← Back
BuildNYC
Zoned residential, not Manhattan
Bergen Brooklyn
1530 BERGEN STREET · BIN 3833616
💬 Discuss this project
0Year Built
—Stories
V0Building Class
R6Zoning
0 sfGross Floor Area
0Units
2 Active Violations ▸FDNY Report ↗
Zoned residential, not Manhattan · 3,066 sf lot · 0 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentCivilGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofTemporary pipe scaffold installationUnder Construction79p · 4 filings · 20 docs
BulkheadUnder Construction3p · 1 filing · 20 docs
Floor 6Temporary pipe scaffold installationUnder Construction74p · 2 filings · 20 docs
Floor 5Temporary pipe scaffold installationUnder Construction36p · 2 filings · 20 docs
Floor 4Temporary pipe scaffold installationUnder Construction60p · 2 filings · 20 docs
Floor 3Temporary pipe scaffold installationUnder Construction59p · 2 filings · 20 docs
Floor 2Temporary pipe scaffold installationUnder Construction45p · 2 filings · 20 docs
Floor 1Temporary pipe scaffold installationUnder Construction91p · 2 filings · 20 docs
CellarUnder Construction75p · 1 filing · 20 docs
Site & exteriorTemporary sidewalk shed installationUnder Construction92p · 5 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Xia Development103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Arc Architecture + Design Studio410/16/2026
Soni Engineering Consulting607/14/2026
JRS Consulting304/16/2026
SH Engineering404/01/2026
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Arc Architecture + Design Studio503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Xia BuildersGeneral Contractor607/08/2026
Core Scaffold SystemsScaffold509/12/2026
Xia BuildersScaffold107/08/2026
Jem Fire PreventionFire Protection107/04/2026
W.R. Plumbing and HeatingPlumbing107/04/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616710/16/2026
Building Lifecycle
All (101)Filed (17)Permit Issued (14)Violation (2)Inspection (2)Objection (33)Special Inspection (30)Tax Incentive (3)
02/01/2027
485-x construction completed
10/16/2026
Filed — New Building
PROPOSED FOUNDATION WORK FILING #B01266301-S6 IN CONJUNCTION WITH G/C FILING #B01266301-I1
B01266301-P3
10/14/2026
Special inspection requirement — Metering
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Protection of exposed foundation insulation
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Fenestration areas
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Exterior lighting power
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Electric vehicle service equipment requirements
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Fire-Resistance Rated Construction
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Lighting controls
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Lighting in dwelling units
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Fenestration air leakage
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Electrical motors and elevators
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Air barrier - visual inspection
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Insulation placement and R values
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Exterior Insulation and Finish Systems (EIFS)
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Combustible Exterior Wall Coverings
SHAHRIAR QUAYYUM
10/14/2026
Special inspection requirement — Interior lighting power
SHAHRIAR QUAYYUM
10/07/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/26/2026
Violation issued (ECB, open)
Unknown
09/10/2026
Permit issued — Sidewalk Shed
B01416242-I1-SH
07/21/2026
Violation issued (ECB, open)
Construction
07/16/2026
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/14/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01416246-P1
07/02/2026
Permit issued — Sprinklers
B01266301-S9-PL
07/02/2026
Permit issued — Plumbing
B01266301-S9-EW-SP
06/30/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01416242-P1
06/30/2026
Permit issued — Curb Cut
B01266301-S2-CC
06/17/2026
Permit issued — Supported Scaffold
B01417275-I1-SF
06/17/2026
Permit issued — Protection and Mechanical Methods
B01417277-I1-PMM
06/17/2026
485-x registration filed
06/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01417275-I1
06/16/2026
Filed — Alteration
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01417277-I1
06/15/2026
Permit issued — Sidewalk Shed
B01416242-I1-SH
06/15/2026
Permit issued — General Construction
B01266301-I1-GC
06/12/2026
Filed — Alteration
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01416242-I1
06/12/2026
Filed — Alteration
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01416246-I1
06/12/2026
Permit issued — Mechanical Systems
B01266301-S3-MS
06/12/2026
Permit issued — Protection and Mechanical Methods
B01416246-I1-PMM
06/05/2026
Permit issued — Construction Fence
B01266301-S1-FN
05/29/2026
Permit issued — Structural
B01266301-S7-ST
05/29/2026
Permit issued — Foundation
B01266301-S6-FO
05/29/2026
485-x construction commenced
05/28/2026
Permit issued — Support of Excavation
B01266301-S5-SE
04/16/2026
Filed — New Building
PROPOSED FOUNDATION WORK FILING #B01266301-S6 IN CONJUNCTION WITH G/C FILING #B01266301-I1
B01266301-S9
04/16/2026
Objection resolved — Resolved
04/16/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
SHAHRIAR QUAYYUM
04/16/2026
Special inspection requirement — HVAC-R and service water heating equipment
SHAHRIAR QUAYYUM
04/16/2026
Special inspection requirement — Maintenance information
SHAHRIAR QUAYYUM
04/16/2026
Special inspection requirement — HVAC-R and service water heating system controls
SHAHRIAR QUAYYUM
04/16/2026
Special inspection requirement — Energy Code Compliance Inspections
SHAHRIAR QUAYYUM
04/16/2026
Special inspection requirement — Post-installed Anchors
SHAHRIAR QUAYYUM
04/16/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
SHAHRIAR QUAYYUM
04/10/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
SHAHRIAR QUAYYUM
04/10/2026
Special inspection requirement — Structural Steel - Details
SHAHRIAR QUAYYUM
04/10/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
SHAHRIAR QUAYYUM
Latest 60 of 101 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems09/10/2026
DOB NOWPlumbingPermit IssuedW.R. Plumbing and Heating07/02/2026
DOB NOWSprinklersPermit IssuedJem Fire Prevention07/02/2026
DOB NOWCurb CutPermit IssuedXia Builders06/30/2026
DOB NOWSupported ScaffoldPermit IssuedCore Scaffold Systems06/17/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems06/17/2026
DOB NOWSidewalk ShedPermit IssuedCore Scaffold Systems06/15/2026
DOB NOWGeneral ConstructionPermit IssuedXia Builders06/15/2026
DOB NOWMechanical SystemsPermit IssuedXia Builders06/12/2026
DOB NOWProtection and Mechanical MethodsPermit IssuedCore Scaffold Systems06/12/2026
DOB NOWConstruction FencePermit IssuedXia Builders06/05/2026
DOB NOWStructuralPermit IssuedXia Builders05/29/2026
DOB NOWFoundationPermit IssuedXia Builders05/29/2026
DOB NOWSupport of ExcavationPermit IssuedXia Builders05/28/2026
1 project · most recent 10/16/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/16/2026Permit IssuedXia BuildersHeating and Air Conditioning Systems
Heat / Cool
Mitsubishi Electric MXZ-3C30NAHZ4 28,600 BTU · Condensing Unit ×16
MXZ-SM36NAMHZ 49,000 BTU · Condensing Unit ×9
PURY-P96TNU-A(-BS) 8 tons · Vrf Outdoor ×1
PUZ-AK12NL 9,400 BTU · Condensing Unit ×1
1 project · most recent 10/16/2026
Sprinkler System
FiledStatusContractorScope
10/16/2026Permit IssuedJem Fire PreventionSprinkler System
1 project · most recent 10/16/2026
Storm Water/Sanitary
FiledStatusContractorScope
10/16/2026Permit IssuedW.R. Plumbing and HeatingStorm, Water/Sanitary
4 projects · most recent 08/20/2026
General Wiring
FiledStatusContractorScope
08/20/2026Permit IssuedKwong Ming ElectricGeneral Wiring
06/23/2026Permit IssuedPower Direct ElectricGeneral Wiring
06/19/2026Permit IssuedPower Direct Electric—
06/15/2026Permit IssuedSolas Electrical—
1 project · most recent 10/16/2026
Concrete
FiledStatusContractorScope
10/16/2026Permit IssuedJem Fire PreventionConcrete
3 projects · most recent 10/16/2026
Fence Sidewalk Shed Scaffold
FiledStatusContractorScope
10/16/2026Permit IssuedJem Fire PreventionFence
06/30/2026Permit IssuedCore Scaffold SystemsSidewalk Shed
06/16/2026Permit IssuedCore Scaffold SystemsScaffold
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
10/07/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/16/2026Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 79
DateRequirementInspectorRole
10/14/2026Protection of exposed foundation insulationSHAHRIAR QUAYYUMenergy_progress
10/14/2026Electric vehicle service equipment requirementsSHAHRIAR QUAYYUMenergy_progress
10/14/2026Lighting in dwelling unitsSHAHRIAR QUAYYUMenergy_progress
10/14/2026Fenestration areasSHAHRIAR QUAYYUMenergy_progress
10/14/2026Insulation placement and R valuesSHAHRIAR QUAYYUMenergy_progress
10/14/2026Electrical motors and elevatorsSHAHRIAR QUAYYUMenergy_progress
10/14/2026Exterior lighting powerSHAHRIAR QUAYYUMenergy_progress
10/14/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
10/14/2026Fenestration air leakageSHAHRIAR QUAYYUMenergy_progress
10/14/2026Air barrier - visual inspectionSHAHRIAR QUAYYUMenergy_progress
10/14/2026MeteringSHAHRIAR QUAYYUMenergy_progress
10/14/2026Combustible Exterior Wall CoveringsSHAHRIAR QUAYYUMspecial
10/14/2026Exterior Insulation and Finish Systems (EIFS)SHAHRIAR QUAYYUMspecial
10/14/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
10/14/2026Wall Panels, Curtain Walls, and VeneersSHAHRIAR QUAYYUMspecial
10/14/2026Energy Code Compliance InspectionsSHAHRIAR QUAYYUMprogress
10/14/2026Fire-Resistance Rated ConstructionSHAHRIAR QUAYYUMprogress
10/14/2026Fenestration and door U-factor and product ratingsSHAHRIAR QUAYYUMenergy_progress
10/14/2026Interior lighting powerSHAHRIAR QUAYYUMenergy_progress
10/14/2026Lighting controlsSHAHRIAR QUAYYUMenergy_progress
04/16/2026HVAC-R and service water heating system controlsSHAHRIAR QUAYYUMenergy_progress
04/16/2026Maintenance informationSHAHRIAR QUAYYUMenergy_progress
04/16/2026HVAC-R and service water heating equipmentSHAHRIAR QUAYYUMenergy_progress
04/16/2026HVAC-R and service water piping design and insulationSHAHRIAR QUAYYUMenergy_progress
04/16/2026Fire-Resistant Penetrations and JointsSHAHRIAR QUAYYUMspecial
Latest 25 of 79.
▾Documents — 89 on file (BIS + DOB NOW)
▸Plans & Drawings17
▸DOB NOWPlans/Sketch17
08/17/2026B01266301-I1Request digital key ↗
08/17/2026B01266301-P2Request digital key ↗
08/17/2026B01266301-S2Request digital key ↗
Showing 3 of 17 on file for this type
▸Applications & Permits2
▸BISBPP-5 - Authorization to the Department of Transportation1
08/14/2025340919812Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
08/14/2025340919812Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
10/18/2026B01266301-P3Open ↗
08/13/2026B01266301-I1Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp2
10/18/2026B01266301-P3Open ↗
08/13/2026B01266301-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
10/18/2026B01266301-P3Open ↗
08/13/2026B01266301-I1Open ↗
▸Seals & Professional Certifications42
▸DOB NOWDPL-1: Design Professional Seal & Signature17
08/17/2026B01266301-S3Open ↗
08/17/2026B01266301-I1Open ↗
08/17/2026B01266301-P2Open ↗
Showing 3 of 17 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
10/18/2026B01266301-P3Open ↗
10/18/2026B01266301-P3Open ↗
10/18/2026B01266301-P3Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
10/18/2026B01266301-P3Open ↗
10/18/2026B01266301-P3Open ↗
08/30/2026B01266301-S3Open ↗
Showing 3 of 11 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
08/14/2025340919812Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/14/2025340919812Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026B01266301-I1Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
10/18/2026B01266301-P3Open ↗
08/17/2026B01266301-I1Open ↗
▸BISSTREET TREE CHECKLIST1
08/14/2025340919812Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/17/2026B01266301-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/21/2026B01266301-I1Open ↗
▸Energy Compliance1
▸DOB NOWPreliminary Commissioning Report Certification1
08/17/2026B01266301-S3Open ↗
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT3
08/17/2026B01266301-P1Open ↗
08/13/2026B01266301-S6Open ↗
08/13/2026B01266301-S5Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram2
08/17/2026B01266301-S6Open ↗
08/17/2026B01266301-S5Open ↗
▸DOB NOWTR4: Test Report and Plot Diagram2
08/13/2026B01266301-S6Open ↗
08/13/2026B01266301-S5Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
08/14/2025340919812Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
10/18/2026B01266301-P3Open ↗
08/13/2026B01266301-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
10/18/2026B01266301-P3Open ↗
08/13/2026B01266301-I1Open ↗
▸DOB NOWProperty Ownership Certification2
10/18/2026B01266301-P3Open ↗
08/17/2026B01266301-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/17/2026B01266301-S5Open ↗