Elevator cooperative
1530 EAST 8 STREET
BROOKLYN · Mapleton-Midwood (West) · BIN 3175038
💬 Discuss this project
1963Year Built
6Stories
D4Building Class
R5Zoning
98,417 sfGross Floor Area
91Units
LL97 CoveredRent Stabilized10 Open Violations ▸FISP: SWARMPFDNY Report ↗
Elevator cooperative · Owner of record: 1530 EAST 8TH ST CORP · 24,120 sf lot · 4.08 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbingEquipmentGeneral
Permit Issued — active, not yet Signed-off
RoofUnder Construction1p · 2 filings · 9 docs
Floor 62p · 1 filing · 16 docs
Floor 53p · 2 filings · 20 docs
Floor 42p · 1 filing · 16 docs
Floor 32p · 1 filing · 16 docs
Floor 22p · 1 filing · 16 docs
Floor 12p · 1 filing · 16 docs
Cellar20p · 2 filings · 20 docs
Sub-BasementUnder Construction5p · 1 filing · 6 docs
Site & exteriorUnder Construction12p · 3 filings · 10 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1530 EAST 8TH STREET607/08/2026
T-MOBILE503/21/2026
TKR PROPERTY SERVICES, INC.303/21/2026
1530 E 8 STREET303/21/2026
1530 E8 ST OWNERS203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ASHRAF CORP107/22/2025
SPAR UNLIMITED LLC305/14/2025
SERDAR CEYLAN ARCHITECT, PC309/20/2023
JAMES SCHAEFER ARCHITECT, P.C105/12/2022
BAILEYS ENGINEERING PC109/27/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS203/21/2026
Rigid Structural Design, LLC203/21/2026
AE DESIGN SOLUTION203/21/2026
COMMERCIAL CAPITAL USA203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ANDAMIO SCAFFOLDING LLCGeneral Contractor407/19/2026
ALL STANDARD CONSTRUCTIONGeneral Contractor303/21/2026
CANIDO BASONAS CONST SVCGeneral Contractor204/09/2026
EVEREST SCAFFOLDING INCGeneral Contractor107/08/2026
BOROWIDE ELECT'L CONTR'SElectrical103/22/2026
HYDRAULICS MECHANICAL INCPlumbing107/08/2026
GOTHAM WIRING LICENSEDElectrical103/22/2026
BAY RESTORATION CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SPAR UNLIMITED LLC5967305/14/2025
CEYLAN DESIGN AND CONSULT8422309/20/2023
JAMES SCHAEFER ARCHITECT,3763105/12/2022
Building Lifecycle
All (143)Filed (10)Permit Issued (10)Signed Off (3)Facade (FISP) (15)Violation (60)Inspection (10)Objection (16)Special Inspection (19)
07/17/2026
Permit issued — Sidewalk Shed
B01257878-I1-SH
06/26/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/04/2026
Violation issued (HPD, open)
A
02/12/2026
Permit issued — Suspended Scaffold
B01208241-I1-SC
11/17/2025
Permit issued — General Construction
B01029520-I1-GC-CX
07/22/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B01257878-I1
07/22/2025
Permit issued — Sidewalk Shed
B01257878-I1-SH
05/28/2025
Permit issued — Structural
B01029520-I1-GC-CX
05/14/2025
Filed — Alteration
FISP Repairs
B01029520-I1
05/14/2025
Special inspection requirement — Tenant Protection Plan Compliance
SCOTT PROFETA
04/22/2025
Permit issued — Suspended Scaffold
B01208241-I1-SC
04/18/2025
Filed — Alteration
Installation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.
B01208241-I1
03/10/2025
Violation issued (FDNY_NOV, closed)
08/13/2024
Special inspection requirement — Energy Code Compliance Inspections
SCOTT PROFETA
08/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SCOTT PROFETA
08/13/2024
Special inspection requirement — Fire-Resistance Rated Construction
SCOTT PROFETA
07/31/2024
Filed — Alteration CO
Convert portion of existing storage area to accessory tenant laundry area. Install new fire rated partitions and door.
B00703474-P1
07/15/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/03/2024
Special inspection requirement — Fire-Resistance Rated Construction
SCOTT PROFETA
07/03/2024
Special inspection requirement — Energy Code Compliance Inspections
SCOTT PROFETA
07/03/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
SCOTT PROFETA
04/02/2024
Special inspection requirement — Final
SCOTT PROFETA
12/14/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
10/18/2023
Signed off — Alteration
INSTALLING THE 2 SPRINKLER HEADS OVER DRYERS AND REGISTERING THE 5 DYERS AND 5 WASHERS IN EXISTING LAUNDRY ROOM AT CELLAR AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00769123-I1
10/13/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/04/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
10/03/2023
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
10/03/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
10/03/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
09/29/2023
Objection resolved — Addressed
09/22/2023
Objection raised — Admin
09/20/2023
Filed — Alteration
INSTALLING THE 2 SPRINKLER HEADS OVER DRYERS AND REGISTERING THE 5 DYERS AND 5 WASHERS IN EXISTING LAUNDRY ROOM AT CELLAR AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00769123-P2
09/12/2023
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
09/12/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
09/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
08/18/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
08/15/2023
Inspection — Certified Sprinkler (PL)-Sprinkler-Hydro
Certified
View inspection ↗
08/03/2023
Filed — Alteration
INSTALLING THE 2 SPRINKLER HEADS OVER DRYERS AND REGISTERING THE 5 DYERS AND 5 WASHERS IN EXISTING LAUNDRY ROOM AT CELLAR AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00769123-P1
08/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/01/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
SERDAR CEYLAN
08/01/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
SERDAR CEYLAN
08/01/2023
Special inspection requirement — Energy Code Compliance Inspections
SERDAR CEYLAN
07/20/2023
Inspection — Pass-Final PL - Up to 9 Requested Floors
Pass
View inspection ↗
05/22/2023
Permit issued — Plumbing
B00769123-I1-PL
05/03/2023
Permit issued — General Construction
B00703474-I1-GC
05/02/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/22/2023
Violation issued (HPD, closed)
A
11/30/2022
Objection resolved — Addressed
10/27/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
09/27/2022
Objection raised — Other
09/15/2022
Objection resolved — Addressed
09/15/2022
Objection resolved — Addressed
09/08/2022
Objection resolved — Addressed
09/08/2022
Objection resolved — Addressed
09/02/2022
Filed — Alteration
INSTALLING THE 2 SPRINKLER HEADS OVER DRYERS AND REGISTERING THE 5 DYERS AND 5 WASHERS IN EXISTING LAUNDRY ROOM AT CELLAR AS PER PLANS SUBMITTED. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B00769123-I1
08/17/2022
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/07/2022
Signed off — Alteration
Filing for removal of section of non-load bearing partition at existing kitchenette. Soffit to remain.
B00735395-I1
06/29/2022
Permit issued — General Construction
B00735395-I1-GC
05/24/2022
Objection resolved — Addressed
05/24/2022
Objection resolved — Addressed
Latest 60 of 143 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC07/17/2026
DOB NOWSuspended ScaffoldPermit IssuedCANIDO BASONAS CONST. COR02/12/2026
DOB NOWGeneral ConstructionPermit IssuedCANIDO BASONAS CONST SVC11/17/2025
DOB NOWSidewalk ShedPermit IssuedANDAMIO SCAFFOLDING LLC07/22/2025
DOB NOWStructuralPermit IssuedCANIDO BASONAS CONST SVC05/28/2025
DOB NOWSuspended ScaffoldPermit IssuedCANIDO BASONAS CONST. COR04/22/2025
DOB NOWPlumbingSigned-offHYDRAULICS MECHANICAL INC05/22/2023
DOB NOWGeneral ConstructionPermit IssuedBAY RESTORATION CORP05/03/2023
DOB NOWGeneral ConstructionSigned-offALL STANDARD CONSTRUCTION06/29/2022
DOB NOWSidewalk ShedSigned-offEVEREST SCAFFOLDING INC09/28/2018
BISOTISSUEDSQUAN CONSTRUCTION SERVIC03/03/2021
BISOTISSUEDSQUAN CONSTRUCTION SERVIC10/19/2020
BISOTISSUEDLEVEST ELECTRIC CORP01/10/2018
BISOTISSUEDTELCOM ENGINEERING GP INC01/31/2017
BISOTISSUEDTRIBORO CONTRACTING & REM09/24/2015
BISOTISSUEDBIG Z BUILDERS INC03/02/2015
BISEQISSUEDEVEREST SCAFFOLDING INC06/10/2014
BISOTISSUEDBIG Z BUILDERS INC03/04/2014
BISOTISSUEDBIG Z BUILDERS INC08/05/2013
BISEQISSUEDEVEREST SCAFFOLDING INC06/14/2013
BISEQISSUEDJ & G GENERAL CONTRACTING08/09/2010
BISEQISSUEDEVEREST SCAFFOLDING INC02/08/2008
BISOTISSUEDNEW AMSTERDAM RESTORATION GROUP09/26/2007
BISEQISSUEDEVEREST SCAFFOLDING INC08/02/2007
BISFBISSUEDG BAUER INC12/18/2003
BISPLISSUEDALAN E. ROSENBERG, INC.12/18/2003
BISOTISSUEDL & C BURNER01/15/2003
BISOTISSUEDAPPLIED ELECTRIC CORP.10/10/2001
BISOTISSUEDHAUSLER CONSTRUCTION09/22/2000
9 projects · most recent 08/05/2026
General Wiring
FiledStatusContractorScope
08/05/2026CompleteANTONIO CERIELLO ELEC INCGeneral Wiring
07/15/2025Permit IssuedBOROWIDE ELECT'L CONTR'S—
09/05/2024CompleteEMPIRE LIC ELECL CONTRSGeneral Wiring
10/12/2023CompleteETRICITY ELECTRICAL CO INGeneral Wiring
05/05/2022CompleteGEMINI ELECTRIC CO., INC.—
04/16/2020CompleteKILO WATT ELECTRIC CORPGeneral Wiring
11/20/2019CompleteSTAR ELEC'L CONTRACTORS C—
09/27/2018CompleteBOROWIDE ELECT'L CONTR'S—
04/12/2018CompleteGOTHAM WIRING LICENSEDGeneral Wiring
1 project · most recent 05/14/2025
Concrete
FiledStatusContractorScope
05/14/2025Permit IssuedCANIDO BASONAS CONST SVCConcrete
1 project · most recent 07/22/2025
Sidewalk Shed
FiledStatusContractorScope
07/22/2025Permit IssuedANDAMIO SCAFFOLDING LLCSidewalk Shed
1 project · most recent 04/18/2025
Suspended Scaffold (SC)
FiledStatusContractorScope
04/18/2025Permit IssuedCANIDO BASONAS CONST. CORSuspended Scaffold (SC)
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/26/2026Pass-Final CND-Occupancy InspectionPassView ↗
07/15/2024Pass-Final CND-Occupancy InspectionPassView ↗
12/14/2023Pass-Final CND-Occupancy InspectionPassView ↗
10/13/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/04/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/18/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
08/15/2023Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
07/20/2023Pass-Final PL - Up to 9 Requested FloorsPassView ↗
10/27/2022Pass-Final CND-Occupancy InspectionPassView ↗
08/17/2022Pass-Final CND-Occupancy InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
05/14/2025Tenant Protection Plan ComplianceSCOTT PROFETAspecial
08/13/2024Energy Code Compliance InspectionsSCOTT PROFETAprogress
08/13/2024Fire-Resistant Penetrations and JointsSCOTT PROFETAspecial
08/13/2024Fire-Resistance Rated ConstructionSCOTT PROFETAprogress
07/03/2024Fire-Resistance Rated ConstructionSCOTT PROFETAprogress
07/03/2024Energy Code Compliance InspectionsSCOTT PROFETAprogress
07/03/2024Fire-Resistant Penetrations and JointsSCOTT PROFETAspecial
04/02/2024FinalSCOTT PROFETAprogress
10/03/2023Energy Code Compliance InspectionsSERDAR CEYLANprogress
10/03/2023HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
10/03/2023Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
09/12/2023Energy Code Compliance InspectionsSERDAR CEYLANprogress
09/12/2023Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
09/12/2023HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
08/01/2023Fire-Resistant Penetrations and JointsSERDAR CEYLANspecial
08/01/2023HVAC-R and service water piping design and insulationSERDAR CEYLANenergy_progress
08/01/2023Energy Code Compliance InspectionsSERDAR CEYLANprogress
05/10/2022FinalJAMES SCHAEFERprogress
05/10/2022Fire-Resistant Penetrations and JointsJAMES SCHAEFERspecial
▾Documents — 144 on file (BIS + DOB NOW)
▸Plans & Drawings10
▸DOB NOWPlans/Sketch10
09/02/2026B00081276-I1Request digital key ↗
08/28/2026B00769123-P2Request digital key ↗
08/28/2026B00769123-P1Request digital key ↗
Showing 3 of 10 on file for this type
▸Applications & Permits20
▸BISPLAN / WORK APPROVAL APPLICATION10
08/15/2025321611369Open ↗
01/08/2018321611369Open ↗
06/30/2017321611369Open ↗
Showing 3 of 10 on file for this type
▸BISWORK PERMIT APPLICATION10
01/10/2018321611369Open ↗
01/31/2017321178934Open ↗
09/23/2015340306966Open ↗
Showing 3 of 10 on file for this type
▸Seals & Professional Certifications46
▸DOB NOWProgress Inspector Seal & Signature12
09/01/2026B00735395-I1Open ↗
09/01/2026B01029520-I1Open ↗
08/30/2026B00703474-P1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/02/2026B00081276-I1Open ↗
08/29/2026B00735395-I1Open ↗
08/28/2026B00769123-P2Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
03/21/2019321178934Open ↗
01/16/2019321178934Open ↗
01/10/2018321611369Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/01/2026B00735395-I1Open ↗
09/01/2026B01029520-I1Open ↗
08/30/2026B00703474-P1Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT3
09/23/2015340306966Open ↗
08/05/2013340077393Open ↗
06/13/2013340068982Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY3
09/23/2015340306966Open ↗
08/05/2013340077393Open ↗
06/13/2013340068982Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION3
09/23/2015340306966Open ↗
08/05/2013340077393Open ↗
06/13/2013340068982Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
08/09/2010320196989Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM1
08/10/2010320196989Open ↗
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026B00703474-I1Open ↗
08/13/2026B00703474-P1Open ↗
▸BISTenant Protection Plan and Notes1
06/30/2017321611369Open ↗
▸Environmental & Asbestos12
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B00769123-P2Open ↗
08/28/2026B00769123-P1Open ↗
08/28/2026B00769123-I1Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
06/30/2017321611369Open ↗
09/23/2015340306966Open ↗
08/05/2013340077393Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'2
08/10/2010320196989Open ↗
08/30/2007310021026Open ↗
▸Energy Compliance15
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
03/21/2019321178934Open ↗
01/16/2019321178934Open ↗
01/10/2018321611369Open ↗
Showing 3 of 4 on file for this type
▸BISENERGY CODE COMPLIANCE INSPECTIONS2
07/02/2025321611369Open ↗
07/02/2025321611369Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)2
08/20/2025321611369Open ↗
07/02/2025321611369Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS2
09/23/2015340306966Open ↗
08/05/2013340077393Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
07/02/2025321611369Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
03/21/2019321178934Open ↗
▸BISELECTRICAL APPLICATION FOR SIDEWALK SHED LIGHTING1
06/13/2013340068982Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY1
08/15/2025321611369Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00769123-I1Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/23/2015340306966Open ↗
08/05/2013340077393Open ↗
06/13/2013340068982Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
07/02/2025321611369Open ↗
▸Approvals, Objections & Sign-offs11
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
08/20/2025321611369Open ↗
03/21/2019321178934Open ↗
01/16/2019321178934Open ↗
Showing 3 of 4 on file for this type
▸BISADMINISTRATIVE OBJECTIONS3
10/06/2015321178934Open ↗
08/09/2010320196989Open ↗
08/30/2007310021026Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
08/20/2014340068982Open ↗
06/21/2014340068982Open ↗
▸BISFA LETTER OF DEFECT : FD-FALD1
12/13/2017321611369Open ↗
▸BISFINAL1
07/02/2025321611369Open ↗
▸Cost, Insurance & Ownership7
▸BISCOST AFFIDAVIT7
03/21/2019321178934Open ↗
01/16/2019321178934Open ↗
06/30/2017321611369Open ↗
Showing 3 of 7 on file for this type
▸Filing & Intake Forms11
▸BISADDITIONAL INFORMATION3
01/08/2018321611369Open ↗
02/16/2017321178934Open ↗
12/02/2013340068982Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET3
09/23/2015340306966Open ↗
08/05/2013340077393Open ↗
06/13/2013340068982Open ↗
▸BISEFILING COVER SHEET3
06/30/2017321611369Open ↗
09/23/2015321178934Open ↗
08/10/2010320196989Open ↗
▸BISBOROUGH INTAKE FORM2
03/21/2019321178934Open ↗
01/16/2019321178934Open ↗
▸Other Documents5
▸DOB NOWProperty Ownership Certification2
08/13/2026B00703474-P1Open ↗
08/13/2026B00703474-I1Open ↗
▸BISCOMMUNITY BOARD NOTIFICATION1
03/15/2019321178934Open ↗
▸DOB NOWManufacturer's Specifications1
08/13/2026B01208241-I1Open ↗
▸DOB NOWCalculations1
08/13/2026B01208241-I1Open ↗