← Back
Walk-up cooperative
153 WEST 80 STREET
MANHATTAN · Upper West Side (Central) · BIN 1031960
💬 Discuss this project
1896Year Built
5Stories
C6Building Class
R8BZoning
14,100 sfGross Floor Area
20Units
Rent Stabilized32 Open Violations ▸
Walk-up cooperative · Owner of record: 80TH INC · 3,576 sf lot · 3.94 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Floor 58p · 2 filings · 18 docs
Floor 4
Floor 3
Floor 24p · 1 filing · 9 docs
Floor 13p · 1 filing · 9 docs
Cellar3p · 1 filing · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCK GROUP NY CORP703/22/2026
80TH INC203/22/2026
A DAMIAN CONSTRUCTION103/22/2026
153 W 801703/21/2026
153W 80 LTD-TRAYMORE-POE MGMT703/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STEPHAN R THIMME ARCHITECT PC204/07/2026
JOHN PATRICK CUNNINGHAM310/27/2021
GGA103/20/2020
ASIF JAMIL, RA107/30/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
JENNY FLORES EXPEDITING303/21/2026
BERZAK SCHOEN CONSULTANTS LTD.203/21/2026
GREEN STUDIO203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCK GROUP NY CORPGeneral Contractor603/21/2026
ARX DESIGN MANAGEMENT LLCGeneral Contractor407/08/2026
L.D.M. ELECTL CONTRS INCElectrical103/22/2026
FADJOL KOLAGeneral Contractor106/28/2026
21 PLUMBING & HEATING INCPlumbing107/08/2026
BYPASS MECHANICAL CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
STEPHAN R THIMME ARCHITEC3696204/07/2026
JOADEM CORPORATION4350102/03/2021
Building Lifecycle
All (100)Filed (7)Permit Issued (7)Signed Off (1)Violation (46)Inspection (3)Objection (30)Special Inspection (6)
06/22/2026
Permit issued — General Construction
M01370274-I1-GC
04/29/2026
Violation issued (HPD, closed)
A
04/14/2026
Objection raised — Scope
04/14/2026
Objection resolved — Addressed
04/13/2026
Objection raised — Scope
04/13/2026
Objection resolved — Addressed
04/07/2026
Filed — Alteration
PARTIAL RENOVATION OF EXISTING APARTMENT AT CELLAR, FIRST AND 2ND FLOOR LEVELS OF 153 WEST 80TH STREET, AS PER ATTACHED PLANS. NO CHANGE IN OCCUPANCY, USE, EGRESS, FLOOR AREA, VOLUME OR FIRE SAFETY.
M01370274-S1
04/07/2026
Filed — Alteration
PARTIAL RENOVATION OF EXISTING APARTMENT AT CELLAR, FIRST AND 2ND FLOOR LEVELS OF 153 WEST 80TH STREET, AS PER ATTACHED PLANS. NO CHANGE IN OCCUPANCY, USE, EGRESS, FLOOR AREA, VOLUME OR FIRE SAFETY.
M01370274-I1
03/13/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
stephan thimme
02/22/2026
Violation issued (HPD, closed)
B
02/22/2026
Violation issued (HPD, closed)
A
06/16/2025
Violation issued (HPD, open)
B
06/16/2025
Violation issued (HPD, open)
A
04/21/2024
Violation issued (HPD, open)
B
04/21/2024
Violation issued (HPD, open)
A
01/18/2023
Signed off — Alteration
INSTALLATION OF SIDEWALK SHED . SIDEWALK SHED LIVE LOAD 300 PSF. ALL EQUIPMENT COMPLY WITH CHAPTER #33 OF THE 2014 CODE NO CHANGE TO USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M00063815-I1
07/12/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
06/29/2022
Permit issued — General Construction
M00453302-I1-MS
10/27/2021
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION/COMBINATION OF UNITS 5B/5C IN COMPLIANCE WITH TPPN 03/97. INSTALLATION OF PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00453358-P1
07/23/2021
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
07/23/2021
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/09/2021
Permit issued — Plumbing
M00453358-I1-PL
05/07/2021
Permit issued — General Construction
M00453302-I1-GC
03/05/2021
Objection raised — Other
03/05/2021
Objection resolved — Addressed
03/03/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/26/2021
Objection raised — Other
02/26/2021
Objection resolved — Addressed
02/26/2021
Objection raised — Other
02/26/2021
Objection resolved — Addressed
02/26/2021
Objection raised — Other
02/26/2021
Objection resolved — Addressed
02/26/2021
Objection raised — Other
02/26/2021
Objection resolved — Addressed
02/26/2021
Objection raised — Other
02/26/2021
Objection resolved — Addressed
02/26/2021
Objection raised — Other
02/26/2021
Objection resolved — Addressed
02/23/2021
Objection raised — Other
02/23/2021
Objection resolved — Addressed
02/18/2021
Objection raised — Other
02/18/2021
Objection resolved — Addressed
02/12/2021
Special inspection requirement — HVAC-R and service water heating equipment
OLULADE ADEMOKUN
02/09/2021
Objection raised — Other
02/09/2021
Objection resolved — Addressed
02/09/2021
Objection raised — Other
02/09/2021
Objection resolved — Addressed
02/09/2021
Objection raised — Other
02/09/2021
Objection resolved — Addressed
02/09/2021
Objection raised — Other
02/09/2021
Objection resolved — Addressed
02/03/2021
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION/COMBINATION OF UNITS 5B/5C IN COMPLIANCE WITH TPPN 03/97. INSTALLATION OF NEW SPLIT SYSTEM HVAC UNITS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00453302-I1
02/03/2021
Filed — Alteration
HEREBY FILING FOR THE INTERIOR RENOVATION/COMBINATION OF UNITS 5B/5C IN COMPLIANCE WITH TPPN 03/97. INSTALLATION OF PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00453358-I1
01/13/2021
Special inspection requirement — Energy Code Compliance Inspections
John Cunningham
01/13/2021
Special inspection requirement — Lighting in dwelling units
John Cunningham
01/13/2021
Special inspection requirement — Mechanical Systems
OLULADE ADEMOKUN
01/13/2021
Special inspection requirement — Final
John Cunningham
12/08/2020
Violation issued (ECB, closed)
Construction
10/15/2020
Permit issued — Plumbing
M00306037-I1-PL
07/13/2020
Violation issued (HPD, open)
B
Latest 60 of 100 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedFADJOL KOLA06/22/2026
DOB NOWGeneral ConstructionPermit IssuedARX DESIGN MANAGEMENT LLC06/29/2022
DOB NOWPlumbingPermit Issued21 PLUMBING & HEATING INC06/09/2021
DOB NOWGeneral ConstructionPermit IssuedARX DESIGN MANAGEMENT LLC05/07/2021
DOB NOWPlumbingSigned-offBYPASS MECHANICAL CORP10/15/2020
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP10/07/2019
DOB NOWSidewalk ShedSigned-offROCK GROUP NY CORP07/31/2018
BISPLISSUEDAP PLUMBING & HVAC LLC08/21/2023
BISPLISSUEDPLUMBING & HTG DOCTOR INC06/30/2022
BISPLISSUEDPLUMBING & HTG DOCTOR INC12/02/2020
BISOTISSUEDTRI STATE CONSTRUCTION OF07/01/2020
BISOTISSUEDA DAMIAN CONSTRUCTION INC05/03/2019
BISOTISSUEDA DAMIAN CONSTRUCTION INC05/03/2019
BISPLISSUEDPLUMBING & HTG DOCTOR INC01/29/2019
BISOTISSUEDA DAMIAN CONSTRUCTION INC01/02/2019
BISOTISSUEDA DAMIAN CONSTRUCTION INC01/02/2019
BISPLISSUEDPLUMBING & HTG DOCTOR INC11/13/2018
BISOTISSUEDA DAMIAN CONSTRUCTION INC10/24/2018
BISPLISSUEDDOUG'S PLBG & HTG SERV CO11/24/2017
BISOTISSUEDA DAMIAN CONSTRUCTION INC11/22/2017
BISPLISSUEDAC MECHANICAL P&H03/29/2017
BISOTISSUEDA DAMIAN CONSTRUCTION INC07/15/2016
BISOTISSUEDACO-DEL GROUP COMPANY INC01/30/2014
BISPLISSUEDAC MECHANICAL P&H12/06/2013
BISOTISSUEDACO-DEL GROUP COMPANY INC11/14/2013
BISPLISSUEDDEMAR PLUMBING CORP11/24/2010
BISPLISSUEDAC MECHANICAL P&H08/23/2006
BISPLISSUEDAC MECHANICAL P&H08/23/2006
BISPLISSUEDDYCKMAN PLBG &HTG CORP01/04/2006
BISOTISSUEDCERTIFIED OF N.Y. INC11/17/2005
BISPLRE-ISSUEDPIPEWORKS PLBG CORP08/22/2005
BISPLISSUEDAC MECHANICAL P&H11/17/2004
BISOTISSUEDBRADFORD GENERAL CONTRACTORS CO10/15/2004
BISPLISSUEDR&A HEATING & CONTRG CO.I08/19/2002
BISOTISSUEDARCON CONSTR OF NY INC.03/19/2002
BISOTISSUEDARCON CONSTRUCTION OF NEW YORK11/27/2001
1 project · most recent 02/03/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
02/03/2021Permit IssuedARX DESIGN MANAGEMENT LLCAir Conditioning Systems
Cooling
Lg LMU180HHV 2,295 CFM · Vrf Outdoor ×1
LSN090HEV2 953 CFM · Split System ×1
LSN090HSV5 268 CFM · Split System ×1
LSU090HEV2 953 CFM · Heat Pump Outdoor ×1
2 projects · most recent 04/07/2026
Water/Sanitary Gas
FiledStatusContractorScope
04/07/2026——Water/Sanitary
10/27/2021Permit Issued21 PLUMBING & HEATING INCGas, Water/Sanitary
7 projects · most recent 06/07/2021
General Wiring
FiledStatusContractorScope
06/07/2021Permit IssuedAKAY ELECTRIC CORPORATIONGeneral Wiring
01/07/2021Permit IssuedL.D.M. ELECTL CONTRS INC1 meters
01/05/2021CompleteL.D.M. ELECTL CONTRS INCGeneral Wiring
12/24/2020CompleteASKO ELEC CONST & MAIN INGeneral Wiring
02/20/2019Permit IssuedL.D.M. ELECTL CONTRS INCGeneral Wiring
07/24/2018CompleteTOP SHELF ELECTRIC CORP—
07/20/2018CompleteTOP SHELF ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
07/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/23/2021Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/23/2021Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 6
DateRequirementInspectorRole
03/13/2026Fire-Resistant Penetrations and Jointsstephan thimmespecial
02/12/2021HVAC-R and service water heating equipmentOLULADE ADEMOKUNenergy_progress
01/13/2021Energy Code Compliance InspectionsJohn Cunninghamprogress
01/13/2021Lighting in dwelling unitsJohn Cunninghamenergy_progress
01/13/2021Mechanical SystemsOLULADE ADEMOKUNspecial
01/13/2021FinalJohn Cunninghamprogress
▾Documents — 267 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch - Plumbing3
09/05/2026M00306037-I1Request digital key ↗
08/15/2026M00453358-I1Request digital key ↗
08/15/2026M00453358-P1Request digital key ↗
▸DOB NOWPlans/Sketch3
09/06/2026M00063815-I1Request digital key ↗
08/18/2026M01370274-I1Request digital key ↗
08/18/2026M01370274-S1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/15/2026M00453302-I1Request digital key ↗
▸DOB NOWPlans/Sketch - General Construction1
08/15/2026M00453302-I1Request digital key ↗
▸Applications & Permits58
▸BISPLAN / WORK APPROVAL APPLICATION32
11/01/2022123555777Open ↗
10/14/2022123555777Open ↗
08/03/2022123555777Open ↗
Showing 3 of 32 on file for this type
▸BISWORK PERMIT APPLICATION20
08/21/2023123555777Open ↗
06/30/2022123555777Open ↗
07/01/2020123742129Open ↗
Showing 3 of 20 on file for this type
▸DOB NOWLPC Approval/Permit6
08/13/2026M01370274-S1Open ↗
08/13/2026M01370274-I1Open ↗
08/13/2026M00306037-I1Open ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications37
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION22
02/20/2020123734860Open ↗
02/03/2020123734860Open ↗
01/06/2020123742129Open ↗
Showing 3 of 22 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
09/05/2026M00306037-I1Open ↗
09/03/2026M00453358-I1Open ↗
09/03/2026M00453358-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026M00453302-I1Open ↗
09/01/2026M00453302-I1Open ↗
09/01/2026M00453302-I1Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature2
09/01/2026M00453302-I1Open ↗
08/29/2026M01370274-S1Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Trade Schedules & Equipment28
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE16
10/14/2022123555777Open ↗
02/20/2020123734860Open ↗
02/03/2020123734860Open ↗
Showing 3 of 16 on file for this type
▸BISSCHEDULE B - PLUMBING7
11/01/2022123555777Open ↗
12/17/2020123555777Open ↗
11/24/2020123555777Open ↗
Showing 3 of 7 on file for this type
▸BISSELF-CERT PLUMBING NOTICE3
09/17/2014121789939Open ↗
09/12/2014121789939Open ↗
Showing 2 of 3 on file for this type
▸BISSCHEDULE C - HEATING & COMBUSTION EQUIPMENT1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸BISBOILERS - SUPPORTING DOCUMENTATION1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Safety & Tenant Protection14
▸BISTenant Protection Plan and Notes8
01/06/2020123742129Open ↗
05/07/2019123734860Open ↗
12/18/2018123555777Open ↗
Showing 3 of 8 on file for this type
▸BISSTREET TREE CHECKLIST5
01/06/2020123742129Open ↗
05/07/2019123734860Open ↗
10/04/2017122832293Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTenant Protection Plan1
08/13/2026M00306037-I1Open ↗
▸Environmental & Asbestos16
▸BISASBESTOS: CERTIFICATION (DEP ACP5)9
01/06/2020123742129Open ↗
01/06/2020123742129Open ↗
01/06/2020123742129Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
09/05/2026M00306037-I1Open ↗
09/03/2026M00453358-P1Open ↗
08/18/2026M01370274-S1Open ↗
Showing 3 of 6 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Energy Compliance18
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS9
02/20/2020123734860Open ↗
02/03/2020123734860Open ↗
01/06/2020123742129Open ↗
Showing 3 of 9 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS4
04/26/2021123742129Open ↗
05/15/2020122832293Open ↗
06/06/2017122708472Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
04/26/2021123742129Open ↗
05/15/2020122832293Open ↗
03/31/2020123742129Open ↗
▸BISENERGY CODE 1ST REVIEW COMPLETE2
11/23/2018123555777Open ↗
10/15/2018123482873Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
08/01/2022123555777Open ↗
04/26/2021123742129Open ↗
05/15/2020122832293Open ↗
▸Approvals, Objections & Sign-offs22
▸BISLANDMARKS APPROVAL10
05/22/2020123734860Open ↗
03/31/2020123742129Open ↗
11/25/2019123482873Open ↗
Showing 3 of 10 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST7
04/26/2021123742129Open ↗
05/20/2020122832293Open ↗
11/25/2019123482873Open ↗
Showing 3 of 7 on file for this type
▸BISLETTERS - APPROVED FABRICATION CERTIFICATIONS2
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 2 on file for this type
▸BISSUPERSEDING LETTER1
08/21/2023123555777Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
05/22/2020123734860Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Cost, Insurance & Ownership23
▸BISCOST AFFIDAVIT23
04/26/2021123742129Open ↗
05/15/2020122832293Open ↗
03/31/2020123742129Open ↗
Showing 3 of 23 on file for this type
▸Filing & Intake Forms39
▸BISADDITIONAL INFORMATION17
11/24/2020123555777Open ↗
03/31/2020123742129Open ↗
09/13/2019123482873Open ↗
Showing 3 of 17 on file for this type
▸BISBOROUGH INTAKE FORM13
08/21/2023123555777Open ↗
07/05/2022123555777Open ↗
02/20/2020123734860Open ↗
Showing 3 of 13 on file for this type
▸BISEFILING COVER SHEET9
01/06/2020123742129Open ↗
05/07/2019123734860Open ↗
11/23/2018123555777Open ↗
Showing 3 of 9 on file for this type
▸Other Documents1
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION1
03/31/2020123742129Open ↗