection resolved — Addressed
05/19/2025
Objection raised — Other
05/19/2025
Objection raised — Other
05/19/2025
Objection raised — Other
05/15/2025
Objection resolved — Addressed
05/15/2025
Objection resolved — Addressed
05/14/2025
Objection raised — Fire_Protection
05/14/2025
Objection raised — Fire_Protection
05/13/2025
Objection resolved — Addressed
05/08/2025
Objection resolved — Addressed
05/01/2025
Objection resolved — Addressed
05/01/2025
Objection resolved — Addressed
04/22/2025
Objection raised — Plumbing
04/22/2025
Objection raised — Plumbing
04/22/2025
Objection raised — Plumbing
04/22/2025
Objection raised — Cost
04/22/2025
Objection raised — Cost
04/22/2025
Objection raised — Cost
04/16/2025
Objection raised — Admin
04/15/2025
Objection raised — Admin
04/14/2025
Filed — Alteration
Interior non load bearing selective finish and partition removal.
B01064470-S5
04/14/2025
Filed — Alteration
Interior non load bearing selective finish and partition removal.
B01064470-S6
04/14/2025
Filed — Alteration
Interior non load bearing selective finish and partition removal.
B01064470-S4
04/14/2025
Special inspection requirement — Shutoff dampers
04/14/2025
Special inspection requirement — Maintenance information
04/14/2025
Special inspection requirement — HVAC-R and service water heating system controls
04/14/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
04/14/2025
Special inspection requirement — HVAC-R and service water heating equipment
04/14/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/14/2025
Special inspection requirement — Ventilation and air distribution system
04/11/2025
Objection resolved — Addressed
04/10/2025
Filed — Alteration
Interior non load bearing selective finish and partition removal.
B01064470-S3
04/09/2025
Filed — Alteration
Interior non load bearing selective finish and partition removal.
B01064470-S2
04/08/2025
Special inspection requirement — HVAC-R and service water heating system controls
Raimundo Ramos
04/08/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Raimundo Ramos
04/08/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
04/08/2025
Special inspection requirement — HVAC-R and service water heating equipment
Raimundo Ramos
04/08/2025
Special inspection requirement — Maintenance information
Raimundo Ramos
03/27/2025
Special inspection requirement — Mechanical Systems
03/27/2025
Special inspection requirement — Final
02/28/2025
Objection raised — Admin
02/21/2025
Filed — Alteration
Interior non load bearing selective finish and partition removal.
B01064470-S1
02/19/2025
Special inspection requirement — Construction Utilizing CLT or SCL, Type IV
Christian Martos
02/19/2025
Special inspection requirement — Masonry
Christian Martos
02/19/2025
Special inspection requirement — Wood – Seismic Resistance
Christian Martos
02/17/2025
Special inspection requirement — Structural Wood Frame
Christian Martos
02/17/2025
Special inspection requirement — Concrete - Cast-In-Place
Christian Martos
02/17/2025
Special inspection requirement — Post-installed Anchors
Christian Martos
Latest 60 of 129 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedSPRICE CONTRACTING INC01/16/2026
DOB NOWGeneral ConstructionPermit IssuedSPRICE CONTRACTING INC09/16/2025
DOB NOWGeneral ConstructionSigned-offSPRICE CONTRACTING INC08/05/2024
1 project · most recent 04/14/2025
Heating and Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
04/14/2025Signed-offSPRICE CONTRACTING INCHeating and Air Conditioning Systems, Ventilation Systems
Heat / Cool
Ventilation
Renewaire HE05IN 270 CFM · Erv ×1
1 project · most recent 04/14/2025
Sprinkler System
FiledStatusContractorScope
04/14/2025——Sprinkler System
1 project · most recent 04/14/2025
Water/Sanitary
FiledStatusContractorScope
04/14/2025——Water/Sanitary
1 project · most recent 12/19/2025
General Wiring
FiledStatusContractorScope
12/19/2025Permit IssuedCROSSWIRE ELECTRICAL INCGeneral Wiring
1 project · most recent 04/14/2025
Steel Masonry Wood
FiledStatusContractorScope
04/14/2025Signed-offSPRICE CONTRACTING INCSteel, Masonry, Wood
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
04/14/2025Shutoff dampers—energy_progress
04/14/2025Maintenance information—energy_progress
04/14/2025HVAC-R and service water heating system controls—energy_progress
04/14/2025HVAC-R and service water piping design and insulation—energy_progress
04/14/2025HVAC-R and service water heating equipment—energy_progress
04/14/2025Fire-Resistant Penetrations and Joints—special
04/14/2025Ventilation and air distribution system—energy_progress
04/08/2025HVAC-R and service water heating system controlsRaimundo Ramosenergy_progress
04/08/2025HVAC-R and service water piping design and insulationRaimundo Ramosenergy_progress
04/08/2025Fire-Resistant Penetrations and Joints—special
04/08/2025HVAC-R and service water heating equipmentRaimundo Ramosenergy_progress
04/08/2025Maintenance informationRaimundo Ramosenergy_progress
03/27/2025Mechanical Systems—special
03/27/2025Final—progress
02/19/2025Construction Utilizing CLT or SCL, Type IVChristian Martosspecial
02/19/2025MasonryChristian Martosspecial
02/19/2025Wood – Seismic ResistanceChristian Martosspecial
02/17/2025Structural Wood FrameChristian Martosprogress
02/17/2025Concrete - Cast-In-PlaceChristian Martosspecial
02/17/2025Post-installed AnchorsChristian Martosspecial
02/17/2025Structural Stability – Alterations of existing buildingsChristian Martosspecial
02/17/2025Subgrade InspectionsChristian Martosspecial
02/17/2025Subsurface Conditions – Fill Placement & In-Place DensityChristian Martosspecial
02/17/2025Structural Cold-Formed SteelChristian Martosspecial
02/17/2025Structural Stability – Alterations of existing buildingsChristian Martosspecial
Latest 25 of 45.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026B01124865-I1Request digital key ↗
08/22/2026B01064470-S6Request digital key ↗
08/22/2026B01064470-S5Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
04/08/2019321942056Open ↗
▸Seals & Professional Certifications25
▸DOB NOWProgress Inspector Seal & Signature13
09/02/2026B01064470-S1Open ↗
09/01/2026B01064470-I1Open ↗
08/26/2026B01124865-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/13/2026B01064470-I1Open ↗
08/13/2026B01064470-S2Open ↗
08/13/2026B01064470-S4Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
09/02/2026B01064470-S1Open ↗
09/01/2026B01064470-I1Open ↗
08/26/2026B01124865-I1Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/08/2019321942056Open ↗
▸Trade Schedules & Equipment1
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
04/08/2019321942056Open ↗
▸Safety & Tenant Protection10
▸DOB NOWHPD-3: Single Room Occupancy Multiple Dwelling (SRO MD) Anti-Harassment Checklist8
08/13/2026B01064470-I1Open ↗
08/13/2026B01064470-S5Open ↗
08/13/2026B01064470-S4Open ↗
Showing 3 of 8 on file for this type
▸BISSTREET TREE CHECKLIST1
04/08/2019321942056Open ↗
▸DOB NOWStreet Tree Checklist1
08/13/2026B01124865-I1Open ↗
▸Environmental & Asbestos9
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
08/13/2026B01064470-S3Open ↗
08/13/2026B01064470-S1Open ↗
08/13/2026B01064470-S4Open ↗
Showing 3 of 8 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
04/08/2019321942056Open ↗
▸Approvals, Objections & Sign-offs1
▸BISSCHEDULE A - OCCUPANCY / USE1
04/08/2019321942056Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/08/2019321942056Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/08/2019321942056Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/13/2026B01124865-I1Open ↗