← Back
Walk-up cooperative
153 WEST 95 STREET
MANHATTAN · BIN 1032592
💬 Discuss this project
1910Year Built
3Stories
C6Building Class
R7-2Zoning
4,088 sfGross Floor Area
3Units
Rent Stabilized0 Open Violations
Walk-up cooperative · Owner of record: 153 WEST 95TH HOUSING CORP. · 1,800 sf lot · 2.27 FAR built · Flood zone X
Locations of Work
Structural
Roof1p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
GP 2202307/08/2026
153 WEST 95TH HOUSING CORP.203/22/2026
153 W 95 HOUSING COPR103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STUDIOTEKA DESIGN605/12/2025
LA WIPPLINGER, PE104/22/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S M EXPEDITING1403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SENAD MEHOVICElectrical803/21/2026
KACI NY CORPGeneral Contractor707/08/2026
CARA PLUMBING GROUP INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
CITY-WIDE TESTING INC416204/26/2022
Building Lifecycle
All (50)Filed (7)Permit Issued (5)Signed Off (3)Violation (8)Inspection (3)Objection (14)Special Inspection (10)
06/24/2026
Signed off — Alteration
REMOVAL FIXTURES & APPLIANCES IN EXISTING STUDIO 7 EXISTING KIT & INSTALL NEW ONES IN THE PROPOSED KITCHENETTE ON EXISTING ROUGHING. REPLACED SINKS IN BATHROOM 1 BATHROOM 2 ON EXISTING ROUGHING. REMOVE TOILET IN POWDER ROOM. INSTALL ELECETRICW/D IN BEDROO
M00584693-I1
06/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Vanessa Keith
06/09/2025
Objection resolved — Addressed
05/28/2025
Objection raised — Admin
05/12/2025
Filed — Alteration
REMOVAL FIXTURES & APPLIANCES IN EXISTING STUDIO 7 EXISTING KIT & INSTALL NEW ONES IN THE PROPOSED KITCHENETTE ON EXISTING ROUGHING. REPLACED SINKS IN BATHROOM 1 BATHROOM 2 ON EXISTING ROUGHING. REMOVE TOILET IN POWDER ROOM. INSTALL ELECETRICW/D IN BEDROO
M00584693-P4
03/05/2025
Permit issued — Plumbing
M00584693-I1-PL
03/05/2025
Special inspection requirement — Energy Code Compliance Inspections
Vanessa Keith
01/28/2025
Objection resolved — Addressed
01/22/2025
Objection raised — Scope
01/16/2025
Filed — Alteration
REMOVAL FIXTURES & APPLIANCES IN EXISTING STUDIO 7 EXISTING KIT & INSTALL NEW ONES IN THE PROPOSED KITCHENETTE ON EXISTING ROUGHING. REPLACED SINKS IN BATHROOM 1 BATHROOM 2 ON EXISTING ROUGHING. REMOVE TOILET IN POWDER ROOM. INSTALL ELECETRICW/D IN BEDROO
M00584693-P3
11/26/2024
Signed off — Alteration
new foundation for rear addition, Framing work for addition's roof and for relocated interior convenience stair as shown on plan. No change in use, egress or occupancy
M00590358-I1
04/01/2024
Violation issued (HPD, closed)
A
02/08/2024
Signed off — Alteration
M00584671-I1
10/06/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
07/27/2023
Objection resolved — Addressed
07/26/2023
Objection raised — Scope
07/13/2023
Filed — Alteration
REMOVAL FIXTURES & APPLIANCES IN EXISTING STUDIO 7 EXISTING KIT & INSTALL NEW ONES IN THE PROPOSED KITCHENETTE ON EXISTING ROUGHING. REPLACED SINKS IN BATHROOM 1 BATHROOM 2 ON EXISTING ROUGHING. REMOVE TOILET IN POWDER ROOM. INSTALL ELECETRICW/D IN BEDROO
M00584693-P2
06/20/2023
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/20/2023
Special inspection requirement — Energy Code Compliance Inspections
Vanessa Keith
06/09/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
04/24/2023
Filed — Alteration
REMOVAL FIXTURES & APPLIANCES IN EXISTING STUDIO 7 EXISTING KIT & INSTALL NEW ONES IN THE PROPOSED KITCHENETTE ON EXISTING ROUGHING. REPLACED SINKS IN BATHROOM 1 BATHROOM 2 ON EXISTING ROUGHING. REMOVE TOILET IN POWDER ROOM. INSTALL ELECETRICW/D IN BEDROO
M00584693-P1
04/24/2023
Special inspection requirement — Energy Code Compliance Inspections
Vanessa Keith
11/15/2022
Permit issued — Plumbing
M00584693-I1-PL
11/03/2022
Permit issued — General Construction
M00584671-I1-GC
10/15/2022
Permit issued — Structural
M00590358-I1-GC-CX
10/13/2022
Permit issued — General Construction
M00584671-I1-GC
06/08/2022
Special inspection requirement — Concrete - Cast-In-Place
ELIAS RASABI
05/04/2022
Objection raised — Other
05/04/2022
Objection resolved — Addressed
04/29/2022
Objection raised — Other
04/29/2022
Objection resolved — Addressed
04/29/2022
Objection raised — Other
04/29/2022
Objection resolved — Addressed
04/29/2022
Objection raised — Other
04/29/2022
Objection resolved — Addressed
04/26/2022
Filed — Alteration
M00584671-I1
04/22/2022
Filed — Alteration
new foundation for rear addition, Framing work for addition's roof and for relocated interior convenience stair as shown on plan. No change in use, egress or occupancy
M00590358-I1
04/21/2022
Filed — Alteration
REMOVAL FIXTURES & APPLIANCES IN EXISTING STUDIO 7 EXISTING KIT & INSTALL NEW ONES IN THE PROPOSED KITCHENETTE ON EXISTING ROUGHING. REPLACED SINKS IN BATHROOM 1 BATHROOM 2 ON EXISTING ROUGHING. REMOVE TOILET IN POWDER ROOM. INSTALL ELECETRICW/D IN BEDROO
M00584693-I1
04/15/2022
Special inspection requirement — Structural Steel - Details
ELIAS RASABI
04/15/2022
Special inspection requirement — Structural Cold-Formed Steel
ELIAS RASABI
09/08/2021
Special inspection requirement — Structural Stability – Alterations of existing buildings
ELIAS RASABI
09/08/2021
Special inspection requirement — Final
ELIAS RASABI
09/08/2021
Special inspection requirement — Footing and Foundation
ELIAS RASABI
11/27/2018
Violation issued (ECB, closed)
Construction
05/02/2003
Violation issued (ECB, closed)
Construction
03/19/2003
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/26/2002
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/29/1995
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/01/1994
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY03/05/2025
DOB NOWPlumbingSigned-offPRIME PLMBG & HTG OF NY11/15/2022
DOB NOWGeneral ConstructionSigned-offKACI NY CORP11/03/2022
DOB NOWStructuralSigned-offKACI NY CORP10/15/2022
DOB NOWGeneral ConstructionSigned-offKACI NY CORP10/13/2022
BISOTISSUEDSUNSHINE GEN. CONST.11/09/1999
1 project · most recent 05/12/2025
Gas Water/Sanitary
FiledStatusContractorScope
05/12/2025Signed-offCARA PLUMBING GROUP INCGas, Water/Sanitary
3 projects · most recent 11/24/2025
General Wiring
FiledStatusContractorScope
11/24/2025Permit IssuedPK ELECTRIC INC5 meters
07/02/2025Permit IssuedE & M ELECTRICAL NY CORPGeneral Wiring
08/19/2021CompleteJEM ELEC'L CONTR. CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
10/06/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/20/2023Pass-Final PL - Up to 3 Requested FloorsPassView ↗
06/09/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
06/18/2025Energy Code Compliance InspectionsVanessa Keithprogress
03/05/2025Energy Code Compliance InspectionsVanessa Keithprogress
06/20/2023Energy Code Compliance InspectionsVanessa Keithprogress
04/24/2023Energy Code Compliance InspectionsVanessa Keithprogress
06/08/2022Concrete - Cast-In-PlaceELIAS RASABIspecial
04/15/2022Structural Steel - DetailsELIAS RASABIspecial
04/15/2022Structural Cold-Formed SteelELIAS RASABIspecial
09/08/2021Structural Stability – Alterations of existing buildingsELIAS RASABIspecial
09/08/2021FinalELIAS RASABIprogress
09/08/2021Footing and FoundationELIAS RASABIprogress
▾Documents — 35 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
09/02/2026M00584671-I1Request digital key ↗
08/23/2026M00584693-P4Request digital key ↗
08/23/2026M00584693-P3Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026M00584671-I1Open ↗
▸Seals & Professional Certifications13
▸DOB NOWDPL-1: Design Professional Seal & Signature6
09/02/2026M00584671-I1Open ↗
08/23/2026M00584693-P3Open ↗
08/23/2026M00584693-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature6
09/01/2026M00590358-I1Open ↗
09/01/2026M00590358-I1Open ↗
08/26/2026M00584693-I1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature1
09/01/2026M00590358-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026M00584671-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report8
09/02/2026M00584671-I1Open ↗
08/23/2026M00584693-P4Open ↗
08/23/2026M00584693-P3Open ↗
Showing 3 of 8 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026M00584671-I1Open ↗
▸Other Documents3
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026M00584671-I1Open ↗
▸DOB NOWPlot Diagram1
08/13/2026M00584671-I1Open ↗
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026M00584671-I1Open ↗